Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.4 LAdmitted-Finance | -1.01% | ₹32.4 L | L1 | Admitted-Finance |
| 2 | L2₹32.6 L+₹23,249.77 (0.72%)Admitted-Finance | -0.30% | ₹32.6 L+₹23,249.77 (0.72%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical according to technial bid |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical according to technial bid |
Tender Value
₹32.7 L
EMD Value
₹3.3 L
Closing Date
30 Jun 2026, 5:00 pmClosed
EXECUTIVE ENGINEER MINOR IRRIGATION DIVISION AGRA
OFFICE OF EE MI AGRA BAROLI AHEER AGRA
JANPAD AGRA KI TAHSEAL KHAIRAGARH KE BLOCK JAGNER KE GRAM BHARA MAIN VISHUNDHARI NALE/ NADI PAR CHEKDAM CUM RAPTA KA NIRMAN
2026_UPMID_1153724_1
TENDER NO-4 CHECKDAM BHARA
Open Tender
Civil Works - Others
Percentage
90 days
KHAIRAGARH
AS PER TENDER NOTICE
2 documents required · 2 mandatory
₹854
EXECUTIVE ENGINEER MINOR IRRIGATION DIVISION AGRA
₹3.3 L
Yes
OFFICE OF EE MI AGRA
10 Aug 2026
30 May 2026
1 Jul 2026
30 May 2026
30 Jun 2026
30 May 2026
30 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | EARTH WORK IN EXCAVATION IN CHECKDAM CUM RAPTA SITE AT MAR KABAR RANKAR AND KANKAR MIX SOIL & EXTRA FOR HARD SOIL MIXED WITH KANKAR MOORUM OR DISINTIGRATED ROCK | - | - | - | - |
| 2 | 0.00 m UP TO 4.50 M DEPTH AND LEAD UP TO 200 M. | 1,164.72 | Cum | 105 | ₹1,22,295.6 |
| 3 | Removal of Coffer Dam | 210 | Cum | 105 | ₹22,050 |
| 4 | PAKKA WORK | - | - | - | - |
| 5 | PLAIN CEMENT CONCRERE IN 1:3:6 WITH 40 MM STONE BALLAST COURSE SAND AND CEMENT | 140.87 | Cum | 6,203.03 | ₹8,73,820.84 |
| 6 | COURSED RUBBLE/ KHANDA MASONARY IN SUPER STRUCTURE WITH 1:4 CEMENT COURSE SAND MORTAR WITH 20 TO 40 K.G.WEIGHT KHANDA | 225.88 | Cum | 5,902.32 | ₹13,33,216.04 |
| 7 | RENDUM RUBBLE/ KHANDA MASONARY WITH 1:4 CEMENT COURSE SAND MORTAR UP TO SUB STRUCTURE/BED LEVEL WITH 20 TO 40 K.G. WEIGHT KHANDA | 70.87 | Cum | 5,578.56 | ₹3,95,352.55 |
| 8 | CEMENT CONCRETE IN 1:2:4 WITH 20 MM HARD STONE GRITT COURSE SAND AND CEMENT INCLUDING SUPPLY OF ALL MATERIAL LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF WORK | 50.95 | Cum | 6,720.68 | ₹3,42,418.65 |
| 9 | 15 MM THICK PLASTER IN 1:3 CEMENT AND COURSE SAND MORTAR ON SURFACE OF UP STREAM SIDE CREST WALL,WING WALL,AND EXTENSION WALL | 58.64 | Sqm | 398.74 | ₹23,382.11 |
| 10 | FLUSH /RAISED ,POINTING IN 1:2 CEMENT AND SAND MORTAR ON SURFACE OF CREST WALL ,WING WALL,EXTENSION WALL OF DOWN STREAM SIDE AND ON FULL SURFACE OF SLOPPY PORTION OF BOTH BANK INCLUDING SUPPLY OF ALL MATERIAL LABOUR AND T&P REQUIRE FOR PROPER COMLETION OF WORK. | 161.95 | Sqm | 292.93 | ₹47,440.01 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.23 MB
BOQ_2161283.xls
BOQ • 0.28 MB
bw_date.pdf
PDF • 0.24 MB
412.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .