Loading…
Loading…
Tender Value
₹12.5 L
EMD Value
₹1.3 L
Closing Date
24 Sept 2026, 12:00 pm2d left
EE CD2 PWD Lucknow
EE CD2 PWD Lucknow
Patch Repair Work of different ODR Roads Under Jurisdiction of Assistant Engineer (II)
2026_CEUCZ_1186951_8
4074/E-Tender/2026-27 Dated 11-09-2026
Open Tender
Civil Works - Roads
Percentage
60 days
LUCKNOW
Please refer Tender documents.
2 documents required · 2 mandatory
₹856
₹1.3 L
EE CD2 PWD Lucknow
17 Sept 2026
17 Sept 2026
24 Sept 2026
17 Sept 2026
24 Sept 2026
17 Sept 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.. (Excluding GST) | 30 | Cum | 4,450 | ₹1,33,500 |
| 2 | Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mannual means. (Including Cost of Emulsion, Machinary & Labour) (Excluding GST) | 400 | Sqm | 55 | ₹22,000 |
| 3 | Filling Pot-holes and Patch Repairs with BM 50 mm
Removal of all failed material, trimming of completed excavation to provide firm vertical faces,cleaning of surface,panting of tack coat on sides and base of excavation ,back filling the pot-holes with BM, compacting,trimming and finishing the surface to form a smooth continuous surface. (Including cost of Bitumen, HMP, Machinary & Labour) (Excluding GST) | 800 | Sqm | 550 | ₹4,40,000 |
| 4 | Filling Pot-holes and Patch Repairs with Bituminous Concrete 30mm
Removal of all failed material, trimming of completed excavation to provide firm vertical faces,cleaning of surface,panting of tack coat on sides and base of excavation as per clause 503,back filling the pot-holes with hot bituminous material as per clause 504, compacting,trimming and finishing the surface to form a smooth continuous surface,all as per clause 3004.2 (Including cost of Bitumen, HMP, Machinary & Labour) (Excluding GST) | 1,450 | Sqm | 450 | ₹6,52,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.66 MB
Tendernotice_2.pdf
PDF • 0.38 MB
BOQ_2234842.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .