| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Finance | -0.11% | ₹1.3 L | L1 | Admitted-Finance |
| 2 | L2₹1.3 L+₹105.54 (0.08%)Admitted-Finance | -0.03% | ₹1.3 L+₹105.54 (0.08%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 L+₹131.92 (0.10%)Admitted-Finance | -0.01% | ₹1.3 L+₹131.92 (0.10%) | L3 | Admitted-Finance |
Tender Value
₹1.6 L
EMD Value
₹3,100
Closing Date
10 Jul 2026, 12:00 pmClosed
B.D.O. MARDAH GHAZIPUR
OFFICE B.D.O. MARDAH GHAZIPUR
PRATHMIK VIDYALAYA RASULABAD ME BALAK BALIKA SHAUCHALAYA KA NIRMAN KARY
2026_RDUP_1166247_6
457 date 03-07-2026
Open Tender
Civil Works
Percentage
90 days
mardah
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
B.D.O. MARDAH GHAZIPUR
₹3,100
Yes
11 Jul 2026
4 Jul 2026
10 Jul 2026
4 Jul 2026
10 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil including lift upto 1.50 M and lead upto 30M. Including watering ramming and dressing etc. and disposal of surplus earth as upto a distance of 30 M. from the foundation trenches.etc. required for proper completion of the work. SI.No.251. | 8.32 | cum | 130 | ₹1,081.6 |
| 2 | Concrete with 4 cm gauge brick ballast Coarse sand of 2.25 F.M and cement in proportion of 1:6:12 in foundation and under floor including supply of all materials labour T & P etc. required for proper completion of the work. S.I.No.273 | 1.31 | cum | 4,960.03 | ₹6,497.64 |
| 3 | M- 150 brick work in 1:4 cement & F sand in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. S.I.No. 303 | 3.86 | cum | 5,450 | ₹21,037 |
| 4 | 2cm (3/4") thick DPC cement and c.sand 1:3 SI No. 360 | 1.93 | sqm | 4,960.03 | ₹9,572.86 |
| 5 | Find sand filling in soak pit | 0.52 | cum | 510.06 | ₹265.23 |
| 6 | Laying of c.c. slab 10cm thick in 1:1.5:3 cement c.sand and 20mm gauge stone grite over prapared subgrade after its rectification bringing it to proper camber i/c all. SI No. 773b | 1.25 | cum | 7,100 | ₹8,875 |
| 7 | Mild steel iron in work sI no. 504 | 1.27 | Qtl. | 6,350 | ₹8,064.5 |
| 8 | Class M-150 brick work in cement & fine sand mortar in 1:4 in foundation inclduing supply of all labour material etc. as per SI No. 305 | 2.05 | cum | 5,860 | ₹12,013 |
| 9 | 12mm thick plastering in 1:4 cement and fine sand mortar on rough surface i/c all complete as per SI NO. 584 | 19.08 | sqm | 299.81 | ₹5,720.37 |
| 10 | Same as item No. 12 above but in Plain surface S.I.No.
584 | 19.08 | sqm | 260.2 | ₹4,964.62 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_2187633.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .