Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.7 L
EMD Value
₹11,400
Closing Date
17 Feb 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER RNB DIVISION PULWAMA
EXECUTIVE ENGINEER RNB DIVISION PULWAMA
Construction of Drain from H/O Gh. Mohd Bhat to H/o Mohd Subhan Kar behind Gh. Mohammad Bhat at Sirnoo Pulwama.
2022_PWDJK_159645_1
Fresh423/EEP/RNB/of 2021-22/14588-98 dt 07.02.22
Open Tender
Civil Works
Percentage
10 days
Pulwama
as per nit
3 documents required · 3 mandatory
₹300
EXECUTIVE ENGINEER RNB DIVISION PULWAMA
₹11,400
17 Feb 2022
7 Feb 2022
17 Feb 2022
7 Feb 2022
17 Feb 2022
7 Feb 2022
120 days
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) over areas (Exceeding 30 cm in depth, 1.5mtr in width as well as 10 sqm on plan) including disposal of excavated earth, as directed by Engineer-incharge disposed earth to be levelled and neatly dressed: All kinds of soil. (including Headload)
Providing and laying of stone soiling dully hand packed including carriage of stone soling with loading unloading and stacking complete.(including Headload)
Providing and laying in position cement concrete of specified grade excl. the cost of centering and shutering. All work upto plinth level 1:4:8 (1cement: 4fine sand: 8 graded stone aggregate 40mm nominal size)(Crushed). Including carriage of all materials involved with loading unloading and stacking complete.(including Headload)
Providing and laying in position cement concrete of specified grade excl. the cost of centering and shutering. All work upto required level 1:2:4 (1cement: 2 fine sand: 4 graded stone aggregate 20mm nominal size)(Crushed). Including carriage of all materials involved with loading unloading and stacking complete.(including Headload)
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, walls etc. for mass concrete.(including Headload)
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with floating coat of neat cement including cement slurry, but excluding the cost of noising of steps etc. complete. 50mm thick 20 mm nominal size stone aggregate Including carriage of all materials involved with loading unloading and stacking complete. (including Headload)
12mm Cement Plaster of mix: 1:4 (1 cement : 4 fine sand) Including carriage of all materials involved with loading unloading and stacking complete.
Provision for taking of Geo-taged-photographs before during and after execution of work including providing and fixing of Information Board as directed by Engineer Incharge.
M/S MOHD AYUB NENGROO
stage.html
html • 0.02 MB
finance_362984.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .