| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-Finance | ₹1.7 L | L1 | Accepted-Finance As per norms of UPPTCL |
| 2 | L2₹1.7 LAccepted-Finance | ₹1.7 L | L2 | Accepted-Finance As per norms of UPPTCL |
| 3 | L3₹1.9 LAccepted-Finance 319 A MEERAPUR PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | 211001 | ₹1.9 L | L3 | Accepted-Finance As per norms of UPPTCL |
| Sl No | Description | Qty | Unit | SWITCHGEAR AND TRANSFORMER CARE CENTRE L1 | S N ENTERPRISES L2 | R.S.ASSOCIATE L3 |
|---|---|---|---|---|---|---|
| 1.00Work for Replacement of Damaged 132KV SF-6 Circuit breaker of 132KV Sitapur bay by new 132KV Circuit breaker and rectification of SF-6 Gas leakage in 132KV Bus Coupler Circuit breaker at 132KV Sub-Station Laharpur alongwith all associated works under ETD, Sitapur:- | ||||||
| 1.01 | Safe loading of 145KV CB on suitable vehicle with the help of Hyrdra/Crane at 132KV Sub-Station, Biswan including shifting of equipment. | 1 | Job | 11,750 ₹11,750 | 11,900 ₹11,900 | 11,900 ₹11,900 |
| 1.02 | Safe carriage of 145KV Circuit breaker with auxiliary structure from 132KV Sub-Station, Biswan to 132KV Sub-Station, Laharpur (Approx. distance 30 Km.) transportation vehicle etc. for satisfactory completion of the job. | 1 | Job | 10,690 ₹10,690 | 11,000 ₹11,000 | 10,770 ₹10,770 |
| 1.03 | Safe unloading of 145KV CB on suitable vehicle with the help of Hydra/Crane at 132KV Sub-Station, Laharpur including shifting of equipment. | 1 | Job | 11,750 ₹11,750 | 11,900 ₹11,900 | 11,900 ₹11,900 |
| 1.04 | Dismantling of 132KV CB of 132KV Sitapur bay at 132KV Sub-Station, Laharpur by opening of jumpers, earthing and cable connections and shifting of CB up to designated place switchyard (Approx. 50 Mtr.) | 1 | Job | 14,710 ₹14,710 | 15,000 ₹15,000 | 14,900 ₹14,900 |
| 1.05 | Erection of new 132 KV Circuit breaker in 132KV Sitapur bay at 132KV Sub-Station, Laharpur including shifting of CB store point at site of work, making all jumpers, electrical connection and earthing and other associated work to complete the job as per technical specification. | 1 | Job | 24,480 ₹24,480 | 25,000 ₹25,000 | 24,500 ₹24,500 |
| 1.06 | Commissioning of new 132V CB in 132KV Sitapur bay at 132KV Sub-Station, Laharpur as per technical specification. Job include proper alignment of CB filling of SF-6 Gas after creating cacuum (if required) and other associated work to complete the job in all respect. | 1 | Job | 29,900 ₹29,900 | 30,000 ₹30,000 | 40,000 ₹40,000 |
| 1.07 | Supply of SF-6 Gas suitable for SF-6 Circuit breaker at 132KV Sub-Station, Laharpur. | 6 | Kg. | 1,315 ₹7,890 | 1,380 ₹8,280 | 1,400 ₹8,400 |
| 1.08 | Rectification of SF-6 Gas leakege from poles of 145KV SF-6 Siemens make circuit breaker of 132KV Bus coupler bay at 132KV Sub-Station, Laharpur. Work consists of (a) to identify SF-6 Gas leakege with the help of SF-6 gas leakage detector and pole non-operating problem (b) Dismantling of identified pole from breaker structure with the help of Hydra (C) Dismantling of all components of poles and replace all "O" rings/Gas kit by applying Anobond 661 (Gas seal out) after thorough cleaning of part. (d) Replacement of pull rod for pole moving contact. (e) Re-assemble all parts of the pole. (f) Apply vaccum and check no loss of vacuum (g) Erection of poles on structure using Hydra (h) Filling of SF-6 Gas upto satisfied value. (i) Check satisfactory close/Trip operation both by local and remote. | 1 | No. | 57,500 ₹57,500 | 59,000 ₹59,000 | 70,000 ₹70,000 |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
21 Jan 2026, 12:00 pmClosed
Executive Engineer
Electricity Transmission Division, UPPTCL, 220KV S/S Hussainganj, Sitapur.
work
2026_UPTCL_1106263_1
Very Short Term E-Tender No. 13/ETD(S)/2025-26
Open Tender
Electrical Works
15 days
Laharpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
A/C No. 10906917956, IFSC Code No. SBIN0000720
₹2,000
21 Jan 2026
14 Jan 2026
21 Jan 2026
14 Jan 2026
21 Jan 2026
14 Jan 2026
14 Jan 2026 - 21 Jan 2026
Work for Replacement of Damaged 132KV SF-6 Circuit breaker of 132KV Sitapur bay by new 132KV Circuit breaker and rectification of SF-6 Gas leakage in 132KV Bus Coupler Circuit breaker at 132KV Sub-Station Laharpur alongwith all associated works under ETD, Sitapur:-
Safe loading of 145KV CB on suitable vehicle with the help of Hyrdra/Crane at 132KV Sub-Station, Biswan including shifting of equipment.
Safe carriage of 145KV Circuit breaker with auxiliary structure from 132KV Sub-Station, Biswan to 132KV Sub-Station, Laharpur (Approx. distance 30 Km.) transportation vehicle etc. for satisfactory completion of the job.
Safe unloading of 145KV CB on suitable vehicle with the help of Hydra/Crane at 132KV Sub-Station, Laharpur including shifting of equipment.
Dismantling of 132KV CB of 132KV Sitapur bay at 132KV Sub-Station, Laharpur by opening of jumpers, earthing and cable connections and shifting of CB up to designated place switchyard (Approx. 50 Mtr.)
Erection of new 132 KV Circuit breaker in 132KV Sitapur bay at 132KV Sub-Station, Laharpur including shifting of CB store point at site of work, making all jumpers, electrical connection and earthing and other associated work to complete the job as per technical specification.
Commissioning of new 132V CB in 132KV Sitapur bay at 132KV Sub-Station, Laharpur as per technical specification. Job include proper alignment of CB filling of SF-6 Gas after creating cacuum (if required) and other associated work to complete the job in all respect.
Supply of SF-6 Gas suitable for SF-6 Circuit breaker at 132KV Sub-Station, Laharpur.
Rectification of SF-6 Gas leakege from poles of 145KV SF-6 Siemens make circuit breaker of 132KV Bus coupler bay at 132KV Sub-Station, Laharpur. Work consists of (a) to identify SF-6 Gas leakege with the help of SF-6 gas leakage detector and pole non-operating problem (b) Dismantling of identified pole from breaker structure with the help of Hydra (C) Dismantling of all components of poles and replace all "O" rings/Gas kit by applying Anobond 661 (Gas seal out) after thorough cleaning of part. (d) Replacement of pull rod for pole moving contact. (e) Re-assemble all parts of the pole. (f) Apply vaccum and check no loss of vacuum (g) Erection of poles on structure using Hydra (h) Filling of SF-6 Gas upto satisfied value. (i) Check satisfactory close/Trip operation both by local and remote.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
Tenderdoc.pdf
Tender Documents • 0.32 MB
BOQ_2041024.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid