Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹9.9 L+₹3.4 L (51.8%)Rejected-Finance | L2 | Rejected-Finance Above Rate |
| Sl No | Description | Qty | Unit | John Arthor L2 | vignesh L1 |
|---|---|---|---|---|---|
| 1.00 | Diesel Generator -New Chemicial earth bit installation DG Side Cable gland with cable termination doubleearth connecting DG alternator and beld side cleaning work DG New Battery replacement & Dianomo Motor power supply checking oil level, coolant level (Quality of character) (As Per Quotation) | 1 | Nos | 60,500 ₹60,500 | 40,620 ₹40,620 Lowest |
| 2.00 | CABLE LAYING (New & Old Cables) 4sqmm 4 core felxable cable front gate to securtiy gate (32 meter) 4sq mm 4core Ar aluminum cable office rest room to office panel side -24 meter. 4sq mm 4 core Alu-Ar Cable (CCTV room to DB) laying and termination with cable dressing work 10 sqmm 4 core Alu-Ar cable office panel to MBBR Panel (46 Meter) (As Per Quotation) | 1 | Nos | 58,730 ₹58,730 | 48,120 ₹48,120 Lowest |
| 3.00 | Light fitting Fixed & Termination work: focus light 100w repalcement work (3 Nos) Security gate 20w tube lights fitting fixed work -2 Nos, Name Board light power supply given work & 2 pole MCB box fixing work back side rest room and office rest room power supply and 2 way MCB Box fixing work (As Per Quotation) | 1 | Nos | 44,500 ₹44,500 | 24,260 ₹24,260 Lowest |
| 4.00 | CONTROL PANEL - 32A 3p MCB replacement work 6 Nos 63A p MCB repalcement work 2 Nos New dewatering pump OLR repalcement work all control panels dressing work new de-watering 3 phase pump power supply given work (As Per Quotation) | 1 | Nos | 40,000 ₹40,000 | 20,000 ₹20,000 Lowest |
| 5.00 | Supply and fixing New three phase pump 750 CW 1.0HP 2 Nos (As Per Quotation) | 1 | Nos | 61,200 ₹61,200 | 41,200 ₹41,200 Lowest |
| 6.00 | Supply and delivery 12V 100 ah Battery (As Per Quotation) | 1 | Nos | 32,600 ₹32,600 | 12,600 ₹12,600 Lowest |
| 7.00 | New Ar.Cu. cable & electrical material (As Per Quotation) | 1 | Nos | 2,12,000 ₹2,12,000 | 1,12,000 ₹1,12,000 Lowest |
| 8.00 | Battery vehicle Old Battery repalement and New Battery Installation work -5 Nos (As Per Quotation) | 1 | Nos | 1,40,500 ₹1,40,500 | 1,12,500 ₹1,12,500 Lowest |
| 9.00 | Online Monitoring Ph sensor, TSS Sensor, replacement and Installation -1 Nos (As Per Quotation) | 1 | Nos | 2,02,000 ₹2,02,000 | 1,42,000 ₹1,42,000 Lowest |
| 10.00 | Online Monitoring COD and BoD Sensors calibration and sercie work. New Monitoring display unit fixing work -1 Nos (As Per Quotation) | 1 | Nos | 1,40,750 ₹1,40,750 | 1,00,750 ₹1,00,750 Lowest |
Tender Value
Refer Docs
EMD Value
₹7,800
Closing Date
30 Jul 2025, 3:00 pmClosed
Executive Officer
Periyanaickenpalayam Town Panchayat Coimbatore
Maintenance Work in FSTP in Periyanaickenpalayam Town Panchayat.
2025_DTP_586106_1
166 - 2
Open Tender
Civil Works
Works
15 days
Periyanaickenpalayam
As per Tender Conditions
2 documents required · 2 mandatory
₹0
₹7,800
Yes
13 Mar 2026
26 Jul 2025
30 Jul 2025
26 Jul 2025
30 Jul 2025
26 Jul 2025
26 Jul 2025 - 30 Jul 2025
Amount
Diesel Generator -New Chemicial earth bit installation DG Side Cable gland with cable termination doubleearth connecting DG alternator and beld side cleaning work DG New Battery replacement & Dianomo Motor power supply checking oil level, coolant level (Quality of character) (As Per Quotation)
CABLE LAYING (New & Old Cables) 4sqmm 4 core felxable cable front gate to securtiy gate (32 meter) 4sq mm 4core Ar aluminum cable office rest room to office panel side -24 meter. 4sq mm 4 core Alu-Ar Cable (CCTV room to DB) laying and termination with cable dressing work 10 sqmm 4 core Alu-Ar cable office panel to MBBR Panel (46 Meter) (As Per Quotation)
Light fitting Fixed & Termination work: focus light 100w repalcement work (3 Nos) Security gate 20w tube lights fitting fixed work -2 Nos, Name Board light power supply given work & 2 pole MCB box fixing work back side rest room and office rest room power supply and 2 way MCB Box fixing work (As Per Quotation)
CONTROL PANEL - 32A 3p MCB replacement work 6 Nos 63A p MCB repalcement work 2 Nos New dewatering pump OLR repalcement work all control panels dressing work new de-watering 3 phase pump power supply given work (As Per Quotation)
Supply and fixing New three phase pump 750 CW 1.0HP 2 Nos (As Per Quotation)
Supply and delivery 12V 100 ah Battery (As Per Quotation)
New Ar.Cu. cable & electrical material (As Per Quotation)
Battery vehicle Old Battery repalement and New Battery Installation work -5 Nos (As Per Quotation)
Online Monitoring Ph sensor, TSS Sensor, replacement and Installation -1 Nos (As Per Quotation)
Online Monitoring COD and BoD Sensors calibration and sercie work. New Monitoring display unit fixing work -1 Nos (As Per Quotation)
John Arthor (BID ID -1416291)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .