Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.0 L+₹15,609.84 (5.57%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.0 L+₹19,892.53 (7.10%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹3.2 L+₹37,823.83 (13.5%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4 L
EMD Value
₹12,000
Closing Date
14 Jul 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
COMPLETION OF SATRISHI PARK ALONG WITH DEVELOPMENT OF SATRISHI SOURCE BLOCK VERINAG
2026_RDPR_315182_11
ENIT53of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹12,000
15 Jul 2026
8 Jul 2026
15 Jul 2026
8 Jul 2026
14 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | G Site Clearence by way of engagement of labs | - | nos | - | - |
| 0.0 | Demolishing C Concrete manually /Mechanically means incld disposal of material with 50 mtrs lead | - | Cum | - | - |
| 0.0 | BrickWork With Common Burnt Clay Bricks FPS of Class Designation 75 in foundation & Plinth in C mortar 1:4 mix | 1 | Cum | - | - |
| 0.0 | Extra B Work with Common Burnt Clay Bricks in Super Structure above Plinth Level | - | Cum | - | - |
| 0.0 | P/L in position C.C of specified grade excluding the cost of centring and shuttering 1:2:4 20mm nominal size). | 1 | Cum | - | - |
| 0.0 | Structural SteelWork in Built Up Sections incld Cutting Bending Complete Job | - | kgs | 1 | - |
| 0.0 | P/F Centring and shuttering including strutting, propping etc. and removal of formwork complete job | - | Sqm | - | - |
| 0.0 | Carriage of Materials by MT 35Kms( Sand Agg) | 1 | cum | 1 | ₹1 |
| 0.0 | Bricks | - | Nos | 1 | - |
| 0.0 | Sign board etc | - | LS | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_1021513.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .