Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC | ₹1.6 L | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹1.7 LRejected-AOC | ₹1.7 L | L2 | Rejected-AOC REJECTED |
| Sl No | Description | Qty | Unit | M RAMARAJ L1 | S RAJU L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the damaged RCC Slab as per Instruction of departmental officers..including all initial lead and lift etc complete. | 1 | M3 | 4,308 ₹4,308 | 4,315 ₹4,315 |
| 2.00 | Dismantling the damaged PCC WALL as per Instruction of departmental officers..including all initial lead and lift etc complete. | 1 | M3 | 486 ₹486 | 500 ₹500 |
| 3.00 | Earth work excavation in all soils and sub-soils and the full depth as may be directed by the departmental officers with initial lead and lift and cleaning and levelling the site etc., complete complying with standard specification | 4 | M3 | 113 ₹452 | 125 ₹500 |
| 4.00 | Cement concrete 1:4:8 mix (one cement, four sand, eight metal )using 40mm size hard broken stones from approved quarry complying with standard specification, labour chages etc.. Completed.. | 2 | M2 | 5,338 ₹10,676 | 5,360 ₹10,720 |
| 5.00 | Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | 3 | M3 | 281 ₹843 | 290 ₹870 |
| 6.00 | Plan Cement concrete 1:2:4mix (one cement, two sand, four metal )using 20mm size hard broken stones from approved quarry complying with standard specification. | 7 | M3 | 6,680 ₹46,760 | 6,680 ₹46,760 |
| 7.00 | Plastering in Cement Morter 1: 3 Mix using 20 mm Thick including Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete | 51 | M2 | 611 ₹31,161 | 611 ₹31,161 |
| 8.00 | Supplying, fabricating, erecting structural steel work for roofing welded or bolted type using MS channels, angles, plates and round bars etc. conforming to IS specification including primer coating and enamal painting as per Design given by the departmental officers etc, complete as per standard specification | 620 | M2 | 108 ₹66,960 | 115 ₹71,300 |
| 9.00 | Conveying the excavated earth from the site from 0 to 15 km lead including loading and unloading charges etc., completed. | 6 | M3 | 166 ₹996 | 175 ₹1,050 |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
27 May 2025, 3:00 pmClosed
Assistant Commisssioner,West Zone
West Zone, Coimbatore Corporation
Maintenance and Repair work to the existing bridge at Maruthakonar street cut road in ward.no.42 of West Zone
2025_MAWS_557786_25
E1/Westzone/2025
Open Tender
Civil Works
90 days
West Zone, Coimbatore Corporation.
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹2,000
11 Mar 2026
15 May 2025
27 May 2025
16 May 2025
27 May 2025
16 May 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid