| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.8 CrAdmitted-Finance | +25.71% | ₹4.8 Cr | L1 | Admitted-Finance |
Tender Value
₹3.8 Cr
EMD Value
₹7.6 L
Closing Date
2 Jul 2026, 6:00 pmClosed
Executive Engineer M and H, Dn. Bharatpur
Executive Engineer M and H, Dn. Bharatpur
Remaining Construction Work at CHC Khedli Gadasiya -Distt. Bharatpur (NHM-PIP-2017-18)
2026_MEDIC_570598_1
NIT No.07/2026-27 EE M and H DivBharatpur/
Open Tender
Civil Works
Percentage
300 days
Bharatpur
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
RTGS/NEFT/Any other money Transfer System
₹7.6 L
9 Jul 2026
23 Jun 2026
3 Jul 2026
23 Jun 2026
2 Jul 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Work : Surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of rubbish lead up to 50 Mtr. and lift up to 1.5 Mtr.: All kinds of soil | 2,335 | Sqm | 5.86 | ₹13,683.1 |
| 2 | Earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms, lift up to 1.5 Mtr. including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soil | 2,663.28 | Cum | 156 | ₹4,15,471.68 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. | 8,182.91 | Cum | 50 | ₹4,09,145.5 |
| 4 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 767.23 | Cum | 2,520 | ₹19,33,419.6 |
| 5 | Centering & Shuttering with plywood or steel sheets including strutting, propping, bracing bothways and removal of formwork for foundations in basements rafts, footings, strap beams bases of columns, etc. upto plinth level. | 1,152.99 | Sqm | 107 | ₹1,23,369.93 |
| 6 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. M20 grade Design Mix | 772.73 | Cum | 3,987 | ₹30,80,874.51 |
| 7 | Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcement for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc.
M20 grade Nominal Mix | 83 | Cum | 4,148 | ₹3,44,284 |
| 8 | Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for Beams, suspended floors, roofs, griders having slopes up to 15º, landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral staircases etc.
M20 grade Nominal Mix / Design Mix | 487.5 | Cum | 4,237 | ₹20,65,537.5 |
| 9 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. | 3,822 | Sqm | 193 | ₹7,37,646 |
| 10 | Columns, pillars, posts and struts etc. | 1,296 | Sqm | 216 | ₹2,79,936 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.42 MB
Tendernotice_2.pdf
PDF • 7.43 MB
Tendernotice_3.pdf
PDF • 2.57 MB
Tendernotice_4.pdf
PDF • 1.70 MB
1-FrontPage.pdf
Tender Documents • 0.02 MB
1-FinalBid.pdf
Tender Documents • 0.65 MB
BOQ_1015304.xls
BOQ • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .