| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.3 LAdmitted-Finance | -6.63% | ₹10.3 L | L1 | Admitted-Finance |
| 2 | L2₹11.5 L+₹1.2 L (11.4%)Admitted-Finance ASSOLNA SOUTH GOA | SOUTH GOA | GOA | 403802 | +4.00% | ₹11.5 L+₹1.2 L (11.4%) | L2 | Admitted-Finance |
| 3 | L3₹11.6 L+₹1.3 L (12.5%)Admitted-Finance H NO G 675 2 GAULEBHAT CHIMBEL TISWADI GOA | +5.00% | ₹11.6 L+₹1.3 L (12.5%) | L3 | Admitted-Finance |
Tender Value
₹11.1 L
EMD Value
₹22,140
Closing Date
9 Sept 2026, 12:00 pmClosed
Executive Engineer
2nd Floor, Gomantak Maratha Samaj, Dayanand Smruti Panaji Goa
Re-construction of existing shed and Replacement of existing floor tiles for Bal Gajanan mandal at Mandur, V.P. Azzosim Mandur in St. Lawrence Z. P. Constituency.
2026_ZP_31600_1
NGZP/05/2026-27/46/638/L28
Open Tender
Civil Works
Percentage
120 days
North Goa Zilla Panchayat
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹22,140
11 Sept 2026
4 Sept 2026
9 Sept 2026
4 Sept 2026
9 Sept 2026
4 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the tile work in floors and roofs laid in cement including stacking of materials within 50 meters lead for thickness of tiles 10mm to 25mm. | 90 | M2 | 330 | ₹29,700 |
| 2Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : | |||||
| 2.01 | All kinds of soil | 27.9 | M3 | 286 | ₹7,979.4 |
| 3Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | |||||
| 3.01 | All kinds of soil | 12 | M3 | 291 | ₹3,492 |
| 4 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 21 | M3 | 2,211 | ₹46,431 |
| 5Providing & laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded granitic or basaltic stone aggrt. 40 mm. nominal size) excluding cost of centering, shuttering and finishing in: | |||||
| 5.01 | All works upto plinth level | 10.5 | M3 | 6,192 | ₹65,016 |
| 6Kotah stone slab flooring over 20 mm (average) thick base laid over & jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing & complete with base of cement mortar 1:4 (1 cement : 4 coarse sand) | |||||
| 6.01 | 20 mm thick. | 90 | M2 | 1,581 | ₹1,42,290 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_31984.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .