Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
31 Jan 2026, 12:00 pmClosed
EECIVIL),BR-X
28, PRINCE ANWAR SHAH ROAD, KOLKATA-700033
MODIFICATION OF FOOTPATH NEAR 148, 73,4/8 REGENT ESTATE ETC IN WARD -096,BR-X (APAS ID- APAS/01/150/227/0001
2026_KMC_990539_1
X/096/58/2025-2026/APAS
Open Tender
CIVIL WORKS
45 days
WARD- 96
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6,000
28 Mar 2026
20 Jan 2026
3 Feb 2026
20 Jan 2026
31 Jan 2026
20 Jan 2026
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm.
BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion
Laying of interlocking Paver Blocks as per approved design over 20-30mm th medium yellow sand bed with true to line,lavelling,proper compaction with vibrator etc. with jointing with kerb/edge should be made with Cement Concrete (1:2:4)etc. as per the direction of the Engineer-in-charge and including cost of materials,labour etc. complete
BLOCK USED AS A DEVICE FOR KEEPING MINIMUM JOINT GAP IN BETWEEN THE PAVING BLOCKS, AS PER CL NO 3.26 OF IS:15658) AND OF SPECIFIED SIZE AND SHAPE WITH ASPECT RATIO ( THE RATIO OF LENGTH TO THICKNESS OF APAVER BLOCK AS PER TABLE 2 OF IS: AS PER TABLE 1 OF IRC SP 63(2018) OR ELSE AS MENTIONED15658 , ON THE PREPARED BASE COURSE OF SPECIFIED CBRSTRENGTH/BREAKING LOAD AS PER ANNEXTURE G OF IS:15658 WITH FLEXTURAL IN DESIGN AND DRAWING WITH A CUSHION OF COMPACTED IN DESIGN AND DRAWING WITH A CUSHION OF COMPACTED BEDDING SAND AS PER CLAUSE 6.5.1 OF IRC SP-63) AND FILLING UP YHR GAPS IN BETWEEN PAVER BLOCKS WITH JOINTFILLING SAND ( THE GRADING OF THE JOINT FILLING SAND WILL BE AS PER CLAUSE 6.5.2 OF IRC SP 63 ) AND COMPLETING THE EDGES WITH CUT BLOCKS AS PER CLAUSE 6.5.2 OF IRC SP 63) AND WITH PROPER CONFINEMENT OF BEDDING AND JOINT FILLING SAND, COMPACTION, LEVELLING AND FILLING UP THE EDGE GAP. 50 MM THICK (II) COLOURED DECORATIVE
Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303])
Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303])
Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2).a) Vertical Kerb ( Ref :Rate based on PWD Current SOR. [PWD(B) 2017, p-303 & 3rd corri. Addea dtd-04.06.2018. P-52 ])
Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2).b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B) 2017, p-303 & 3rd corri. Addea dtd-04.06.2018. P-52 ])
Raising cover and frame of Catch Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils.
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface :With super gloss (hi-gloss) -(ii) Two coats (white in shade)
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(a) On timber or plastered surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white)
Estimated amount
Add: 9%SGST
Add: 9%CGST
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.66 MB
civil.pdf
Additional Documents • 4.88 MB
tenderform.pdf
Tender Documents • 0.29 MB
BOQ_2421499.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid