Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55,000Accepted-Finance 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | L1 | Accepted-Finance L1 | |
| 2 | L2₹58,000+₹3,000 (5.45%)Rejected-Finance BHAGWATI NAGAR JAMMU | L2 | Rejected-Finance L2 | |
| 3 | L3₹60,000+₹5,000 (9.09%)Rejected-Finance BHAGWATI NAGAR JAMMU | L3 | Rejected-Finance L3 |
Tender Value
₹56,500
Closing Date
17 Aug 2021, 2:00 pmClosed
office of xen jal shakti phe mech div north jmu
office of xen jal shakti phe mech div north jmu
Repair/replacement of components of 150KVA, 3- phase manually operated voltage stabilizer of Tube well no.21 and 10.
2021_PHE_133750_1
e nit no. 115 of 2021-22
Open Tender
Repair and Maintenance Works
Item Rate
5 days
jewel chowk jammu
Please refer Tender documents.
10 documents required · 10 mandatory
₹200
office of xen jal shakti phe mech div north jmu
Exempted
27 Aug 2021
9 Aug 2021
18 Aug 2021
9 Aug 2021
17 Aug 2021
9 Aug 2021
Amount
Repair/replacement of components of 150 KVA 3 phase manually operated voltage stabilizer installed at Tube well no. 21 The job includes disconnecting of incoming and outgoing power cables. Dismantling of the stabilizer by lifting of transformer assembly from the oil tank with the help of chain pulley block and manual labour. Replacement of 2nos. rotary switches and repairing-1no. Job also involves replacing voltmeter-1no., Amperemeter-1no. repair/replacement of internal control wring and repair to coils. Assembling the voltage stabilizer. Topping up the oil level by adding 118ltrs. of fresh T-oil. Making of power connections after proper thimbling of the electrical cables. Testing the voltage stabilizer on full load. Complete job including cost of materal, tools & tackles, labour charges and taxes.
Repair to 150 KVA 3 phase manually operated voltage stabilizer installed at Tube well no. 10. The job includes disconnecting of incoming and outgoing power cables. Dismantling of the stabilizer by lifting of transformer assembly from the oil tank with the help of chain pulley block and manual labour. Repairing of 3nos. rotary switch. Job also includes repairs to internal control wring and connection of coils. Assembling the voltage stabilizer. Topping up the oil level by adding 130 ltrs. of fresh T-oil. Making of power connections after proper thimbling of the electrical cables. Testing the voltage stabilizer on full load. Complete job including cost of material, tools & tackles, labour charges and taxes.
M/S FASTTRACK ENGINEERS
PERFECT ELECTRICAL WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .