Loading…
Loading…
| # | Company | Amount |
|---|---|---|
| 1 | ₹11.5 L |
Tender Value
₹11.5 L
EMD Value
₹23,100
Closing Date
6 Apr 2026, 2:00 pmClosed
Prof. Dr. S. P. Singh
Registrar
NYAYA NAGAR, MITHAPUR, PATNA
Prof. Dr. S.P. Singh
Registrar
Supply and Fixing of Fencing Jali Work around Basketball Court and Volleyball Court at CNLU Campus.
127938
NIT No.: 101/2025-26
Open Tender
GENERAL
Gaya
• Name of BIDDER
• Name of the Firm/Company
• Address of the firm/Company
• PAN NO
• GST NO
• Contact Details
• Email-ID
GENERAL
ITEM RATE
L1
1
8 documents required · 8 mandatory
₹2,500
Processing Fee: 590
₹23,100
Office of Registrar's Chamber of CNLU
11 May 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
30 Mar 2026
Chanakya National Law University Nyaya Nagar, Mithapur, Patna-800001
Supply and Fixing of Fencing Jali Work around Basketball Court and Volleyball Court
The detail Estimate of works are mentioned here under as per SOR-2022
Sl No SOR Particular of items Qty. Unit Rate (In Rs.) Amount (In Rs.)
1 2.6 Earth work in excavation over areas ( exceeding 30 cm in depth. 1.5 m in width as well es 10 sqm on plan) including disposal of excavated earth , lead upto 50 m and lift upto 1.5 m; disposed earth to be levelled and neatly dressed. 0.00
2.6.1 AH Kinds of soil 0.00
2 11.72 Providing designation 100 A one brick flat soling joints filled with local sand including cost of watering, taxes, royalty all complete as per building specification and direction of E/l, 0.00
3 5.23 Extra for RCC work in superstructure above floor V level for each four floors or part thereof.
4 5.22 Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
5.22.7B Thermo-Mechanically Treated bars TMTC-500-10mm dia.
5 16.19 Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete. 0.00
6 13.82 Painting with ready mixed paint of approved brand and manufacture in all shades to give an even shade:
13.82.1 New steel work (two or more coats)
7 16.15.2 Welded steel wire fabric of required width having rectangular mesh painted with two or more coats of enamel paint of approved shade over a coat of primer (Priming & Painting to be paid for separately). 2184.00 Kg 74.40 162489.60
Carriage of Materials 0.00
Course Sand 10.00 Cum 1080.00 10800.00
Stone Chips 20.00 Cum 259.46 5189.20
Total Amount 1,094,942.36
Add 6% GST, beyond 12% GST (Multiplying Factor - 0.0536) 58,688.91
Grand Total 1,153,631.27
Rupees Ten Lakhs Eighty Six Thousand Eight Hundred Fifty Eight.
Mukesh Kumar Prof. (Dr.) S. P. Singh
Civil Engineer Registrar
NIT No. Description of Works Estimated Cost Rate Quoted on Estimated Cost Above / Below in Percentage
Chanakya National Law University Nyaya Nagar, Mithapur, Patna-800001
Supply and Fixing of Fencing Jali Work around Basketball Court and Volleyball Court
The detail Estimate of works are mentioned here under as per SOR-2022
Sl No SOR Particular of items Qty. Unit Rate (In Rs.) Amount (In Rs.)
1 2.6 Earth work in excavation over areas ( exceeding 30 cm in depth. 1.5 m in width as well es 10 sqm on plan) including disposal of excavated earth , lead upto 50 m and lift upto 1.5 m; disposed earth to be levelled and neatly dressed. 0.00
2.6.1 AH Kinds of soil 0.00
2 11.72 Providing designation 100 A one brick flat soling joints filled with local sand including cost of watering, taxes, royalty all complete as per building specification and direction of E/l, 0.00
3 5.23 Extra for RCC work in superstructure above floor V level for each four floors or part thereof.
4 5.22 Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
5.22.7B Thermo-Mechanically Treated bars TMTC-500-10mm dia.
5 16.19 Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete. 0.00
6 13.82 Painting with ready mixed paint of approved brand and manufacture in all shades to give an even shade:
13.82.1 New steel work (two or more coats)
7 16.15.2 Welded steel wire fabric of required width having rectangular mesh painted with two or more coats of enamel paint of approved shade over a coat of primer (Priming & Painting to be paid for separately). 2184.00 Kg 74.40 162489.60
Carriage of Materials 0.00
Course Sand 10.00 Cum 1080.00 10800.00
Stone Chips 20.00 Cum 259.46 5189.20
Total Amount 1,094,942.36
Add 6% GST, beyond 12% GST (Multiplying Factor - 0.0536) 58,688.91
Grand Total 1,153,631.27
Rupees Ten Lakhs Eighty Six Thousand Eight Hundred Fifty Eight.
Mukesh Kumar Prof. (Dr.) S. P. Singh
Civil Engineer Registrar
NIT No. Description of Works Estimated Cost Rate Quoted on Estimated Cost Above / Below in Percentage
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT 101- for Fencing Jali Work.pdf
NIT • 0.27 MB
Estimate & BOQ.xlsx
NIT • 0.05 MB
Estimate & BOQ.xlsx
NIT • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .