Tender Value
₹4.1 Cr
EMD Value
₹3.5 L
Closing Date
11 Feb 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TECH SIG
16 conditions · 2 needing a document upload
: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less, where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderer shall submit requisite information as per Annexure-VIII given in tender document, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. As per Clause No. 10.2 of Tender Form (second Sheet) of Annex. I of Part-I of GCC-2022, with up to date correction slip.
(a) The tenderer must have successfully completed or substantially completed any of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work each costing not less than the amount equal to 60% ofadvertised value of the tender. (b) (1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender.
Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b) (2) In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Signal & Telecom Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfillment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Signal & Telecom Engineer in writing.
Note: A work experience certificate from a private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate. As per Clause No. 10.1 of Tender Form (second Sheet) of Annex.I of Part-I of GCC-2022, with up to date correction slip
Defination of Similar Work :- "Any Signaling Work"
12 conditions · 4 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
1. Suchan station is an Electronic Interlocking station of the HITACHI make. 2. Raman station is an Electronic Interlocking station of the HITACHI make. 3. Mini Plan of both above yards is attached. 4. List of LC Gates proposed for Interlocking is also attached.
Provision of Interlocking of 08 Nos. of manned LC Gates (excluding S&T service building), i.e., LC-138, 159A, 147, 120, 180, 159, 170, 152 in SSA-BTI section over Bikaner Division.
SnT-BKN-ET-2025-26-35~NWR
SnT-BKN-ET-2025-26-35
Open
Works - General
12 Months
Bikaner, Rajasthan
₹0
₹3.5 L
11 Feb 2026
20 Jan 2026
28 Jan 2026
129 items across 14 schedules · ₹2,88,95,884.12 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| and supply of Hot Architecture Electronic system complete as per specification No. Ver. 2 or latest, as requirement & tentative Plans & Diagrams. Interlocking (EI) system of Central Processing Interface Equipment/Relays requirements, Dual operator VDU panel (42" LED) (Hot stand-by dual one system online and in standby mode), All Relays suitable for EI, cables and Jumper wires, maintenance Terminals UPS minimum 1 hr back power supply converters Housing for EI Relay R a c k s , fuses, disconnecting type terminals, arrangements and necessary to make the EI as per approved The tenderer should details of cards/ sub-modules connectors etc. Supply of 10% Essential equipments subject to of each type mainly processor, cards/ module, etc. Item wise detailed unit and quantity to be separate annexure. (THIS BE USED ONLY FOR IN EXISTING EI) Inspection charges: Payment terms:100% | — | — | — | — | |
| 1 | routes less than 100(Per read as Per Vital Bit of | Per Unit | 30.00 | 87,987.65 | 26,39,629.5 |
| 2 | wiring, programming, commissioning of EI as per supply item above of Chapter 1 of this transportation from to site. The works and installation, wiring, testing grouting, cutting of refilling of the same, re- CC/ masonry works, laying of insulated casing-capping/ cable trays/ Cables, termination of connectors, painting,/ be provided/ done by the the equipments supplied of Chapter 1 of SOR. This networking of built in EI of all the stations to to any other places by Engineer-in-charge. BE USED ONLY FOR IN EXISTING EI) Note: be comply to RDSO Advisory Note No dtd. 28.08.2014. wiring, programming, commissioning of Operator stand-by with Redundancy. Equipments/cards/Modules required with Redundancy shall & Installed by the This also includes nos. of composite printer table (Godrej work and one no Godrej make model PCH7001. indoor/ PIJF cables in relays, tag blocks, CT approved wiring diagram modifications as Soldering to be done at termination. Dressing/ lacing done neatly with help / plastic self lock strip The tools/ equipments/ boards required for supplied / fabricated by includes replacement of LEDs/ equipments going testing. Necessary boards with required sockets, surge & boxes shall be installed by the contractor. shall be arranged by supplies are required from Power room / relay shall be extended by with his own materials mm wires, cables, lugs, insulated ladders etc. After Factory Acceptance Tests Sheet testing system free while submitting to suitable necessary taken by Engineer-in- Consignee Inspection Payment terms: 100% | Job | 2.00 | 5,42,784.93 | 10,85,569.86 |
| 3 | & supply of drawings print copies and original CAD FORMAT for Interlocking at each station. of the work, the drawings incorporating are to be supplied as Specifications given in (upto 6 Line). The specifications are as per of SOR. Inspection: Inspection charges: None 100% after execution | Station | 2.00 | 1,75,967.35 | 3,51,934.7 |
| 4 | SWR literature in english associated mid-section with all corrections as SWRD & approved SIP. For corrections, editing, correction etc. are to be one rough print to be for approval before required for final processing This also includes maintenance cards in by Rly. Inspection: Inspection charges: None after execution. | Station | 8.00 | 3,598.62 | 28,788.96 |
| 5 | Station Working Rules hindi and framing out in similar software )as per The required SWR in be provided by the has been covered no. 1.21 of Chapter 1 Inspection: Consignee charges: None Payment execution. | Station | 8.00 | 4,478.18 | 35,825.44 |
| 6 | & binding of the in English/hindi/Diglot practice. Inspection: Inspection charges: None after execution. | Set | 48.00 | 178.52 | 8,568.96 |
| 7 | and plans to suit layout signalling plan of IBS/ABS/LC and wiring diagram shall Auto cad Drawing and This will include supply Indication panel diagram, plan, square sheet, wiring Relay rack/Relay Bus bar details, Fuse analysis, Relay room analysis, panel tag block panel diagram, IPS Auto change over equipment arrangement switch, Block circuit wiring Axle counter wiring other relevant drawings. shall initially supply (Paper Prints) for Railways. Railway will return contactor duly approved alterations/corrections, if any. The incorporate Railways' corrections/ comments, if tracing & CD without any submit all the tracings and with all respect for Railways. After Approval of tracings, the contractor sets of final approved Railways within 15 days. the each sheet has a of railway official as for signature of firm, duly authorized signatory of the of the work as given by written on every sheet column. All the drawing in a good quality folder Gate. Inspection: Inspection charges: None after execution. | Lot | 8.00 | 14,378.9 | 1,15,031.2 |
| 8 | in connection with wiring diagrams as per Plan and submission as outdoor completion includes Route Section Table (ST), Locking Control Panel Diagram Two copies of prints will be submitted to checking. If alterations are by Railways then of prints will be advance approval after all the alterations as by the Railways. submitted for all the mentioned above for the by Railway prior to of station. All drawings in CAD. The wiring consist relay rack analysis, analysis, fuse details. Tag etc. A separate CD/Pen submitted to Railway for with original tracings. preparation and supply of of all completion plans diagrams and indoor as completion documents 75-micron polyester film for CAD. 6 (Six) sets xerox submitted for each of the mentioned below: Cable Core Chart, Location all the locations, Cable Signalling Plan, SWR Diagrams, Selection Table, Contact Analysis, Block Analysis of Relay Rack, Control Cum Panel/VDU diagram, Power Track Circuit Plan, Rack and Junction Box details cost of design and documents for a station/yard on basis of total movements/routes as per (ST). Inspection: Inspection charges: None after execution. | Per Route | 10.00 | 4,153.92 | 41,539.2 |
| 9 | supply of laminated one completion plans including and indoor as well as documents on polyester film for CAD. 6 (Six) sets xerox be provided for each of mentioned below: Cable Core Chart, Location all the locations, Cable Signalling Plan, SWR Diagrams, Selection table, Contact analysis, Block analysis of Relay Control cum Indication Diagram, Power Panel circuit plan, rack and Junction Box details Consignee Inspection Payment terms:100% | Sheet | 1000.00 | 161.07 | 1,61,070 |
| 10 | supply of laminated one completion plans including and indoor as well as documents on micron polyester film for Interlocked LC Gate (OSL) on sets xerox copies will each of the documents Cable Route Plan, Location details plan locations, Cable termination Plan, SWR Diagram, Contact Analysis, Fuse Analysis of Relay Rack Control Cum Indication Diagram, Power Panel Circuit Plan, Rack and Junction Box details Consignee Inspection Payment terms:100% | LC Gate | 8.00 | 8,368.63 | 66,949.04 |
| 11 | in existing relay room includes supply of PVC Railway signalling cable of (1/0.6) RDSO Spec.No.IRS/S-76/89 for wiring between SM's/Panel room & Relay SM office for block includes supply of PVC wires of multi strand in all colours as per Specn.No.IRS-S-76/89(Amnd.2 or will include bringing all from power room to bars on relay racks by copper flexible wire as of engineer incharge. wiring between control room if required. All done as per standard Western Railway with & threading. The item & wiring of tag block, bases(G-Type and ND Type) related material required indoor wiring in relay room. Consignee Inspection Payment terms:100% | Per Relay | 30.00 | 524.1 | 15,723 |
| 12 | wiring at Mid Section Gate (OSL). It includes insulated indoor Railway @40<45@Core/40-Core) sqmm as per RDSO (Amnd.2 or latest) between relay room and & Relay room to DP in block working. This also of PVC insulated jumper strand 16/.2 mm, tinned in RDSO Speen.No.IRS-S- or latest). This item will all the power supplies to respective bus bars by using 10/6 sqmm wire as per instructions of This will also include control panel and relay All wiring will be done practice of North with neat dressing & item includes supply & block, fuse with bases(G- and all other related for complete indoor wiring at mid section Gate. Inspection: Inspection charges: None terms:100% after | LC Gate | 8.00 | 9,620.42 | 76,963.36 |
| Schedule total | ₹46,27,593.22 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCCS10.pdf
ATTACHMENT
GCCCS1.pdf
ATTACHMENT
GCCCS5.pdf
ATTACHMENT
GCCCS4.pdf
ATTACHMENT
GCCCS9.pdf
ATTACHMENT
GCCCS6.pdf
ATTACHMENT
GCCCS3.pdf
ATTACHMENT
GCCCS8.pdf
ATTACHMENT
IRGCCApril2022.pdf
ATTACHMENT
GCCCS2.pdf
ATTACHMENT
GCCCS7.pdf
ATTACHMENT
LC-138SHN.pdf
ATTACHMENT
LC-170RMN.pdf
ATTACHMENT
ListofLCGates.pdf
ATTACHMENT
TechnicalCondition.pdf
ATTACHMENT
SnT-BKN-ET-2025-26-35.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .