Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | H1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | -20.00% | ₹2.0 L | H1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | H2₹1.9 L−₹6,360.90 (3.19%)Admitted-Fee/PreQual/Technical/Finance | -22.55% | ₹1.9 L−₹6,360.90 (3.19%) | H2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | H3₹1.7 L−₹24,645.40 (12.3%)Admitted-Fee/PreQual/Technical/Finance | -29.88% | ₹1.7 L−₹24,645.40 (12.3%) | H3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | H4₹1.6 L−₹42,705.39 (21.4%)Admitted-Fee/PreQual/Technical/Finance | -37.12% | ₹1.6 L−₹42,705.39 (21.4%) | H4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | H5₹1.5 L−₹44,925.47 (22.5%)Admitted-Fee/PreQual/Technical/Finance | -38.01% | ₹1.5 L−₹44,925.47 (22.5%) | H5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 L
EMD Value
₹5,000
Closing Date
6 Jul 2026, 2:00 pmClosed
Executive Engineer
batamaloo
Strengthening of Embankment against erosion and overflow on Dachigam Nallah on critical spots from chandpor to Tailbal RD 4000M excluding cost of available crates
2026_IFC_313803_2
e-NIT 04 of 2026-27
Open Tender
Civil Works
Percentage
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer IFCD Srinagar
₹5,000
Yes
9 Jul 2026
27 Jun 2026
6 Jul 2026
27 Jun 2026
6 Jul 2026
27 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 43.87 | cum | 187.3 | ₹8,216.85 |
| 2 | Dumping stone excl. cost of stones in horizontal on level. | 39.45 | Cum | 237.9 | ₹9,385.16 |
| 3 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 58.75 | cum | 371.15 | ₹21,805.06 |
| 4 | Supply of stone boulders | 98.2 | Cum | 700 | ₹68,740 |
| 5 | Providing and laying cement concrete in kerbs, steps and the like at or near ground level including curing, excluding the cost of centring, shuttering, and finishing. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mmnominal size) | 15.44 | Cum | 6,591.25 | ₹1,01,768.9 |
| 6 | Centering & shuttering incl. strutting, propping etc. & removal of form work for:- Foundations, footings, bases for columns | 37.44 | sqm | 286.35 | ₹10,720.94 |
| 7 | CEMENT PLASTER (IN FINE SAND) 12mm Cement plaster of mix. 1 : 4 ( 1 cement : 4 fine sand) | 51.48 | sqm | 283.8 | ₹14,610.02 |
| 8.1 | Carriage of material by mechanical transport including loading unloading and stacking from source to road site. Stone soling avg. 15 km. | 4.77 | cum | 405.31 | ₹1,933.33 |
| 8.2 | 20mm aggregate avg. 25 km. | 13.89 | cum | 465.14 | ₹6,460.79 |
| 8.4 | Sand avg. 25 km. | 7.96 | cum | 465.14 | ₹3,702.51 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.84 MB
BOQ_1015787.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .