Loading…
Loading…
Tender Value
₹29.5 L
EMD Value
₹59,000
Closing Date
16 Sept 2026, 4:00 pmDue today
Executive Engineer PD 3rd Sgr
Executive Engineer PD 3rd Sgr
Construction of Barracks for jawans with accommodation of 01 Cop at Sempora Pampore Srinagar.
2026_PWDJK_322359_4
e-NIT No. 15-P of 08/2026 Dated -25- 08-2026
Open Tender
Civil Works
Percentage
90 days
Executive Engineer PD 3rd Sgr
As per NIT
2 documents required · 2 mandatory
₹1,100
Executive Engineer PD 3rd Sgr
₹59,000
27 Aug 2026
27 Aug 2026
17 Sept 2026
27 Aug 2026
16 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Levelling of the Ground to make it ready for the construction of the structure with all costs of men, material and carriages complete upto the site of work | 42.48 | Cum | 65.9 | ₹2,799.43 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc.(not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like no texceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth 25 meter beyond 1 m from cutting edge as directed by EIC ( All kind of soil) | 42.59 | Cum | 576.45 | ₹24,551.01 |
| 3 | Providing and laying stone soiling ( Hand packed) in trenches including all leads , lifts and carriage upto site of work. | 32.01 | Cum | 950 | ₹30,409.5 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:-1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 23.51 | Cum | 5,202.9 | ₹1,22,320.18 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:-1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 36.71 | Cum | 6,591.25 | ₹2,41,964.79 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases for columns | 49.78 | Sqm | 286.35 | ₹14,254.5 |
| 7 | Providing & fixing wood work in frames of doors, windows & other frames, wrought framed & fixed in position KD wood incl carriages etc upto site of work complete). | 1.05 | Cum | 55,000 | ₹57,750 |
| 8 | Providing and fixing 35mm thick paneled or paneling and glazed shutters for doors, windows and clerestory windows including I.S.I. Marked black enameled M.S. butt hinges with necessary screws excluding paneling, (which shall be paid for separately) KD wood. | 15.61 | Sqm | 3,300 | ₹51,513 |
| 9 | Providing and fixing 35mm thick paneled or paneling and glazed shutters for doors, windows and clerestory windows including I.S.I. Marked black enameled M.S. butt hinges with necessary screws excluding paneling, (which shall be paid for separately) 1st class kail wood. | 3.68 | Sqm | 5,302.2 | ₹19,512.1 |
| 10 | Providing and fixing 35 mm thick wire gauze shutters using galvanized M.S. wire gauze of average width for aperture 1.4 mm with wire of dia .0.63 mm for doors, windows and clerestory windows including I.S.I. marked black enameled M.S. butt hinges with necessary screws. (Ist.KD wood.) | 19.3 | Sqm | 3,300 | ₹63,690 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_1080157.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .