Loading…
Loading…
Tender Value
₹73,861
Closing Date
10 Sept 2026, 4:00 pmDue tomorrow
Executive Engineer
Sathupally
Construction of Pipe Culvert on Field Channels Crossing Point of Chowdavaram Pedhacheruvu of Chowdavaram (V) , Vemsoor (M), Khammam Dist (3rd Call).
730531
N I T. No:09/2026-27, Dated:23.07.2026.
OPEN
Civil Engineering Works
KHAMMAM, TELANGANA
8 documents required · 7 mandatory · 1 optional
₹27
3 Sept 2026
3 Sept 2026
3 Sept 2026
Excavation for Structures- Mechanical Means ( Data adopted from MORTH)Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. ( depth upto 3 meters)
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Manufacture,Supply and delivery of 450 mm dia socket and spigot NP2 pipes including cost and conveyance of all materials and labour charges etc, complete.
Laying and jointing 600 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery,labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 24.8 kg / joint, FA : 0.025cum/joint, Hemp Yarn : 0.22kg/joint)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT 09 Construction of Pipe Culvert BID.docx
TENDER_DOCUMENT • 0.28 MB
NIT09 Construction of Pipe Culvert BOQ.xlsx
TENDER_DOCUMENT • 0.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .