Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAccepted-AOC NEAR PWD REST HOUSE MS ROAD KAILARAS DIST MORENA MP 476224 | MORENA | MADHYA PRADESH | 476224 | L1 | Accepted-AOC ACCEPTED AOC | |
| 2 | L2₹9.2 L+₹26,650.03 (2.97%)Rejected-AOC | L2 | Rejected-AOC REJECTED AOC | |
| 3 | L3₹9.8 L+₹86,196.74 (9.62%)Rejected-AOC | L3 | Rejected-AOC REJECTED AOC | |
| 4 | L4₹10.7 L+₹1.8 L (19.7%)Rejected-AOC | L4 | Rejected-AOC REJECTED AOC | |
| 5 | Rejected-Technical | - | Rejected-Technical DOCUMENT INCOMPLETE |
Tender Value
₹10.9 L
EMD Value
₹22,000
Closing Date
16 Feb 2019, 12:00 pmClosed
EE ICD KARWI
OFFICE OF THE EE ICD KARWI
Construction of Head Regulator of Sudinpur Minor at Km 4.400 of Rasin Right Main Canal.
2019_UPIDC_306805_3
06/EE/2018-19
Open Tender
Civil Works
Item Rate
90 days
KARWI
AS PER NIT
2 documents required · 2 mandatory
₹1,154
EE ICD
₹22,000
1 Mar 2021
11 Feb 2019
16 Feb 2019
11 Feb 2019
16 Feb 2019
11 Feb 2019
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work.
E/w excavation in foundation of MKR mixed soil including initial lead and lift etc. all complete. But excluding GST.
Supply and laying of coarse sand in foundation/floor including all cost of material labour T&P etc . All complete. But excluding GST.
Laying C.C. work 1:3:6 with cement course sand and stone grit 25 to 50 mm including all cost of material, labour, T&P and proper completion of work.But excluding GST.
R.C.R. Stone masonry with 1:4 cement course sand including all cost of material, labour: T&P and proper completion of work. But excluding GST.
Laying C.C. work 1:2:4 with cement course sand and stone grit 10 to 20 mm including all cost of material, labour, T&P and proper completion of work.But excluding GST.
Laying R.C.C. work 1:1.5:3 for slab with cement course sand and stone grit 10 to 20 mm including all cost of material, labour, T&P and proper completion of work. But excluding GST.
Steel Reinforcement for RCC work including cutting, placing & binding with GI wire etc. all complete But excluding GST.
Grouted Stone Pitching in 1:4 CM including all cost of material, labour, T&P and proper completion of work. But excluding GST.
Centering and Shuttering of C.C. Work including all material, labour T&P etc. all complete. But excluding GST.
Supply and Laying of Grit 10-20 mm under pitching including all material, labour, T&P etc. complete. But excluding GST.
Cement pointing in 1:2 cement mortor with coarse sand including all material, labour, T&P etc. complete. But excluding GST.
Earth Work in Back Filling with all cost of labour T&P etc all complete But excluding GST.
M/S SHIV PRASAD CONTRACTOR
M/s Radha Krishna Shukla Contractor
MS SHUBHAM CONSTRUCTION AND SUPPLIER
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .