| 1 | L-1₹1765.3 CrAccepted-AOC CIGNUS 14TH 15TH FLOOR PLOT NO 71A KAILASH NAGAR MAYUR NAGAR PASSPOLI POWAI MUMBAI MAHARASHTRA INDIA | MUMBAI | MUMBAI | MAHARASHTRA | 400087 | ₹1765.3 Cr | L-1 | Accepted-AOC L-1 bidder |
| 2 | L-2₹1918.5 CrRejected-Finance S 2 TECHNOCRAT INDUSTRIAL ESTATE BALANAGAR HYDERABAD 500 037 TELANGANA INDIA | HYDERABAD | HYDERABAD | TELANGANA | 500037 | ₹1918.5 Cr | L-2 | Rejected-Finance Not L-1 |
| 3 | L-3₹1935 CrRejected-Finance CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | ₹1935 Cr | L-3 | Rejected-Finance Not L-1 |
| Sl No | Description | Qty | Unit | MEGHA ENGINEERING AND INFRASTRUCTURES LIMITED L2 | Tata Projects Limited L1 | Larsen & Toubro L3 |
|---|---|---|---|---|---|---|
| 1.00SCHEDULE-A1 DESIGN AND ENGINEERING:-NATURAL DRAUGHT COOLING TOWERS (NDCTs), CWPH, PIPING, EQUIPMENT AND MISCELLANEOUS OUTDOOR STRUCTURES/SERVICES: Complete conceptulization, preparation of overall layout; Design & Engineering related to Thermal, Mechanical, Civil & Architectural, Electrical, Control & Instrumentation; engineering and preparation of detailed and general arrangment drawings for four (4) number of Natural Draught Cooling Towers (including internal and external structures), Cooling Water Pump House, CMLC Pipeline, Equipment, and miscellaneous outdoor structures & services as per scope of works and technical specifications(Section-V). Preparation and approval of Design Basis Reports, Design Reports, Design calculations & Analysis, final G.A. Drawings, Detailed Drawings, Fabrication drawings, Good for construction Drawings (GFC) etc complete as covered under the scope of work, technical specifications, as per Note: Designing, detailing and Integration of all structures, systems, components, equipments required for overall completion of systems for successful operation and maintenance of NDCT-1A, 1B, 2A & 2B, CMLC & other pipelines are included in the scope of this item. | ||||||
| 1.01 | SCHEDULE A1.1
For works covered under Civil scope | 1 | Lumpsum | 22,54,62,735 ₹22,54,62,735 Lowest | 26,17,21,863 ₹26,17,21,863 | 38,85,17,004 ₹38,85,17,004 |
| 1.02 | SCHEDULE A1.2
For works covered under Mechanical scope | 1 | Lumpsum | 13,30,59,975 ₹13,30,59,975 | 3,73,88,838 ₹3,73,88,838 Lowest | 12,84,96,602 ₹12,84,96,602 |
| 1.03 | SCHEDULE A1.3
For works covered under Electrical scope | 1 | Lumpsum | 73,92,221 ₹73,92,221 Lowest | 6,43,08,801 ₹6,43,08,801 | 1,39,00,804 ₹1,39,00,804 |
| 1.04 | SCHEDULE A1.4
For works covered under Control and Instrumentation scope | 1 | Lumpsum | 36,96,110 ₹36,96,110 Lowest | 2,54,24,410 ₹2,54,24,410 | 90,60,995 ₹90,60,995 |
| 2.00SCHEDULE-A2: CIVIL WORKS NATURAL DRAUGHT COOLING TOWERS (NDCTs): CIVIL WORKS FOR FOUR (4) NUMBER OF NDCTs- Construction of all civil structures and services required for intended functioning, operation & maintenance of NDCT as per scope of work, specifications and drawings i.e. NDCT shell, racker columns, foundation, internal structures & its foundations, cold water tunnels upto terminal limits, pedestals, walkways, handrails, staircase etc as specified in the scope of works, tender drawings and technical specifications. Notes: 1. Quoted rate under this schedule shall EXCLUDE the structures to be executed on item rate basis as per specifications, tender drawings. However, dewatering for construction of structures under item rate is covered under this schedule. (Reference: table at Dwg. No "GHAVP-1&2/71200/2001/GA) 2. Backfilling/ filcrete shall be covered as per Schedule - B. 3. Ground Improvement: GI shall be carried out as per Schedule-B. | ||||||
| 2.01 | SCHEDULE A2.1-1: NDCT FOUNDATION WORKS:
Excavation, dewatering, Concrete works upto top of Pedestal including tie beam (below racker columns) for four number of NDCTs.
Notes:
1. Dewatering for structures covered under item rate works (Refer, Schedule-B and table at Dwg. No "GHAVP-1&2/71200/2001/GA) shall be deemed to be covered under this schedule.
2. Excavation: For structures which are covered under item rate works, in case excavation is overlapping with excavation for structures under Lumpsum works, same shall be deemed to be covered under this schedule.
3. Excavation and dewatering for CMLC pipelines adjacent to NDCTs shall be deemed to be included under this schedule.
4. Connection from NDCT sludge pits upto Plant drain Chamber (PDC) are within the scope of this schedule. | 1 | Lumpsum | 2,52,00,75,284 ₹2,52,00,75,284 Lowest | 3,06,80,80,203 ₹3,06,80,80,203 | 2,53,54,98,127.1 ₹2,53,54,98,127.1 |
| 2.02 | SCHEDULE A2.1-2: NDCT SHELL STRUCTURE WORKS: Civil Works above pedestal/tie beam upto top of Shell for four numbers of NDCTs | 1 | Lumpsum | 3,86,41,15,435 ₹3,86,41,15,435 | 2,78,27,38,975 ₹2,78,27,38,975 Lowest | 3,69,29,32,384 ₹3,69,29,32,384 |
| 2.03 | SCHEDULE A2.1-3: NDCT INTERNAL
Civil Works for four numbers (04) of NDCTs Internal, external & Auxiliary Structures as per scope of work, technical specifications, drawings: Major structures/ members covered are provided below for ready reference however, for detailed scope, technical specifications and drawings shall be referred: Internal framed structures (columns, beams, bracings) and their foundations; NDCT basin; NDCT cold water tunnel outlets upto terminal limits indicated in drawings (however, mechanical systems including gates, cranes are covered under Schedule-A3) RCC external staircase upto hot water distribution area with landing walkways and handrails; Hot water Ducts-HWD-1,2,3&4; NDCT sludge pits and its connections to PDCs; RCC Shaft -hot water riser ; Thrust block; Precast beams; Wind wall-concrete block wall; Handrail along duct and peripheral walkway along hot distribution area; peripheral walkway near ring beam;
Cage ladder from RCC staircase landing area to the tower shell top; Corrosion resistant paint on basin slab, basin walls, partition wall, duct, internal structures columns, beams, bracings, rcc shaft, wind walls, precast beams etc.; Surface Drains designed by Contractor including its allied works. | 1 | Lumpsum | 2,68,80,80,303 ₹2,68,80,80,303 | 1,68,93,47,734 ₹1,68,93,47,734 Lowest | 2,62,26,50,916 ₹2,62,26,50,916 |
| 2.04 | SCHEDULE A2.2: COOLING WATER AND AUXILIARY SERVICE WATER PUMP HOUSE (CWPH)
Civil works for foundation, superstructures including excavation, dewatering, concrete works and services required for intended functioning, operation & maintenance of CWPH and ASW as per scope of works, technical specifications and tender drawings are within the scope of this item.
Note - 1: Quoted rate includes construction of CWPH tunnels/trenches upto terminal limits provided in tender Dwg., other structures required for installation, inspection, monitoring, operation, maintenance of all system/components etc except those specified in relevant items of other schedules.
Note - 2: However, part of Excavation, excavation for which are overlapping with excavation area of LUMPSUM WORKS shall be deemed to be covered under ScheduleA2.1-1.
Note - 3: Include Connection from CWPH sludge pits to PDC are within the scope of this item.
Note - 4: Excavation and dewatering for CMLC pipelines adjacent to CWPH (i.e which are not covered under Schedule A2.1.1) shall be deemed to be included under this item. | 1 | Lumpsum | 77,28,23,087 ₹77,28,23,087 Lowest | 79,14,62,023 ₹79,14,62,023 | 77,97,58,868 ₹77,97,58,868 |
Tender Value
₹1897.5 Cr
EMD Value
₹3 Cr
Closing Date
30 Jun 2025, 5:00 pmClosed
Project Director
GHAVP Site
Design, Engineering, Construction, Supply, Erection, Commissioning and Testing of four number of Natural Draught Cooling Towers, Cooling Water Pump House and associated works for GHAVP Unit 1 and 2 at Vill Gorakhpur, Distt Fatehabad, Haryana.
2024_NPCIL_210428_1
NPCIL/GHAVP/CTC/2024/PT-239
Open Tender
Civil Works
Item Rate
1640 days
GHAVP Site
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹3 Cr
GHAVP Site
3 Apr 2026
9 Oct 2024
2 Jul 2025
9 Oct 2024
30 Jun 2025
5 Dec 2024
9 Oct 2024 - 13 Nov 2024
14 Nov 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCHEDULE-A1 DESIGN AND ENGINEERING:-NATURAL DRAUGHT COOLING TOWERS (NDCTs), CWPH, PIPING, EQUIPMENT AND MISCELLANEOUS OUTDOOR STRUCTURES/SERVICES: Complete conceptulization, preparation of overall layout; Design & Engineering related to Thermal, Mechanical, Civil & Architectural, Electrical, Control & Instrumentation; engineering and preparation of detailed and general arrangment drawings for four (4) number of Natural Draught Cooling Towers (including internal and external structures), Cooling Water Pump House, CMLC Pipeline, Equipment, and miscellaneous outdoor structures & services as per scope of works and technical specifications(Section-V). Preparation and approval of Design Basis Reports, Design Reports, Design calculations & Analysis, final G.A. Drawings, Detailed Drawings, Fabrication drawings, Good for construction Drawings (GFC) etc complete as covered under the scope of work, technical specifications, as per Note: Designing, detailing and Integration of all structures, systems, components, equipments required for overall completion of systems for successful operation and maintenance of NDCT-1A, 1B, 2A & 2B, CMLC & other pipelines are included in the scope of this item. | |||||
| 1.01 | SCHEDULE A1.1
For works covered under Civil scope | - | Lumpsum | - | - |
| 1.02 | SCHEDULE A1.2
For works covered under Mechanical scope | - | Lumpsum | - | - |
| 1.03 | SCHEDULE A1.3
For works covered under Electrical scope | - | Lumpsum | - | - |
| 1.04 | SCHEDULE A1.4
For works covered under Control and Instrumentation scope | - | Lumpsum | - | - |
| 2SCHEDULE-A2: CIVIL WORKS NATURAL DRAUGHT COOLING TOWERS (NDCTs): CIVIL WORKS FOR FOUR (4) NUMBER OF NDCTs- Construction of all civil structures and services required for intended functioning, operation & maintenance of NDCT as per scope of work, specifications and drawings i.e. NDCT shell, racker columns, foundation, internal structures & its foundations, cold water tunnels upto terminal limits, pedestals, walkways, handrails, staircase etc as specified in the scope of works, tender drawings and technical specifications. Notes: 1. Quoted rate under this schedule shall EXCLUDE the structures to be executed on item rate basis as per specifications, tender drawings. However, dewatering for construction of structures under item rate is covered under this schedule. (Reference: table at Dwg. No "GHAVP-1&2/71200/2001/GA) 2. Backfilling/ filcrete shall be covered as per Schedule - B. 3. Ground Improvement: GI shall be carried out as per Schedule-B. | |||||
| 2.01 | SCHEDULE A2.1-1: NDCT FOUNDATION WORKS:
Excavation, dewatering, Concrete works upto top of Pedestal including tie beam (below racker columns) for four number of NDCTs.
Notes:
1. Dewatering for structures covered under item rate works (Refer, Schedule-B and table at Dwg. No "GHAVP-1&2/71200/2001/GA) shall be deemed to be covered under this schedule.
2. Excavation: For structures which are covered under item rate works, in case excavation is overlapping with excavation for structures under Lumpsum works, same shall be deemed to be covered under this schedule.
3. Excavation and dewatering for CMLC pipelines adjacent to NDCTs shall be deemed to be included under this schedule.
4. Connection from NDCT sludge pits upto Plant drain Chamber (PDC) are within the scope of this schedule. | - | Lumpsum | - | - |
| 2.02 | SCHEDULE A2.1-2: NDCT SHELL STRUCTURE WORKS: Civil Works above pedestal/tie beam upto top of Shell for four numbers of NDCTs | - | Lumpsum | - | - |
| 2.03 | SCHEDULE A2.1-3: NDCT INTERNAL
Civil Works for four numbers (04) of NDCTs Internal, external & Auxiliary Structures as per scope of work, technical specifications, drawings: Major structures/ members covered are provided below for ready reference however, for detailed scope, technical specifications and drawings shall be referred: Internal framed structures (columns, beams, bracings) and their foundations; NDCT basin; NDCT cold water tunnel outlets upto terminal limits indicated in drawings (however, mechanical systems including gates, cranes are covered under Schedule-A3) RCC external staircase upto hot water distribution area with landing walkways and handrails; Hot water Ducts-HWD-1,2,3&4; NDCT sludge pits and its connections to PDCs; RCC Shaft -hot water riser ; Thrust block; Precast beams; Wind wall-concrete block wall; Handrail along duct and peripheral walkway along hot distribution area; peripheral walkway near ring beam;
Cage ladder from RCC staircase landing area to the tower shell top; Corrosion resistant paint on basin slab, basin walls, partition wall, duct, internal structures columns, beams, bracings, rcc shaft, wind walls, precast beams etc.; Surface Drains designed by Contractor including its allied works. | - | Lumpsum | - | - |
| 2.04 | SCHEDULE A2.2: COOLING WATER AND AUXILIARY SERVICE WATER PUMP HOUSE (CWPH)
Civil works for foundation, superstructures including excavation, dewatering, concrete works and services required for intended functioning, operation & maintenance of CWPH and ASW as per scope of works, technical specifications and tender drawings are within the scope of this item.
Note - 1: Quoted rate includes construction of CWPH tunnels/trenches upto terminal limits provided in tender Dwg., other structures required for installation, inspection, monitoring, operation, maintenance of all system/components etc except those specified in relevant items of other schedules.
Note - 2: However, part of Excavation, excavation for which are overlapping with excavation area of LUMPSUM WORKS shall be deemed to be covered under ScheduleA2.1-1.
Note - 3: Include Connection from CWPH sludge pits to PDC are within the scope of this item.
Note - 4: Excavation and dewatering for CMLC pipelines adjacent to CWPH (i.e which are not covered under Schedule A2.1.1) shall be deemed to be included under this item. | - | Lumpsum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.30 MB
Section8.pdf
Tender Documents • 0.54 MB
Section1.pdf
Tender Documents • 2.28 MB
Section7.pdf
Tender Documents • 0.46 MB
Section6Part4.pdf
Tender Documents • 21.64 MB
Section6Part3.pdf
Tender Documents • 27.60 MB
Section5Part3.pdf
Tender Documents • 27.79 MB
Section5Part2.pdf
Tender Documents • 22.94 MB
Section6Part2.pdf
Tender Documents • 30.98 MB
Section6Part1.pdf
Tender Documents • 38.12 MB
Section5Part1.pdf
Tender Documents • 31.71 MB
Section4.pdf
Tender Documents • 5.59 MB
Section3.pdf
Tender Documents • 26.68 MB
Section2.pdf
Tender Documents • 0.26 MB
Technical_Bid_PT-239.XLS
Other Document • 0.22 MB
BOQ_230348.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .