Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹7.2 L+₹99,368.40 (16.1%)Admitted-Fee/PreQual/Technical/Finance SE MOTTUR VILLAGE SERPAPATTU POST THANDARAMPET TALUK TIRUVANNAMALAI DISTRICT 606753 | TIRUVANNAMALAI | TAMIL NADU | 606753 | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹7.4 L+₹1.2 L (19.2%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹7.4 L+₹1.2 L (19.2%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹7.9 L+₹1.7 L (27.6%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | P.M.RADHAKRISHNAN L2 | R S CONSTRUCTION L3 | N.Chinnaraj L1 | P.G.Kannan L4 | MDP Constructions L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Construction of Mini Community Sanitary Complex for (Boys and special need Chilldren) Panchayat Union Middle School (Type-6A)@ Melchettipattu Panchayat | ||||||||
| 1.01 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,For Foundation | 16.35 | Cum | 220 ₹3,597 | 250 ₹4,087.5 | 189.92 ₹3,105.19 | 260 ₹4,251 | 63.35 ₹1,035.77 Lowest |
| 1.02 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 6.24 | Cum | 4,556 ₹28,429.44 | 5,000 ₹31,200 | 3,816.26 ₹23,813.46 Lowest | 5,300 ₹33,072 | 5,070 ₹31,636.8 |
| 1.03 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 9.45 | Cum | 450 ₹4,252.5 | 200 ₹1,890 | 1,174.2 ₹11,096.19 | 220 ₹2,079 | 115 ₹1,086.75 Lowest |
| 1.04 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Below Basement. | 22.3 | Cum | 950 ₹21,185 | 400 ₹8,920 | 394.2 ₹8,790.66 Lowest | 450 ₹10,035 | 520 ₹11,596 |
| 1.05 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Above Basement. | 69.26 | Cum | 950 ₹65,797 | 800 ₹55,408 Lowest | 888.4 ₹61,530.58 | 900 ₹62,334 | 950 ₹65,797 |
| 1.06 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete Upto basement | 14.67 | Cum | 4,250 ₹62,347.5 Lowest | 6,200 ₹90,954 | 4,675.75 ₹68,593.25 | 6,300 ₹92,421 | 5,800 ₹85,086 |
| 1.07 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.Upto Basement | 3.9 | Cum | 8,150 ₹31,785 | 8,300 ₹32,370 | 4,442.62 ₹17,326.22 Lowest | 8,500 ₹33,150 | 8,513 ₹33,200.7 |
| 1.08 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.Above Basement | 5.97 | Cum | 8,150 ₹48,655.5 | 8,500 ₹50,745 | 4,542.62 ₹27,119.44 Lowest | 8,800 ₹52,536 | 8,647 ₹51,622.59 |
| 1.09 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.75 | MT | 75,000 ₹56,250 | 85,000 ₹63,750 | 66,743.42 ₹50,057.57 Lowest | 88,000 ₹66,000 | 83,000 ₹62,250 |
Tender Value
₹8.7 L
EMD Value
₹8,700
Closing Date
25 Sept 2026, 3:00 pmClosed
Block Development Officer (V.Pt) Tiruvannamalai
Block Development Office, Tiruvannamalai
Construction of Mini CSC (Type-6A) for PUMS Middle School (Boys and Special need Children) at Melchettipattu Habitation in Melchettipattu Panchayat
2026_RDTN_704154_1
No.PA5/1677/2026 Dt. 05.08.2026 01
Open Tender
Civil Works - Buildings
Lump-sum
60 days
Tiruvannamalai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,700
25 Sept 2026
11 Sept 2026
25 Sept 2026
11 Sept 2026
25 Sept 2026
11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Mini Community Sanitary Complex for (Boys and special need Chilldren) Panchayat Union Middle School (Type-6A)@ Melchettipattu Panchayat | |||||
| 1.01 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,For Foundation | 16.35 | Cum | 1.25 | ₹20.44 |
| 1.02 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 6.24 | Cum | - | - |
| 1.03 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 9.45 | Cum | 100 | ₹945 |
| 1.04 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Below Basement. | 22.3 | Cum | 53 | ₹1,181.9 |
| 1.05 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Above Basement. | 69.26 | Cum | 10 | ₹692.6 |
| 1.06 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete Upto basement | 14.67 | Cum | 11 | ₹161.37 |
| 1.07 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.Upto Basement | 3.9 | Cum | 10 | ₹39 |
| 1.08 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.Above Basement | 5.97 | Cum | 11 | ₹65.67 |
| 1.09 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.75 | MT | 53 | ₹39.75 |
stage.html
html • 0.02 MB
finance_846336.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_846336.xls
BOQ • 0.36 MB
Documents_Melchettipattu.pdf
Tender Documents • 0.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .