Loading…
Loading…
Tender Value
₹24.6 L
EMD Value
₹49,300
Closing Date
13 Jul 2026, 5:00 pm4d left
MUKESH KUMAR
Executive officer nagar parishad naugachia
NAUGACHIA
MUKESH KUMAR
EXECUTIVE OFFICER, NAGAR PARISHAD, NAUGACHIA
Construction of Toe Wall from House of Shanti Devi via Pramod Jha House to Brajesj Yadav House AND from House of Umesh Rajak to Kumodi Yadav House AND from House of Gaurav Kumar to Bipin Yadav House AND from House of Kiran Kumari to Subhash Das House AND from House of Mahesh Jha to Murli Dhar Sah House in Ward No -- 27
135304
03/2026-2027/NAUGACHIA/GR 21
Open Tender
CIVIL
Bhagalpur
• VALID CLASS-IV REGISTRATION WITH RCD (As per NIT) (Attached or Not Attached)
• PAN CARD (As per NIT) (Attached or Not Attached)
• G.S.T. (As per NIT) (Attached or Not Attached)
• EARNEST MONEY (As per TENDER) (Attached or Not Attached)
• AFFIDAVIT (As per NIT) (Attached or Not Attached)
• VALID CHARACTER (As per NIT) (Attached or Not Attached)
• EXISTING COMMITMENT (As per NIT) (Attached or Not Attached)
• COST OF BOQ (As per TENDER) (Attached or Not Attached)
• BID PROCESSING FEE (As per TENDER) (Attached or Not Attached)
CIVIL
PERCENTAGE
L1
1
2 documents required · 2 mandatory
₹5,000
Processing Fee: 1180
₹49,300
Office Nagar Parishad, Naugachia
6 Jul 2026
6 Jul 2026
14 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
9 Jul 2026
NAGAR PARISHAD NAUGACHIA, BHAGALPUR (BIHAR)
Bill of Quantity for Construction of Toe Wall from House of Shanti Devi via Pramod Jha House to Brajesj Yadav House AND from House of Umesh Rajak to Kumodi Yadav House AND from House of Gaurav Kumar to Bipin Yadav House AND from House of Kiran Kumari to Subhash Das House AND from House of Mahesh Jha to Murli Dhar Sah House in Ward No -- 27
Estimated cost:- Rs. 2,462,144
Earnest money:- Rs. 49,300.00
Time of Completion:- 03 Months
Cost of BOQ:- Rs. 5,000.00
S.NO. ITEM OF WORKS UNIT QTY. RATE (in fig.) Amount
1. BCD 2.8 Earth work in excavation in foundation trenches or drains(not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m . including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All Kinds of soil M³ 20.76 360.70 Rs. 7,488
2. BCD 2.28 Supplying and Filling in plinth with local sand and under floors including, watering, ramming consolidating and dressing complete. M³ 150.567 287.30 Rs. 43,258
3. BCD 11.72 Providing designation 100 A one brick on flat soling joints filled with local sand including cost of watering, taxes, royalty all complete as per building specification and direction of E/l, M² 136.253 283.30 Rs. 38,600
4. BCD 4.1.3 Providing and laying in position cement concrete of specified grade exluding the cost of centring and shuttering-all work upto plinth level.1:2:4(1 Cement: 2 coarse sand:4 graded stone aggregate 20 mm nominal size) all Complete job as per direction of E/I. M³ 10.38 3998.10 Rs. 41,500
5. BCD 6.1.12/1 Brick work with bricks of class designation 100A in foundations and plinth in : Cement mortar 1.:4 (1 cement: 4 coarse sand ) M³ 137.772 5017.90 Rs. 691,326
6. BCD 5.1.2 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-All work puto plinth level 1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size) M³ 65.718 4688.30 Rs. 308,106
7. BCD 5.22. Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
7.(i) BCD 5.22.7B Thermo Mechanically Treated bars TMTC-500-10 mm dia. KG 3943.10 92.60 Rs. 365,131
7.(ii) BCD 5.22.7C Thermo Mechanically Treated bars TMTC-500-12 mm dia. KG 2628.73 90.80 Rs. 238,689
8. BCD 4.3.1 Centring and shuttering including strutting,propping etc. and removal or form work for Foundations,footings, bases Columns M² 681.297 211.10 Rs. 143,822
9. RCD 3.11 Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.) M³ 18.684 122.09 Rs. 2,281
10 Carriage of Materials
(i) Coarse sand- 65 KM(P)+ 1KM(K) M³ 69.732 1586.55 Rs. 110,633
(ii) Stone Chips-95 KM(P) + 1KM (US) M³ 65.10 2194.23 Rs. 142,842
(iii) Bricks-7KM (P)+ 1KM(K) %/Nos. 72455 940.97 Rs. 68,178
(iv) Local Sand-2KM (P)+1KM (K) M³ 152.611 310.42 Rs. 47,374
11 Difference cost of Material with G.S.T.
(ii) Bricks %/Nos. 72455 365.61 Rs. 26,490
12 Add seignorate fee
(i) Coarse sand M³ 69.73 17.58 Rs. 1,226
(ii) Stone Chips M³ 65.10 59.54 Rs. 3,876
(iii) Bricks %/Nos. 72455 512.80 Rs. 37,155
(iv) Local Sand M³ 152.61 14.19 Rs. 2,166
Total Rs. 2,330,887
13. L.S. Add for sign.board,scheme name plate,Quality test & Colour photo graph (Payment after providing actual voucher) Set 1 6000.00 Rs. 6,000
Total Rs. 2,336,887
14 18 % GST IN PLACE OF 12 % GST (MULTIPLYING FACTOR = 1.0536) Rs. 2,462,144
G.Total Rs. 2,462,144
Executive Officer
Nagar Parishad Naugachia
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT 03.pdf
NIT • 4.73 MB
Corrigendum 01.pdf
NIT • 0.31 MB
Corrigendum 02.pdf
NIT • 0.43 MB
B.O.Q Final_Gr-21.xlsx
NIT • 0.01 MB
Download all tender documents and submit your bid