| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.9 CrAccepted-AOC | ₹1.9 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹2.0 CrRejected-Finance | ₹2.0 Cr | L-2 | Rejected-Finance As per BOQ |
| Sl No | Description | Qty | Unit | AMAN TRADERS L1 | JITENDRA KUMAR MISHRA L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
All kinds of soil | 1,698 | Cum | 150 ₹2,54,700 Lowest | 154 ₹2,61,492 |
| 2.00 | Extra for every additional lift of 1.5 m or part thereof in excavation banking excavated or stacked materials:
All kinds of soil | 111 | Cum | 107 ₹11,877 Lowest | 111 ₹12,321 |
| 3.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | 31.1 | Cum | 220 ₹6,842 Lowest | 226 ₹7,028.6 |
| 4.00 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :
All kinds of soil:
Pipes, cables etc. not exceeding 80 mm dia. | 100 | metre | 182 ₹18,200 Lowest | 188 ₹18,800 |
| 5.00 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :All kinds of soil:
Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia | 100 | metre | 298 ₹29,800 Lowest | 305 ₹30,500 |
| 6.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift. | 865 | Cum | 166 ₹1,43,590 Lowest | 170 ₹1,47,050 |
| 7.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas within AAI Premises (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and filling avaliable earth obtained for subgrade, embankment, depressions as instructed and in layers not exceeding 20 cm (loose) in depth (or any thickness as approved by the Engineer-in-Charge in case vibratory roller / soil compactor is used) including breaking clods, watering, consolidating each layer with power road roller 8 -10 tonnes weight or vibratory roller / soil compactor of adequate capacity under optimum moisture content condition to give at least 95% of the maximum laboratory dry density (modified Proctor density) as per IS : 2720 (part VIII) complete including leveling, fine dressing to the required grade, camber and slope complete as per MORTH specifications and as directed by the Engineer-in-Charge with all leads and lifts. (The item includes cost of excavation, carriage of avaliable earth upto work site for all leads and lifts and compaction . Payment shall be made for compacted quantity only | 1,008 | Cum | 237 ₹2,38,896 Lowest | 242 ₹2,43,936 |
| 8.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 75 | Cum | 1,799 ₹1,34,925 Lowest | 1,842 ₹1,38,150 |
| 9.00 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 591 | Sqm | 332 ₹1,96,212 Lowest | 340 ₹2,00,940 |
| 10.00 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 268 | Sqm | 713 ₹1,91,084 Lowest | 731 ₹1,95,908 |
Tender Value
₹1.9 Cr
EMD Value
₹5.8 L
Closing Date
5 Nov 2025, 6:00 pmClosed
AGM (E-C)
Technical Block, Jabalpur Airport
Construction of Quarter Guard and associated work at Jabalpur Airport Jabalpur
2025_AAI_251872_1
Construction of Quarter Guard and associated work at Jabalpur Airport Jabalpur
Open Tender
Civil Works
Item Rate
180 days
Jabalpur Airport
Please refer Tender documents.
17 documents required · 17 mandatory
₹1,180
₹5.8 L
27 Mar 2026
14 Oct 2025
7 Nov 2025
14 Oct 2025
5 Nov 2025
14 Oct 2025
14 Oct 2025 - 22 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.92 MB
QGTD.pdf
Tender Documents • 11.25 MB
BOQ_289865.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].