| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.8 LAccepted-AOC | L-1 | Accepted-AOC Successful Bidder | |
| 2 | L-2₹1.8 L+₹6,137.18 (3.50%)Rejected-Finance | L-2 | Rejected-Finance Unsuccessful Bidder | |
| 3 | L-3₹2.1 L+₹34,530.92 (19.7%)Rejected-Finance | L-3 | Rejected-Finance Unsuccessful Bidder | |
| 4 | L-4₹2.2 L+₹48,202.93 (27.5%)Rejected-Finance DATLA JUNNARDEO TEHSIL CHHINDWARA DISTRICT MADHYA PRADESH | L-4 | Rejected-Finance Unsuccessful Bidder | |
| 5 | L-5₹2.4 L+₹65,662.86 (37.4%)Rejected-Finance | L-5 | Rejected-Finance Unsuccessful Bidder |
Tender Value
₹3.5 L
EMD Value
₹4,400
Closing Date
30 Jul 2024, 11:00 amClosed
Staff Officer (Civil) KA
Office of the Area General Manager, Dungariya, Kanhan Area
Installation of Railing on bridge near Naveen Kanya Shala Panara under CSR of Kanhan Area
2024_WCL_312955_1
ka3450-civ-s-e016 of 2024-25
Open Tender
Civil Works - Others
Item Rate
45 days
Naveen Kanya Shala Panara unit G.M. unit
-----N.A.------
3 documents required · 3 mandatory
₹4,400
2 Sept 2024
19 Jul 2024
31 Jul 2024
20 Jul 2024
30 Jul 2024
20 Jul 2024
20 Jul 2024 - 27 Jul 2024
Amount
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m All kinds of soil.
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.Hard rock (blasting prohibited)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
Brick work with clay fly ash F.P.S. (non modular) brick of class designation 3.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand).
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 25x25 mm made of G.I. wire of dia 3 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge.
Total impact of GST for the purpose of CTC
MD. OWAISH SIDDIQUE
SAHEB CONSTRUCTION
firoj ansari
SUNIL VERMA
SUNIL CONSTRUCTION
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_324314.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .