Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹24.8 Laccepted-aoc | ₹24.8 L | accepted-aoc |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
23 Jan 2026, 11:00 pmClosed
Bengaluru North City Corporation
Removal of silt & Other maintenance of roads and drains in new ward no. 07 Thanisandra
257822
BNCC/2025-26/OW/WORK_INDENT98
Open
Other Works
BNCC Byatarayanapura Division
5 documents required · 5 mandatory
₹660
₹60,000
23 Jan 2026
16 Jan 2026
20 Jan 2026
Removal of silt & Other maintenance of roads and drains in new ward no. 07 Thanisandra
Providing causal labours unskilled mazdoor heavy
Providing Hydraulic Excavator of 1.2 m3 bucket on Hire basis including Operator and Fuel
Hire Charges of Tractor-Tralley 40 HP including Operator and Fuel
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per ...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Cod...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height....
Steel Fabrication,Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/...
Providing and laying 100mm thick pre-cast cover slabs over Road side drains / utility ducts / Rain water harvesting pit of width not exceeding 1000 mm using M20 concrete reinforced with TMT bars Fe 55...
Providing and fixing 230mm thick pre cast reinforced concrete slab as per design and drawing material cost,transportation, hire charges of machinery complete with all lead and lift conveyance charges...
Unload ing, Loading & Carriage of MaterialsLoading and Unloading of Stone Boulder/Stone aggregates/Sand/Kankar/Moorum. Tipper 5.5 m3
Cost of Haulage Excluding Loading and Unloading,Taking output 10 t load and lead 10 km = 100 t.km
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW2.doc
Tender Document • 0.21 MB
Notification 3.docx
Tender Document • 0.23 MB
Corregendam 1.pdf
Tender Document • 2.40 MB
Download all tender documents and submit your bid