Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance HNO 365 STREET NO 12 TALAB TILLO JAMMU RISHI TRADING CO TALAB TILLO ROAD OPP FRIENDS LANE JAMMU JAMMU KASHMIR 180002 | JAMMU | JAMMU AND KASHMIR | 180002 | Admitted-Finance |
| 5 | Admitted-Finance I AZAD NAGAR BANSI BANSI SIDDHARTHNAGAR UTTAR PRADESH 272153 | SIDDHARTH NAGAR | UTTAR PRADESH | 272153 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹16,000
Closing Date
1 Apr 2024, 4:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Distribution Circle, Santkabirnagar
Work of increasing the capacity of new overloaded transformers and replacement of dilapidated ABC under the Business Plan Year 2024-25 Phase-2 under Electricity Distribution Division Mehdawal.
2024_PVVNV_916596_1
121/EDC(SKN)/2023-24
Open Tender
Electrical Works
Fixed-rate
90 days
Santkabirnagar
As Per Tender Specification
2 documents required · 2 mandatory
₹3,540
SE EDC Santkabirnagar
₹16,000
5 Apr 2024
13 Mar 2024
2 Apr 2024
13 Mar 2024
1 Apr 2024
13 Mar 2024
DECENTRALISED ITEM NAME (EXCLUDING GST)
CROSS ARM HOLDING CLAMP
F BRACKET
STAY CLAMP
STAY LOOP INSULATOR
MS NUT BOLT
CLAMP FOR CHANEL
CABLE 1*16 SQ MM
LUG 70 SQ. MM
LUG 240 SQ. MM
CLAMP FOR S/S BASE ANGLE
DEAD END
SUSPENSION CLAMP
PIERCING CONNECTOR
WORK DETAILS AND RATES(EXCLUDING GST)(उक्त कार्य के निष्पादन मे प्राक्कलन एवं इस सूची मे दर्ज सामग्री के अतिरिक्त यदि कोई अन्य टी एंड पी आइटम/ विकेंद्रीयकृत सामग्री की आवश्यकता पड़ती है तो कार्यदायी संस्था द्वारा उपलब्ध कराते हुये कार्य को ससमय पूर्ण करा लिया जायेगा एवं कोई अतिरिक्त धनराशि देय नहीं होगी )
Carriage of Conductor/Material From Store To Site
Carriage of 63 KVA Distrubution Transformer From Store To Site
Carriage of 100 KVA Distrubution Transformer From Store To Site
Mounting of 63 KVA Distribution Transformer at DP/ with Channel and Clamp
MAKING OF PLINTH AND FENCING(IRON GRILL)
CARRIGE OF 250 KVA TRANSFORMER FROM STORE TO SITE
Mounting of 100 KVA Distribution Transformer at DP/ with Channel and Clamp
Laying of New ABC(3X95+1X70+1X16) With all Accessories
Laying of New ABC(3X50+1X35+1X16) With all Accessories
RETURNING OF 25 KVA TRANSFORMER FROM SITETO STORE
RETURNING OF 100 KVA TRANSFORMER FROM SITETO STORE
ERRECTION OF 100 KVA TRANSFORMER
Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering
Erection of Sectional Double Pole Structure of ST pole including digging of pit, fitting of all accessories, back filling of earth, grouting of each pole & stay sets with materials & other required works.
Laying of 11 KV XLPE 3x70 SQ MM
Earthing of Poles
M/S JAISWAL BROTHERS
M/s King Associates
SRI SAI TRADING COMPANY
Rishi Trading Co.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .