| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.7 LAdmitted-Fee/PreQual/Technical/Finance | -8.00% | ₹19.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹20.1 L+₹42,796.21 (2.17%)Admitted-Fee/PreQual/Technical/Finance | -6.00% | ₹20.1 L+₹42,796.21 (2.17%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹20.6 L+₹93,081.75 (4.73%)Admitted-Fee/PreQual/Technical/Finance | -3.65% | ₹20.6 L+₹93,081.75 (4.73%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹25.3 L
EMD Value
₹50,500
Closing Date
12 May 2026, 4:00 pmClosed
Ex. Engineer PMGSY Budgam
Office of Ex. Engineer PMGSY Budgam Near SDH Chadoora
Permanent Restoration of roads of PMGSY Sub Division Budgam A)T02 Dharmuna to Radbugh,Package No Jk02112, T04 NS Pora to Dharmuna via Soibugh,Package No Jk023012
2026_KSRRD_147478_1
ENIT No.02/EE/PMGSY/B/E-TENDERING OF 2026-27 Dated 05-05-2026
Open Tender
Civil - Roads and Bridges
Percentage
120 days
Budgam
As per NIT
7 documents required · 7 mandatory
₹1,100
Ex. Engineer PMGSY Budgam
₹50,500
19 May 2026
5 May 2026
13 May 2026
5 May 2026
12 May 2026
5 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A)T02-Dharmuna to Radbugh, Package No.JK02-112 | |||||
| 1.01 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge (JKSOR 16.83) | 3.19 | cum | 2,255.54 | ₹7,195.17 |
| 1.02 | Providing and applying tack coat using hot straight run bitumen of grade – VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On W.B.M. @ 0.75 Kg/sqm. ( JKSOR 16.38) | 340 | Sqm | 65.19 | ₹22,164.6 |
| 1.03 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge.50 to 100 mm average compacted thickness with bitumen of grade VG-10 @ 3.5% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 100-120 TPH capacity. (JKSOR 16.63) | 17 | cum | 8,176.91 | ₹1,39,007.47 |
| 1.04 | Providing and laying 25mm thick semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge.25 mm compacted thickness with bitumen of grade VG 10 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity. (JKSOR 16.64) | 340 | Sqm | 273.66 | ₹93,044.4 |
| 1.05 | Providing and laying seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all complete. | 340 | Sqm | 93.01 | ₹31,623.4 |
| 1.06 | PCC Drain | - | - | - | - |
| 1.07 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil ( JKSOR 2.90 ) | 14.18 | cum | 225.2 | ₹3,193.34 |
| 1.08 | P/L of stone soling (PMGSY 9.20B) | 15.75 | cum | 1,600.56 | ₹25,208.82 |
| 1.09 | Providing and laying in position specified grade of cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level Nominal Mix M10 1:3:6 (1 cement : 3 coarse sand : 6) | 15.75 | cum | 5,548.46 | ₹87,388.25 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.40 MB
BOQ_230035.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .