Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.9 LAdmitted-Finance | -41.02% | ₹12.9 L | L1 | Admitted-Finance |
| 2 | L2₹14.5 L+₹1.6 L (12.6%)Admitted-Finance | -33.60% | ₹14.5 L+₹1.6 L (12.6%) | L2 | Admitted-Finance |
| 3 | L3₹15.7 L+₹2.9 L (22.3%)Admitted-Finance | -27.89% | ₹15.7 L+₹2.9 L (22.3%) | L3 | Admitted-Finance |
| 4 | L4₹16.8 L+₹4.0 L (30.9%)Admitted-Finance | -22.82% | ₹16.8 L+₹4.0 L (30.9%) | L4 | Admitted-Finance |
| 5 | L5₹17.0 L+₹4.1 L (32.1%)Admitted-Finance | -22.11% | ₹17.0 L+₹4.1 L (32.1%) | L5 | Admitted-Finance |
Tender Value
₹21.8 L
EMD Value
₹43,620
Closing Date
23 Apr 2026, 6:00 pmClosed
EO
MUNICIPAL BOARD BASERI
TIMASIYA PULIYA WALE RASTE ME SAIFTY WALL NIRMAN KARYA
2026_DLB_548999_1
17-BASERI
Open Tender
Civil Works
Percentage
60 days
BASERI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EO MUNICIPAL BOARD BASERI/MD RISL JAIPUR
₹43,620
Yes
13 May 2026
28 Mar 2026
24 Apr 2026
28 Mar 2026
23 Apr 2026
28 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m | |||||
| 2Random rubble dry stone Kharanja (soling) under floor. | |||||
| 3Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | |||||
| 4Random rubble masonry with hard stone in foundation and plinth Cement mortar 1:6 (1 cement : 6 coarse sand) Ist Step | |||||
| 4.1 | 2nd step | - | Nos | - | - |
| 4.2 | 3rd step | - | cum | - | - |
| 5Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:4 (1 cement : 4 fine/ coarse sand) | |||||
| 6Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_978684.xls
BOQ • 0.34 MB
corr23.pdf
PDF • 0.54 MB
doc.pdf
PDF • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .