Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹7.6 L+₹18,619.52 (2.52%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹7.7 L+₹28,868.57 (3.91%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC | ||
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹9.8 L
EMD Value
₹19,650
Closing Date
3 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer PWD RNB DH PORA
Executive Engineer PWD RNB DH PORA
Development of Internal premises of NTPHC DKMARG
2026_PWDJK_329319_1
73 Of RnB/D.H. Pora/2026-27/4828-36 Dtd 24/10/2026
Open Tender
Civil Works
Percentage
120 days
Executive Engineer PWD RNB DH PORA
Please refer Tender documents.
5 documents required · 5 mandatory
₹600
Acc no 0470010200000099
₹19,650
6 Nov 2026
24 Oct 2026
4 Nov 2026
25 Oct 2026
3 Nov 2026
25 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of all kinds of soil by mechanical means in trenches for foundations (not exceeding 1.5 m in width) and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms, all lifts including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 35.95 | cum | 225.18 | ₹8,095.15 |
| 2 | Providing and laying stone soling duly hand packed in maintaning level and section including ramming and carriage of the same up to site of work complete. | 3.24 | Cum | 762.71 | ₹2,471.19 |
| 3 | Providing and laying in position cement concrete 1:4:8 (1
Cement:4 Corase sand: 8 graded stone aggregate 40 mm
nominal size ) including curing but excluding the
cost of centring and shuttering. All work upto plinth level | 2.7 | Cum | 4,527.46 | ₹12,224.14 |
| 4 | Providing and laying in position reinforced cement concrete 1:1.5:3 (1 Cement:1.5 Corase sand: 3 grade stone aggregate 20 mm nominal size) including curing but excluding the
cost of centring, shuttering,finishing and reinforcement. All work upto plinth level | 4.05 | Cum | 6,828.05 | ₹27,653.61 |
| 5 | Providing and laying in position cement concrete 1:2:4 (1
Cement:2 Corase sand: 4 grade stone aggregate 20 mm
nominal size ) including curing but excluding the
cost of centring and shuttering. All work upto plinth level | 20.25 | Cum | 5,778.51 | ₹1,17,014.79 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 126 | sqm | 251.03 | ₹31,630.28 |
| 7 | Structural steel work in built up sections, including cutting, welding, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 777.47 | kg | 105.9 | ₹82,332.52 |
| 8 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in- charge. Made of G.I. wire of dia 4 mm | 109.8 | sqm | 710.03 | ₹77,961.73 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more. | 202.5 | kg | 108.01 | ₹21,871.62 |
| 10Carriage of materials by Mechanical transport, from source to site of work including loading,unloading and stacking complete | |||||
stage.html
html • 0.03 MB
finance_1116026.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
BOQ_1116026.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .