| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹2.5 L+₹63,173.02 (33.1%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹3.1 L+₹1.2 L (65.0%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Puran Chand L2 | M/s GNS Vertex L3 | irshad ahmad L1 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing jungle including uprooting of rank vegetation,grass,brush wood,trees and saplings upto girth of 30 cms measured at aheight of 1 m above ground level and removal of rubbish upto a distance of 50m outside the periphery of area cleared. | 44.61 | Sqm | 500 ₹22,305 | 12.49 ₹557.18 Lowest | 20 ₹892.2 |
| 2.00 | Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil. | 9.35 | Cum | 750 ₹7,012.5 | 250 ₹2,337.5 Lowest | 300 ₹2,805 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size) Complete job | 2.17 | Cum | 7,800 ₹16,926 | 6,000 ₹13,020 | 3,000 ₹6,510 Lowest |
| 4.00 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah complete job | 0.89 | Cum | 1,000 ₹890 Lowest | 6,500 ₹5,785 | 4,000 ₹3,560 |
| 5.00 | Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like:1 Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah complete job | 1.36 | Cum | 15,000 ₹20,400 | 7,500 ₹10,200 | 4,000 ₹5,440 Lowest |
| 6.00 | Extraction , transportation and Labour of Drift Wood for making Gae Top complete job as per directed by the site incharge
Engage 2 Carpenter for 5 days for making Gate | 10 | No | 5,000 ₹50,000 | 1,000 ₹10,000 | 800 ₹8,000 Lowest |
| 7.00 | Extraction , transportation and Labour of Drift Wood for making Gae Top complete job as per directed by the site incharge
Engage 4 Labour for 5 days for making Shelter Shed | 20 | No | 500 ₹10,000 Lowest | 1,500 ₹30,000 | 500 ₹10,000 Lowest |
| 8.00 | Providing and fixing of Nails | 6 | Kg | 1,000 ₹6,000 | 200 ₹1,200 | 100 ₹600 Lowest |
| 9.00 | Writing Words on Gate and Painting as per desired by site incharge | 1 | L.S | 10,000 ₹10,000 | 25,000 ₹25,000 | 1,000 ₹1,000 Lowest |
| 10.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 40mm nominal size) Crushed complete job | 2.23 | Cum | 3,000 ₹6,690 Lowest | 6,000 ₹13,380 | 4,000 ₹8,920 |
Tender Value
₹3.1 L
EMD Value
₹6,300
Closing Date
3 Jul 2026, 4:00 pmClosed
Wildlife Warden Chenab Division,Kishtwar
Kishtwar
Construction of Wooden Gates at Entry of National Park 10ft Height and 8ft Width with Side Chain Link Fencing at Katlu Kiyar for Publicity Wildlife Chenab Division Kishtwar for the Year 2026 27
2026_FD_313150_1
Nit 09 of 2026-27 Wooden entry Gate Katlu Kiyar
Open Tender
Civil Works
Item Wise
90 days
Katli Kiyar
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Wildlife Warden Chenab Division,Kishtwar
₹6,300
30 Sept 2026
20 Jun 2026
4 Jul 2026
20 Jun 2026
3 Jul 2026
20 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation,grass,brush wood,trees and saplings upto girth of 30 cms measured at aheight of 1 m above ground level and removal of rubbish upto a distance of 50m outside the periphery of area cleared. | 44.61 | Sqm | - | - |
| 2 | Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil. | 9.35 | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size) Complete job | 2.17 | Cum | - | - |
| 4 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah complete job | 0.89 | Cum | - | - |
| 5 | Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like:1 Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah complete job | 1.36 | Cum | - | - |
| 6 | Extraction , transportation and Labour of Drift Wood for making Gae Top complete job as per directed by the site incharge
Engage 2 Carpenter for 5 days for making Gate | 10 | No | - | - |
| 7 | Extraction , transportation and Labour of Drift Wood for making Gae Top complete job as per directed by the site incharge
Engage 4 Labour for 5 days for making Shelter Shed | 20 | No | - | - |
| 8 | Providing and fixing of Nails | 6 | Kg | - | - |
| 9 | Writing Words on Gate and Painting as per desired by site incharge | 1 | L.S | - | - |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 40mm nominal size) Crushed complete job | 2.23 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.34 MB
BOQ_1013412.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .