| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹15.2 L+₹10,090.57 (0.67%)Rejected-Finance | L2 | Rejected-Finance Tender opened |
| Sl No | Description | Qty | Unit | RADHIKA VBR CONSTRUCTION L2 | KALIYAPERUMAL KASINATHAN L1 |
|---|---|---|---|---|---|
| 1.00 | Picking the existing black top/ WBM surface to 50 MM depth including labour, hire charges d plants and all other incidental charges etc. complete as per MOST specification.. | 377.5 | M2 | 44 ₹16,610 | 23.36 ₹8,818.4 Lowest |
| 2.00 | Providing US Gravel with a lead of 2.068 KM including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc Side Beem KM-0/0-0/265 | 18.12 | M2 | 487.55 ₹8,834.41 Lowest | 487.55 ₹8,834.41 Lowest |
| 3.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 KM-0/0-0/265 | 141.56 | M2 | 3,205.45 ₹4,53,763.5 Lowest | 3,205.45 ₹4,53,763.5 Lowest |
| 4.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it KM-0/0-0/265 | 1,132.5 | M2 | 85.09 ₹96,364.43 Lowest | 85.09 ₹96,364.43 Lowest |
| 5.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc. | 1,132.5 | M2 | 21.74 ₹24,620.55 | 19.71 ₹22,321.58 Lowest |
| 6.00 | Bituminous Macadam (Grade-II) 50mm Thick Using VG30Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 34.04 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 | 56.63 | M2 | 9,935.78 ₹5,62,663.22 Lowest | 9,935.78 ₹5,62,663.22 Lowest |
| 7.00 | Providing and laying Bituminous Concrete to 40/30/25 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30/ VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP using (Vibratory Roller) | 28.31 | M2 | 12,467.67 ₹3,52,959.74 Lowest | 12,467.67 ₹3,52,959.74 Lowest |
| 8.00 | Providing Name Board | 1 | nos | 5,000 ₹5,000 Lowest | 5,000 ₹5,000 Lowest |
| 9.00 | Provision for Photocharges | 1 | Nos | 2,000 ₹2,000 Lowest | 2,000 ₹2,000 Lowest |
Tender Value
₹18 L
EMD Value
₹18,000
Closing Date
26 Aug 2025, 5:00 pmClosed
BDO BP Cuddalore
Block Development office Cuddalore
Strengthening of BT Road at Gund Upplavadi NGO Nagar Gundu Uppalavadi Panchayat Cuddalore 0/0 0/201 0.201km
2025_RDTN_597136_2
A3/1830/2025-MPLADS II
Open Tender
Civil Works - Water Works
Item Rate
90 days
Block Development office Cuddalore
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹18,000
13 Nov 2025
25 Aug 2025
26 Aug 2025
25 Aug 2025
26 Aug 2025
25 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_713691.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .