| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.1 LAccepted-AOC 59 INDU HOUSE RAMA ROAD INDUSTRIAL AREA 110015 | DELHI | WEST DELHI | DELHI | 110015 | L1 | Accepted-AOC L1 | |
| 2 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹28.2 L
EMD Value
₹56,325
Closing Date
24 Apr 2023, 5:30 pmClosed
Raja Nagender Singh
NIRMAN SADAN , 4TH FLOOR, CIVIL LINES , PWD B and R (Elect.)GURUGRAM
Providing MG and allied works for connecting 3 nos. of PSA in Sh. Atal Bihari Vajpayee Govt. Medical College at Village Chhainsa in District Faridabad
2023_HRY_258182_2
20234A9EC100 B643 4455 9310 0BCA6DD219B7664BAR
Open Tender
Electrical Works
Works
90 days
Faridabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹56,325
Yes
8 Nov 2023
31 Mar 2023
25 Apr 2023
31 Mar 2023
24 Apr 2023
31 Mar 2023
Amount
Supply, installation, testing & commissioning of MEDICAL Grade BS EN: 13348 Kite Marked COPPER PIPE complete with all labour & material required to complete the job in all respect upto the entire satisfaction of Engineer - in - Charge. Make : Max Flow/ Rajco/ Cubex/ Lawton/ Metal Gem 54mm
Supply, installation, testing & commissioning of Oxygen control regulating system is required to regulate the oxygen pressure of 17 bar so that required pressure should be delivered. The oxygen is typically delivered at pressures of 4.2 bar for supply to the hospital system. The regulating system should comprise of Copper Pipe, Inlet Connection, Line Presure Gauges, Isolation Valve. All components should be mounted on a powder coated steel back plate for simple installation. The regulating system is designed to have tight shut off isolation valves and blow out proof stem for protection against pressure surges. The copper stub pipe assemblies are manufactured from medical gas copper tube compliant to BS EN 13348 and are factory soldered to brass flat face seal housings chemically cleaned and degreased. The copper pipe stubs are of sufficient length to enable brazing directly to the medical gas pipeline system utilising flux less brazing . Nitrile o-ring seals ensuring 100% gas tight connections. All pressure reducing station assemblies should have following features: - Fully pressure tested for valve tightness and leakage prior to packing and delivery. - All station assemblies are batch numbered for traceability prior to packing and delivery. - Each station assembly is individually end capped and sealed in a clear polythene bag to maintain cleanliness other specifications as per DNIT in Pdf.
Supply, installation, testing & commissioning of MEDICAL LINE VALVE, AS PER CE CERTIFIED / UL LISTED AS PER TECHNICAL SPECIFICATIONS complete with all labour & material required to complete the job in all respect upto the entire satisfaction of Engineer - in - Charge. Make : RB/ RN/ Audco/Cim 54mmOD
Supply, installation, testing & commissioning of The Control Panels should be intended to supply oxygen pipeline installations complying with prevailing standards. The Control Panels should be available in a duplex configuration, with one standby and one duty regulator set. The Control panel to be designed to accept a supply of gaseous oxygen from the Liquid Oxygen Tank VIE at (10.5) bar or from the standby manifold at 850 kPa (8.5 bar) and to reduce the pressure to a nominal 420 kPa (4.2 bar) pipeline distribution system pressure. The Control panels should be designed to regulate line pressure based on two pipe sizes: Ø 28mm sized or more for different flow rate capacities. FEATURES All components degreased for oxygen use Quarter turn ball valves die cast brass alloy body with nitrile seals Non relieving Regulators 28 bar rated High lift brass safety relief valve, BSP threads Gauge monitoring 0 to 11 bar bottom entry connection In line filtration Flow rate 28mm - 3,500 l/min other specifications as per DNIT in Pdf.
Annual Operation & maintenance Comprehensive maintenance after one year free warranty period of MGPS & OT’s system of all the machinery equipment’s installed in the building including Sunday & holiday (24x7x365) during five year as under including all labour & material (including consumables) i) Only operation during free maintenance period. ii) Operation & comprehensive maintenance after free warranty period. 1st year – during free maintenance period. Operation cost only (Rate in Figure 2 Percent)
2nd year – Comprehensive maintenance & operation
3rd year – Comprehensive maintenance & operation
4th year – Comprehensive maintenance & operation
5th year – Comprehensive maintenance & operation
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .