| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC | ₹3.5 L | L1 | Accepted-AOC LER |
| 2 | L2₹3.5 LRejected-Finance | ₹3.5 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | K Banudoss L1 | M Vetrivel L2 |
|---|---|---|---|---|---|
| 1.00Construction of Drainage @ Mela puthu theru in Alakudy panchayat. | |||||
| 2.00 | Earth work excavation in all class of Soil except hard rock requiring blasting with intial lead and lift etc. Complete for foundation as per SS 20B. | 52.61 | Cum | 263.05 ₹13,839.06 | 265 ₹13,941.65 |
| 3.00 | Supplying and filling with Good M.Sand including Cost and conveyance, labour charges etc, Complete., | 6.5 | Cum | 2,213.65 ₹14,388.73 | 2,215 ₹14,397.50 |
| 4.00 | C.C.1:4:8 Mix using 40mm HBG metal including cost & conveyance & Labour charges etc, Complete.,. | 6.36 | Cum | 5,988.65 ₹38,087.81 | 5,990 ₹38,096.40 |
| 5.00 | Supply and erection of Steel Centering and all labour Charges etc.complete | 146.16 | Sqm | 546.75 ₹79,912.98 | 549 ₹80,241.84 |
| 6.00 | C.C.1:3:6 Mix using 20mm HBG metal including cost & conveyance & Labour charges etc, Complete.,. | 15.32 | Cum | 6,739.65 ₹1.0 L | 6,741 ₹1.0 L |
| 7.00 | Plastering with cement mortar 1:5 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete | 23.85 | Sqm | 579.45 ₹13,819.88 | 581 ₹13,856.85 |
| 8.00 | Supply and filling the soak pit with 40mm metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 0.16 | Cum | 1,957.55 ₹313.21 | 1,959 ₹313.44 |
| 9.00 | Supply and filling the soak pit with 20mm metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 0.16 | Cum | 2,492.05 ₹398.73 | 2,494 ₹399.04 |
| 10.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. | 0.12 | Mt | 91,857.75 ₹11,206.65 | 91,860 ₹11,206.92 |
Tender Value
₹3.5 L
EMD Value
₹3,550
Closing Date
9 Jan 2026, 3:00 pmClosed
Block Development Officer (VP), Thanjavur
Block Development Office, Thanjavur
Thanjavur District - Thanjavur Block - Construction of Drainage at Mela puthu theru in Alakudy panchayat under VP GF 2025-2026
2026_RDTN_639497_1
Rc.No. 4828/2025/A3 Dated 31.12.2025
Open Tender
Civil Works - Others
90 days
Thanjavur
As per Tender bid document
2 documents required · 2 mandatory
₹0
₹3,550
11 Feb 2026
6 Jan 2026
9 Jan 2026
6 Jan 2026
9 Jan 2026
6 Jan 2026
Amount
Construction of Drainage @ Mela puthu theru in Alakudy panchayat.
Earth work excavation in all class of Soil except hard rock requiring blasting with intial lead and lift etc. Complete for foundation as per SS 20B.
Supplying and filling with Good M.Sand including Cost and conveyance, labour charges etc, Complete.,
C.C.1:4:8 Mix using 40mm HBG metal including cost & conveyance & Labour charges etc, Complete.,.
Supply and erection of Steel Centering and all labour Charges etc.complete
C.C.1:3:6 Mix using 20mm HBG metal including cost & conveyance & Labour charges etc, Complete.,.
Plastering with cement mortar 1:5 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Supply and filling the soak pit with 40mm metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supply and filling the soak pit with 20mm metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification.
Reinforced cement concrete 1:1.5:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M Vetrivel (BID ID -1558499)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_765580.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid