Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-AOC | ₹6.5 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹9.9 LRejected-Finance | ₹9.9 L | L2 | Rejected-Finance Above Rate |
| Sl No | Description | Qty | Unit | John Arthor L2 | vignesh L1 |
|---|---|---|---|---|---|
| 1.00 | Diesel Generator -New Chemicial earth bit installation DG Side Cable gland with cable termination doubleearth connecting DG alternator and beld side cleaning work DG New Battery replacement & Dianomo Motor power supply checking oil level, coolant level (Quality of character) (As Per Quotation) | 1 | Nos | 60,500 ₹60,500 | 40,620 ₹40,620 |
| 2.00 | CABLE LAYING (New & Old Cables) 4sqmm 4 core felxable cable front gate to securtiy gate (32 meter) 4sq mm 4core Ar aluminum cable office rest room to office panel side -24 meter. 4sq mm 4 core Alu-Ar Cable (CCTV room to DB) laying and termination with cable dressing work 10 sqmm 4 core Alu-Ar cable office panel to MBBR Panel (46 Meter) (As Per Quotation) | 1 | Nos | 58,730 ₹58,730 | 48,120 ₹48,120 |
| 3.00 | Light fitting Fixed & Termination work: focus light 100w repalcement work (3 Nos) Security gate 20w tube lights fitting fixed work -2 Nos, Name Board light power supply given work & 2 pole MCB box fixing work back side rest room and office rest room power supply and 2 way MCB Box fixing work (As Per Quotation) | 1 | Nos | 44,500 ₹44,500 | 24,260 ₹24,260 |
| 4.00 | CONTROL PANEL - 32A 3p MCB replacement work 6 Nos 63A p MCB repalcement work 2 Nos New dewatering pump OLR repalcement work all control panels dressing work new de-watering 3 phase pump power supply given work (As Per Quotation) | 1 | Nos | 40,000 ₹40,000 | 20,000 ₹20,000 |
| 5.00 | Supply and fixing New three phase pump 750 CW 1.0HP 2 Nos (As Per Quotation) | 1 | Nos | 61,200 ₹61,200 | 41,200 ₹41,200 |
| 6.00 | Supply and delivery 12V 100 ah Battery (As Per Quotation) | 1 | Nos | 32,600 ₹32,600 | 12,600 ₹12,600 |
| 7.00 | New Ar.Cu. cable & electrical material (As Per Quotation) | 1 | Nos | 2,12,000 ₹2.1 L | 1,12,000 ₹1.1 L |
| 8.00 | Battery vehicle Old Battery repalement and New Battery Installation work -5 Nos (As Per Quotation) | 1 | Nos | 1,40,500 ₹1.4 L | 1,12,500 ₹1.1 L |
| 9.00 | Online Monitoring Ph sensor, TSS Sensor, replacement and Installation -1 Nos (As Per Quotation) | 1 | Nos | 2,02,000 ₹2.0 L | 1,42,000 ₹1.4 L |
| 10.00 | Online Monitoring COD and BoD Sensors calibration and sercie work. New Monitoring display unit fixing work -1 Nos (As Per Quotation) | 1 | Nos | 1,40,750 ₹1.4 L | 1,00,750 ₹1.0 L |
Tender Value
Refer Docs
EMD Value
₹7,800
Closing Date
30 Jul 2025, 3:00 pmClosed
Executive Officer
Periyanaickenpalayam Town Panchayat Coimbatore
Maintenance Work in FSTP in Periyanaickenpalayam Town Panchayat.
2025_DTP_586106_1
166 - 2
Open Tender
Civil Works
15 days
Periyanaickenpalayam
As per Tender Conditions
2 documents required · 2 mandatory
₹0
₹7,800
Yes
13 Mar 2026
26 Jul 2025
30 Jul 2025
26 Jul 2025
30 Jul 2025
26 Jul 2025
26 Jul 2025 - 30 Jul 2025
Amount
Diesel Generator -New Chemicial earth bit installation DG Side Cable gland with cable termination doubleearth connecting DG alternator and beld side cleaning work DG New Battery replacement & Dianomo Motor power supply checking oil level, coolant level (Quality of character) (As Per Quotation)
CABLE LAYING (New & Old Cables) 4sqmm 4 core felxable cable front gate to securtiy gate (32 meter) 4sq mm 4core Ar aluminum cable office rest room to office panel side -24 meter. 4sq mm 4 core Alu-Ar Cable (CCTV room to DB) laying and termination with cable dressing work 10 sqmm 4 core Alu-Ar cable office panel to MBBR Panel (46 Meter) (As Per Quotation)
Light fitting Fixed & Termination work: focus light 100w repalcement work (3 Nos) Security gate 20w tube lights fitting fixed work -2 Nos, Name Board light power supply given work & 2 pole MCB box fixing work back side rest room and office rest room power supply and 2 way MCB Box fixing work (As Per Quotation)
CONTROL PANEL - 32A 3p MCB replacement work 6 Nos 63A p MCB repalcement work 2 Nos New dewatering pump OLR repalcement work all control panels dressing work new de-watering 3 phase pump power supply given work (As Per Quotation)
Supply and fixing New three phase pump 750 CW 1.0HP 2 Nos (As Per Quotation)
Supply and delivery 12V 100 ah Battery (As Per Quotation)
New Ar.Cu. cable & electrical material (As Per Quotation)
Battery vehicle Old Battery repalement and New Battery Installation work -5 Nos (As Per Quotation)
Online Monitoring Ph sensor, TSS Sensor, replacement and Installation -1 Nos (As Per Quotation)
Online Monitoring COD and BoD Sensors calibration and sercie work. New Monitoring display unit fixing work -1 Nos (As Per Quotation)
John Arthor (BID ID -1416291)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid