Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹4.5 L (2.80%)Admitted-Finance | ₹1.7 Cr+₹4.5 L (2.80%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s B.K. Mozika L1 | Socristo Enterprise L2 |
|---|---|---|---|---|---|
| 1.01 | Hiring of 01 No Excavator cum Loader with Back Hoe capacity 0.24 cum and loader capacity 1.00 cum for construction of ANINI-MIPI & ANINI - DEMBUEN road under AOR of 62RCC/752 BRTF Project Udayak all as specified and directed by Engineer-In-Charge/OC Contract. | 800 | Hrs | - | - |
| 1.02 | Hiring of 01 No Stone Crusher 20 TPH with Diesel Gen. set of matching capacity for construction ofANINI-MIPI & ANINI - DEMBUEN road under AOR of 62 RCC/752 BRTF Project Udayak all as specified and directed by Engineer-In-Charge/OC Contract. | 900 | Hrs | - | - |
| 1.03 | Hiring of 01 No HMP 20 TPH with Diesel Gen. set of matching capacity for construction of ANINI-MIPI & ANINI - DEMBUEN road under AOR of 62 RCC/752 BRTF Project Udayak all as specified and directed by Engineer-In-Charge/OC Contract. | 500 | Hrs | - | - |
Tender Value
₹1.1 Cr
EMD Value
₹1.8 L
Closing Date
22 Jun 2020, 11:00 amClosed
The Chief Engineer Project Udayak
HQ CE (P) Udayak C/O 99 APO, PIN-931715
HIRING OF 01 NO EXCAVATOR CUM LOADER, 1 NO STONE CRUSHER AND 01 NO HMP FOR RESURF WKS, MAINT AND OTHER WKS ON ANINI-MIPI AND ANINI - DEMBUEN ROAD UNDER 62 RCC AND 752 BRTF (P) UDK IN AP STATE
2020_BRO_562107_1
TENDER No CE (P) UDAYAK-09 of 2020-21
Open Tender
Civil Works
Item Rate
270 days
Road Anini - Mipi
As per tender documents
5 documents required · 5 mandatory
₹0
₹1.8 L
Yes
HQ CE (P) Udayak
7 Jul 2020
1 Jun 2020
23 Jun 2020
2 Jun 2020
22 Jun 2020
12 Jun 2020
3 Jun 2020 - 10 Jun 2020
11 Jun 2020
Amount
Hiring of 01 No Excavator cum Loader with Back Hoe capacity 0.24 cum and loader capacity 1.00 cum for construction of ANINI-MIPI & ANINI - DEMBUEN road under AOR of 62RCC/752 BRTF Project Udayak all as specified and directed by Engineer-In-Charge/OC Contract.
Hiring of 01 No Stone Crusher 20 TPH with Diesel Gen. set of matching capacity for construction ofANINI-MIPI & ANINI - DEMBUEN road under AOR of 62 RCC/752 BRTF Project Udayak all as specified and directed by Engineer-In-Charge/OC Contract.
Hiring of 01 No HMP 20 TPH with Diesel Gen. set of matching capacity for construction of ANINI-MIPI & ANINI - DEMBUEN road under AOR of 62 RCC/752 BRTF Project Udayak all as specified and directed by Engineer-In-Charge/OC Contract.
Socristo Enterprise
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.15 MB
Tendernotice_2.pdf
PDF • 0.49 MB
TD80033.pdf
Tender Documents • 0.38 MB
BOQ_589885.xls
BOQ • 0.23 MB
ip80033.PDF
Additional Documents • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .