| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC MAKHI UNNAO | UNNAO | UNNAO | UTTAR PRADESH | ₹1.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 Cr+₹8.9 L (6.09%)Rejected-Finance | ₹1.5 Cr+₹8.9 L (6.09%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Less Similar Work experience attached |
Tender Value
Refer Docs
EMD Value
₹2.9 L
Closing Date
13 Nov 2024, 2:00 pmClosed
Chairman and Administrator, Greater Sharda Sahayak
Chairman and Administrator, Greater Sharda Sahayak Command Area Development Authority/Project, 23C, Gokhale Marg, Lucknow (U.P.)
Construction of R.C.C. Lined Channel, Unlined Channel, R.C.C. Water Controlling Structures Works
2024_GSSCA_969707_1
18/AGR./SNP-III/2024-25 dt. 22.10.2024
Open Tender
Civil Works - Others
Item Rate
365 days
SANTKABIRNAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹2.9 L
24 Apr 2025
29 Oct 2024
13 Nov 2024
29 Oct 2024
13 Nov 2024
29 Oct 2024
Amount
Earth Work in construction of Gulls/ channel manually or by tractor where ever possible and applicable,including hard clay,chharri,bajri up to 5%, including all leads and lifts, excluding mechanical compaction but inclusive of manual compaction and dressing to profile and all T & P required for proper completion of work.
Providing and laying LDPE 125 micron thick film(1st grade) on sub grade before construction of lining, gulls,structure etc including material,labour etc required for proper completion of work as per direction of engineer-in-charge.
Providing and Laying cement concrete 1:4:8 (1 cement: 4 coarse sand FM>2.0 : 8 stone grit 40mm nominal size) in foundation with mechanical mixing including cost of all material with all leads and lifts including compaction and curing etc required for proper completion of work as per directions of engineer-in-charge.
Providing and laying reinforcement cement concrete 1:2:4(M-15), (1- cement: 2- coarse sand FM>2.0: 4.75mm- 20mm nominal size aggregate) excluding cost of steel but including cost of centering and shuttering, with mechanical mixing and mechnical compaction including cost of all material,expansion joints, all leads and lifts, T & P and curing etc. required for proper completion of work as per direction of engineer-in-charge.
Providing steel reinforcement TMT bars of Primary Steel or equivalent of required dia as per drawing, including straightening, cutting ,bending,binding including cost of all material , labour and T & P etc. required for proper completion of work as per directions of engineer in charge.
Providing and fixing of NP3 hume pipe 300mm diameter in position and alignment including cost of all material , labour and T & P etc. required for proper completion of work as per directions of engineer in charge.
Providing and fixing of NP3 hume pipe 350mm diameter in position and alignment including cost of all material , labour and T & P etc. required for proper completion of work as per directions of engineer in charge.
JITENDRA KUMAR SINGH (BID ID -4712330)
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .