| 1 | L1₹28.8 LAdmitted-Finance | ₹28.8 L | L1 | Admitted-Finance |
| 2 | L2₹31.4 LAdmitted-Finance | ₹31.4 L | L2 | Admitted-Finance |
| 3 | L3₹37.6 LAdmitted-Finance | ₹37.6 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Radha Krishan L1 | JABINA AKHTER BUTT L3 | SHALIMAR VIEW ELECTRICAL & CIVIL CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 1,950 | SQM | 5 ₹9,750 Lowest | 45 ₹87,750 | 100 ₹1,95,000 |
| 2.00 | Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive. In yard and drains | 230 | CUM | 50 ₹11,500 Lowest | 230 ₹52,900 | 90 ₹20,700 |
| 3.00 | Preparation of Structural design and drawings for RCC wall from structural engineer/consultant | 1 | JOB | 5,000 ₹5,000 Lowest | 50,000 ₹50,000 | 2,05,000 ₹2,05,000 |
| 4.00 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: | 230 | CUM | 201 ₹46,230 | 1,000 ₹2,30,000 | 115 ₹26,450 Lowest |
| 5.00 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) including all carraiges and supplies | 28.5 | CUM | 3,200 ₹91,200 Lowest | 5,000 ₹1,42,500 | 3,500 ₹99,750 |
| 6.00 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1.5:3 mix | 250 | CUM | 7,400 ₹18,50,000 | 8,800 ₹22,00,000 | 6,900 ₹17,25,000 Lowest |
| 7.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in \position and binding all complete above plinth level | 6,170 | KG | 86 ₹5,30,620 Lowest | 96 ₹5,92,320 | 100 ₹6,17,000 |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 710 | SQM | 221 ₹1,56,910 | 350 ₹2,48,500 | 190 ₹1,34,900 Lowest |
| 9.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited
layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.including all carraiges and supplies | 465 | CUM | 301 ₹1,39,965 | 180 ₹83,700 Lowest | 190 ₹88,350 |
| 10.00 | Dumping stone excluding cost of stones including all carraiges | 60 | CUM | 301 ₹18,060 | 200 ₹12,000 | 190 ₹11,400 Lowest |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
13 Jul 2026, 4:00 pmClosed
Executive Engineer, TLMD-VIII, JKPTCL Jammu
Executive Engineer, TLMD-VIII, JKPTCL Jammu
PROVIDING OF PROTECTION WORK TO THE TOWER FOUNDATION BY WAY OF CONSTRUCTION OF RCC PROTECTION WALLS AT TOWER LOCATION NO. 14,15 and ,30 OF 132kV BARN-CANAL TRANSMISSION LINE
2026_PDD_313342_1
TLMD-VIII/J/T/09of 2026-27 Dt 23/06/2026
Open Tender
Civil Works
Turn-key
180 days
BARN JAMMU
AS PER THE CONDITIONS OF NIT AND SBD
2 documents required · 2 mandatory
₹1,180
Executive Engineer, TLMD-VIII, JKPTCL Jammu
₹90,000
Executive Engineer, TLMD-VIII, JKPTCL Jammu
10 Aug 2026
23 Jun 2026
14 Jul 2026
24 Jun 2026
13 Jul 2026
24 Jun 2026
30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 1,950 | SQM | - | - |
| 2 | Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive. In yard and drains | 230 | CUM | - | - |
| 3 | Preparation of Structural design and drawings for RCC wall from structural engineer/consultant | 1 | JOB | - | - |
| 4 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: | 230 | CUM | - | - |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) including all carraiges and supplies | 28.5 | CUM | - | - |
| 6 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1.5:3 mix | 250 | CUM | - | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in \position and binding all complete above plinth level | 6,170 | KG | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 710 | SQM | - | - |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited
layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.including all carraiges and supplies | 465 | CUM | - | - |
| 10 | Dumping stone excluding cost of stones including all carraiges | 60 | CUM | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
SBD1430.pdf
Tender Documents • 0.34 MB
BOQ_1014112.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].