| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAdmitted-Finance | ₹3.6 L | L1 | Admitted-Finance |
| 2 | L2₹3.8 L+₹19,080 (5.25%)Admitted-Finance | ₹3.8 L+₹19,080 (5.25%) | L2 | Admitted-Finance |
| 3 | L3₹4.0 L+₹33,544.50 (9.22%)Admitted-Finance 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | ₹4.0 L+₹33,544.50 (9.22%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Pawan Kumar L3 | Kamal Jeet Kumar L2 | Sourav thakur L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches etc. in all kinds of soil such as pick work, jumper work, blasting work in soft / hard rock, chiselling in soft / hard including wedging out of a rock where blasting is prohibited and stacking the excavated earth up to all lifts, stacking the excavated soil up to all lead clear from the edge of excavation and then returniing the stacked soil in 15 centimeters layers when required in to plinths, sides of foundation etc. consolidating each deposited layer by ramming and waterng and then disposing of all surplus excavated earth as per direction and to the entire satisfation of Engineer- in- charge up to leads and lifts. | 12 | Cum | 400 ₹4,800 | 350 ₹4,200 Lowest | 350 ₹4,200 Lowest |
| 2.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering strutting and propping etc. with wooden batten and ballies, in all heights of propping and centring below supporting floor to ceiling upto all height and removal of the same for insitu-reinforced concrete and plain concrete work in :- | ||||||
| 2.01 | Vertical surfaces such as walls(any thickness) partitions and the like including attached pilasters, buttresses, plinth and string courses and the like complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 120 | Sqm | 350 ₹42,000 | 300 ₹36,000 | 250 ₹30,000 Lowest |
| 3.00 | Providing and laying cement concrete work 1:2:4 (1 Cement: 2 sand :4 graded stone aggregate 20mm nominal size ) and curing complete excluding the cost of form work and reinfocement for reinforced concrete work in Lintels, beams girers bressumers and cantilever upto floor two level as per direction and to the direction of Engineer-in-Charge. | 29.25 | Cum | 7,550 ₹2,20,837.5 | 7,500 ₹2,19,375 | 7,200 ₹2,10,600 Lowest |
| 4.00 | Providing and fixing of PVC pipe of 80 mm dia of ISI maked foe weep hole complete in all respect as per the direction of Engineer-in -charge | 10.5 | Rmt | 350 ₹3,675 | 300 ₹3,150 | 250 ₹2,625 Lowest |
| 5.00 | Providing mild or tor steel reinforcement for RCC. Work including bending binding and placing in position complete upto floor two level Tor steel complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 1,170 | Kg | 100 ₹1,17,000 | 95 ₹1,11,150 | 92 ₹1,07,640 Lowest |
| 6.00 | Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone aggregate 40mm nominal size and curing complete excluding the cost of form work in foundation and plinth complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 1.35 | Cum | 6,620 ₹8,937 | 6,600 ₹8,910 | 6,400 ₹8,640 Lowest |
Tender Value
₹3.9 L
EMD Value
₹7,741
Closing Date
2 Sept 2026, 5:00 pmClosed
Executive Engineer
JSV Division Bhoranj
CO Protection Work of main Storage Tanks at Awahdevi
2026_HPIPH_142028_1
6533-6593 dated 26-08-2026
Open Tender
Civil Works
Item Rate
120 days
Executive Engineeer Jal Shakti Division Bhoranj
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹7,741
3 Sept 2026
26 Aug 2026
3 Sept 2026
26 Aug 2026
2 Sept 2026
26 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation, trenches etc. in all kinds of soil such as pick work, jumper work, blasting work in soft / hard rock, chiselling in soft / hard including wedging out of a rock where blasting is prohibited and stacking the excavated earth up to all lifts, stacking the excavated soil up to all lead clear from the edge of excavation and then returniing the stacked soil in 15 centimeters layers when required in to plinths, sides of foundation etc. consolidating each deposited layer by ramming and waterng and then disposing of all surplus excavated earth as per direction and to the entire satisfation of Engineer- in- charge up to leads and lifts. | 12 | Cum | - | - |
| 2Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering strutting and propping etc. with wooden batten and ballies, in all heights of propping and centring below supporting floor to ceiling upto all height and removal of the same for insitu-reinforced concrete and plain concrete work in :- | |||||
| 2.01 | Vertical surfaces such as walls(any thickness) partitions and the like including attached pilasters, buttresses, plinth and string courses and the like complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 120 | Sqm | - | - |
| 3 | Providing and laying cement concrete work 1:2:4 (1 Cement: 2 sand :4 graded stone aggregate 20mm nominal size ) and curing complete excluding the cost of form work and reinfocement for reinforced concrete work in Lintels, beams girers bressumers and cantilever upto floor two level as per direction and to the direction of Engineer-in-Charge. | 29.25 | Cum | - | - |
| 4 | Providing and fixing of PVC pipe of 80 mm dia of ISI maked foe weep hole complete in all respect as per the direction of Engineer-in -charge | 10.5 | Rmt | - | - |
| 5 | Providing mild or tor steel reinforcement for RCC. Work including bending binding and placing in position complete upto floor two level Tor steel complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 1,170 | Kg | - | - |
| 6 | Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone aggregate 40mm nominal size and curing complete excluding the cost of form work in foundation and plinth complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 1.35 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Termsandconditions.pdf
Tender Documents • 0.21 MB
BOQ_210861.xls
BOQ • 0.25 MB
PWD8.pdf
Tender Documents • 4.22 MB
Form6.pdf
Tender Documents • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .