Tender Value
₹7.3 Cr
EMD Value
₹14.7 L
Closing Date
17 Aug 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
GENERAL
24 conditions · 5 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
(a) Attested Certificates(s) issued by Executive or Nominated Authority of the government Departments or Semi-Government/Public Sector Undertakings for the value of the work done for them during the qualifying period including current financial year certifying the bill amounts paid Agreement-wise and Date-wise or attested photo copy of such certificate. Such certificates will be accepted only from Govt. / Govt. bodies / PSUs authorities. Certificates issued by Private Bodies will not be considered.
NOTE: (i) Financial Year shall normally, be reckoned as 1st April to 31st March of the Next Year. However, for Turnover Criteria, the Financial Year as applicable to the Company /Tenderer is to be considered, if it defers from the above. (ii) Current Financial year is reckoned as the incomplete Financial year in which the date of tender submission falls. (iii) Chartered Accountant statements duly indicating yearly receipts will not be considered until and unless backed by Audited Balance Sheets or Provisional Balance sheet. (iv) (v) If the tender is not accompanied by the certificate(s) in support of financial eligibility as above, the tender shall be rejected. No post-tender correspondence will be entertained.
If JV firms are allowed to participate; Financial eligibility of the JV Firm shall be adjudged based on satisfactory fulfillment of the Para No.17.15.2 of J.V guide lines of IRSGCC April - 2022 [with up to date correction slip].
Definition of Similar Nature of work : (i) (a)Any Civil Engineering work having RCC component (Value of component in tender Rs. 2,64,69,996/-) and b. steel structure work (Value of component in tender Rs. 2,64,25,333/-). & (ii) Any Civil Engineering work involving Building work /Concrete work. (Value of component in tender Rs. 2,05,36,873/-). Tenderer should have valid electrical contractor's license in his/their name or he should give an undertaking that he will engage capable agencies for electrical work who has the valid electrical contractor's license in his/their name (Note: Single/ Separate completed work of minimum required value shall be considered for fulfilment of technical eligibility criteria for above three different components as per para 10.1 of GCC 2022).
78 conditions · 29 needing a document upload
Uploading of Proforma -18 attached with Tender document (Certificate signed by Tenderer and Chartered Accountant), w he n balance sheet for the first previous year is yet to be prepared/ audited.
Proforma-16 for self-certificate in regard to meeting the Minimum Local Content requirements as per Make in India Policy for Procurement order value less than of Rs. 10 Crores. OR Proforma-17 for Certificate from the statutory auditor or cost auditor of the company (in the case of companies) or from a practicing cost accountant or practicing chartered accountant (in respect of suppliers other than companies) giving the percentage of Local Content as per Make in India Policy for Procurement Order Value more than Rs.10 Crores. Provisions of Make in India Policy 2017 (revised during 2024 vide Department for Promotion of Industry and Trade, Ministry of Commerce and Industry's letter No. P-45021/2/2017-PP (BE-II)-Part(4)Vol.II dated 19.07.2024) issued by Govt. of India, as amended from time to time, shall be followed for consideration of tenders.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
(i) The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be. (ii) documents shall be submitted according to clause 14 of IRGCC 2022:
This tender complies with PUBLIC PROCUREMENT POLICY ORDER-2017 dated 15.06.2017. Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions. Provisions of Make in India Policy 2017 issued by Govt. of India, as amended from time to time, shall be followed for consideration of tenders.
The General Conditions of Contract governing the performance of the works covered by this tender are the Indian Railway Standard General Conditions of Contract [IRSGCC] as amended from time to time up to date. A soft copy of the Indian Railway Standard General conditions of Contract is uploaded in the attached documents to the tender for reference. Hard copy of IRSGCC (with up-to-date correction slip) may be perused in the office of the Principal Chief Engineer Officer/ South Western Railway / Hubballi - 580020. The tenderer/s is/are deemed to have kept himself/themselves fully Informed of the provisions of the IRS General conditions of Contract including all corrections and Amendments issued up to date while submission of offer and any claim that he/they is/are not aware of any amendment or correction slip to the IRSGCC shall not be entertained.
STUDY OF DRAWINGS AND LOCAL CONDITIONS: The drawings for the works can be seen in the office of the General Manager/Divisional Railway Manager. It should be noted that these drawings are meant for general guidance only and Railway may suitably modify them during the execution of work according to the circumstances without making the Railways liable for any claims on account of such changes. If there is any variation between the description in the tender and the detailed plans, the Engineer-in-Charge will operate the correct description and his decision is final and binding on the tenderer/ Contractor. The Tenderer/Contractor is required to inspect the sites of works and acquaint himself with the site conditions, availability of approaches for transporting of men and materials, space and other factors relating to the works, availability of labour, electricity and water, etc., before quoting his rates. The extent of lead and lift involved in the execution of works and any difficulties involved in the execution of work should also be examined before formulating the rates for complete items of works described in the schedule. The Tender submitted will be deemed to have been made after such inspection.
DRAWINGS FOR WORKS: The percentage rates for the schedule items and itemized rates for the non-scheduled items quoted by the tenderer as may be accepted by the railways will, hold good irrespective of any changes, modifications, alterations, additions, omissions in the locations of structures and detailed drawings, specifications and/or the manner of executing the work. It should be specifically noted that some of the detailed drawings may not have been finalized by the Railway and will, therefore, be supplied to the contractor as and when they are finalized on demand. No compensation whatsoever on this account shall be payable by the Railway Administration. No claim whatsoever will be entertained by the Railway on account of any delay or hold up of the works arising out of delay in approval of drawings, changes, modifications, alterations, additions, omission and the site layout plans or detailed drawings and design and/or late supply of such material as are required to be arranged by the Railway or due to any other factor on Railway Accounts.
Manual tenders, supporting documents etc., sent by Post/FAX/Courier or in Person SHALL NOT BE ACCEPTED.
All requisite documents are to be properly submitted online only and the bidders should ensure that the content of the documents uploaded is distinctly legible /readable.
CORRIGENDUM NOTICE ON IREPS: Railway may modify the tender document by issuing online corrigendum through "www.ireps.gov.in" 15 days prior to the tender closing date. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing of tender, during which tenderers can submit their offer.
If the Bid of a Tenderer is seriously unbalanced in relation to the Engineer's estimate of the cost of work to be performed under the contract, the Railways may require the tenderer to produce detailed price analysis for any or all items of the Tender Schedule, to demonstrate the internal consistency of those prices with the construction methods and schedule proposed.
No Technical and Financial credentials are required for tenders having value up to Rs 50 lakh. For tenders valuing more than Rs. 50.00 lakh: The offer of Tenderer(s) who do not enclose Experience Certificate & Turnover Certificate with requisite details, and supporting documents along with their Tender to establish their credentials shall be summarily rejected, even though they are working contractors or contractors on approved list.
The offer shall be evaluated only from the certificates/documents submitted along with the tender offer.
Any Certificate /Documents offered / submitted /received after the tender opening shall not be given any credit and shall not be considered.
Attestation of documents may be self attested or attested by a Gazetted Officer.
Railwayreservestherighttoverifythe authenticityofthe documents/information furnished.
IRSGCC para 6.0 of part-I (a)(ii) Tenderers will examine the various provisions of The Central Goods and Services Tax Act, 2017(CGST)/ Integrated Goods and Services Tax Act, 2017(IGST)/ Union Territory Goods and Services Tax Act, 2017(UTGST)/ respective state's State Goods and Services Tax Act (SGST) also, as notified by Central/State Govt.& as amended from time to time and applicable taxes before bidding. Tenderers will ensure that full benefit of Input Tax Credit (ITC) likely to be availed by them is duly considered while quoting rates. (a)(iii) The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/ UTGST /SGST Act to railway immediately after the award of contract, without which no payment shall be released to the Contractor. The Contractor shall be responsible for deposition of applicable GST to the concerned authority. (a)(iv) In case the successful tenderer is not liable to be registered under CGST/IGST/UTGST/ SGST Act, the railway shall deduct the applicable GST from his/their bills under reverse charge mechanism (RCM) and deposit the same to the concerned authority. (b) When work is tendered for by a firm or company, the tender shall be signed by the individual legally authorized to enter into commitments on their behalf. (c) The Railway will not be bound by any power of attorney granted by the tenderer or by changes in the composition of the firm made subsequent to the execution of the contract. It may, however, recognize such power of attorney and changes after obtaining proper legal advice, the cost of which will be chargeable to the Contractor.
Increase/decrease of TAXES: if rates of existing GST or cess on GST for Works Contract is increased or any new tax /cess on Works Contract is imposed by Statute after the date of opening of tender but within the original date of completion/date of completion extended under clause 17 & 17A and the Contractor thereupon properly pays such taxes/cess, the Contractor shall be reimbursed the amount so paid. Further, if rates of existing GST or cess on GST for Works Contract is decreased or any tax/cess on Works Contract is decreased / removed by Statute after the date of opening of tender, the reduction in tax amount shall be recovered from Contractor's bills/Security Deposit or any other dues of Contractor with the Government of India.
Fixed Deposit Receipts (FDRs) submitted after award of tender towards Security Deposit/Performance Guarantee should be with automatic renewal facility only.
CONSORTIUM AGREEMENTS AND MOUS SHALL NOT BE CONSIDERED FOR PARTICIPATING IN THIS TENDER.
Tenderer(s) shall note that conditional/alternate offer will not be considered and will summarily be rejected, even though such condition makes them as the lowest tenderer.
Shramik kalyan While processing payment of any 'On Account Bill' or 'Final Bill' or release of 'Advances' or 'Performance Guarantee / Security deposit', contractor shall submit a certificate to the Engineer or Engineer's representatives that "I have uploaded the correct details of contract labours engaged in connection with this contract and payments made to them during the wage period in Railway's Shramik kalyan portal at 'www.shramikkalyan.indianrailways.gov.in' till ____Month, ____Year.
Date of inviting tender shall be the date of publishing tender notice on IREPS website if tender is published on website or the date of publication in newspaper in case tender is not published on website.
Sr. DEN/North/SBC sec : Yesvanthpur - Construction of new AC loco Trip Shed at Yesvanthpur. Maintenance period is 3 years.
19SBC26OF24-07-26Item-01
19SBC26OF24-07-26Item-01
Open
Works - General
12 Months
Unknown (Unspecified Location)
₹0
₹14.7 L
17 Aug 2026
24 Jul 2026
3 Aug 2026
395 items across 7 schedules · ₹10,35,69,560.93 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms etc. with contractor's own earth conforming to Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations as applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content to OMC, mechanical compaction to specified density a n d dressing of bank to final profile as per RDSO Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: 1) Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for benching. 2) Payment for Earthwork under this item shall be made based on the cross section measurements calculated (i) with original ground profile of existing bank based on initial ground levels before doing benching and (ii) final profile of the bank worked out with final levels as per prevailing guidelines. | — | — | — | — | |
| 1 | Using Soil Class SQ2 | cum | 500.00 | 259.03 | 1,29,515 |
| Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading, unloading, bailing & pumping out water, if required, clearance of site and all other works incidental thereto for completing the work as per RDSO Specification No. RDSO/2020/GE: IRS- 0004 with latest updated correction slips and to the satisfaction of the Engineer-in-Charge. Note: (i) All usable earth arising from cut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and will be property of the Railways. (iii)Cut trees shall be property of Railways and to be deposited in the railway godown unless specified otherwise in the Conditions of Contract. | — | — | — | — | |
| 2 | In all conditions and classifications of soil except rock | cum | 3000.00 | 101.03 | 3,03,090 |
| Providing road crane of specified lifting capacity with specified jib length revolving type for material handling, assembly & erection of girders/slab/RCC Box etc. | — | — | — | — | |
| 3 | 12 MT capacity | Day | 5.00 | 8,708.98 | 43,544.9 |
| Insertion of rails of all types & length in track, laid on any type & density of sleeper to the specified gauge under traffic block. Rates include fastening of rail with sleepers with standard set of fastenings and fixing of fish plates and bolts or, if required, providing gap for w e l d i n g and stacking of released material without infringement within 250m as directed by Engineer-in- Charge. Note: Rail drilling and cutting to be paid separately. | — | — | — | — | |
| 4 | For Through Rail Renewal work | TRM | 350.00 | 41.95 | 14,682.5 |
| Under Traffic Block: Dismantling of existing BG turnouts, diamond crossings and derailing switches with all types of rails and sleeper layout, removing rails, switches, crossings, sleepers & fastenings, leveling of ballast to correct profile & stacking all the released materials, sleepers, fastenings, rails, switches & crossings including segregating & stacking at specified locations in a neat and countable manner, within the lead of 250m & all lift, clear of infringements, crossing of track, if any complete, as directed. Note: 1. This item shall be operated only when existing turnout is replaced either with new turnout in case of TTR or with plain track when existing turnout is no more required at that location. 2. Rail cutting will be paid extra under relevant item. 3. Laying of new turnout or plain track on prepared ballast bed, as required, shall be paid separately under relevant item. | — | — | — | — | |
| 5 | 1 in 8½ Turnout (Under Traffic Block) | Set | 2.00 | 27,463.98 | 54,927.96 |
| 6 | 1 in 12 Turnout (Under Traffic Block) | Set | 1.00 | 31,593.66 | 31,593.66 |
| Assembling on temporary staging and insertion of all types of turnouts including diamond crossings and derailing switches on prepared ballast bed during traffic block, manually or by contractor's cranes, at specified location with 52Kg / 60Kg rail section on PSC sleepers with Railways rails/sleepers available anywhere within 500m as per standard drawing, duly leading sleepers, rails, switches, crossings, fastenings etc. including rail cutting, drilling, fixing of all components, fittings etc. with housing of tongue rails as per requirement of signaling including crossing of track, filling and spreading of ballast in crib and shoulder as required, linking of turnout with existing track, attending track parameters including lifting, providing one round of packing to make track fit for 20 kmph speed including lubrication of fittings/fastenings, complete in all respect and as directed by Engineer in- charge. Note: Required P.Way fittings shall be supplied at the SSE/P.Way stores. | — | — | — | — | |
| 7 | 1 in 8½ Turnouts | Set | 6.00 | 53,810.76 | 3,22,864.56 |
| 8 | 1 in 12 Turnouts | Set | 1.00 | 62,466.12 | 62,466.12 |
| 9 | Derailing Switch | Set | 1.00 | 13,312.91 | 13,312.91 |
| Laying and linking all types of turnouts, diamond crossings and Derailing switches with 52Kg / 60Kg rail section on PSC sleepers on ballast bed, prepared after dismantling & removal of existing turnout/normal line during TTR/yard remodeling under traffic block, as per standard drawing, duly leading sleepers, rails, switches, crossings, fastenings including rail cutting, drilling, fixing of all components, fittings with housing of tongue rails as per requirement of signaling, preparing ballast bed, filling and spreading of ballast as required, linking of turnout with track, attending track parameters including lifting, providing one round of packing to make track fit for 20 kmph speed including lubrication of fittings/fastening, complete as directed by Engineer in-charge. Note: Payment for dismantling & removal of existing turnout/normal line, transportation/stacking of released material and preparing of ballast bed is not included in this item and shall be paid under relevant item. | — | — | — | — | |
| 10 | 1 in 8½ Turnouts | Set | 6.00 | 43,783.99 | 2,62,703.94 |
| 11 | 1 in 12 Turnouts | Set | 1.00 | 51,038.33 | 51,038.33 |
| 12 | Boxing and profiling of ballast as per procedure prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer- In charge. | TRM | 600.00 | 23.83 | 14,298 |
| First or Second Through Packing of track of all sleeper density including giving a general lift, as desired to eliminate sag after Deep Screening work, lifting of track, lowering of track and major realignment of curves and formation rehabilitation as per procedure prescribed in latest edition of IRPWM. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm. | — | — | — | — | |
| 13 | For PSC Sleeper Track with Sleeper Density of 1540 | TRM | 350.00 | 113.5 | 39,725 |
| Through packing of points and crossings, derailing switches including gauging, fittings recoupment, ballasting as required, elimination of sag and to the required alignment after Deep Screening as per procedure prescribed in latest edition of IRPWM complete as per direction of Engineer-in-charge. Note: This work shall be operated in exceptional cases with written approval at DEN level when UNIMAT is not available and immediate packing is required to pass train over it. | — | — | — | — | |
| 14 | 1 in 8½ PSC layout | Set | 6.00 | 10,390.42 | 62,342.52 |
| 15 | 1 in 12 PSC layout | Set | 1.00 | 13,514.51 | 13,514.51 |
| 16 | 1 in 8½ Derailing Switch | Set | 1.00 | 1,479.76 | 1,479.76 |
| Anti-corrosive painting of rail outside track on rail bottom, web, foot and fishing plane with two coats of thickness of 100 microns each by bituminous black paint confirms to IS-9862 of reputed make including surface preparation, as a complete job as per procedure prescribed in latest edition of IRPWM. | — | — | — | — | |
| 17 | For 52 Kg Rails | RM | 1100.00 | 42.84 | 47,124 |
| Quick cutting with abrasive rail cutter of all types of rail sections including wear resistant, head hardened rails up to 110 UTS, with contractors tools & plants, equipment, consumable with all lead & lift etc. complete as directed by Engineer in-charge. Abrasive Rail Cutter will be as per RDSO Specification No. TM/SM/1 (Rev. 01 of 2012) with latest status of RDSO; Rail Cutting Wheel Abrasive Disc will be as per RDSO Specification No.TM/SM/2 (Rev. 01 of 2020) | — | — | — | — | |
| 18 | 52 Kg - 90 UTS - Outside Track | Each | 50.00 | 210.75 | 10,537.5 |
| 19 | 52 Kg - 90 UTS- On Running Line | Each | 50.00 | 239.76 | 11,988 |
| Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine including chamfering with appropriate chamfering tools in all types of rail section with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in- charge. Rail Drilling Machine will be as per RDSO Specification No. TM/SM/3, dated 24.04.1991. | — | — | — | — | |
| 20 | On Running Line | Each | 100.00 | 66.26 | 6,626 |
| 21 | Drilling holes of specified size for bond holes with 7.2mm dia drill twist to correct spacing and location on 60kg/52kg rails on cess or under traffic block with contractor's tools and plant, equipment, consumable, labour etc complete as directed by the Engineer in charge at site. | Each | 100.00 | 35.67 | 3,567 |
| Loading of rails of any section and length up to 1 3 metres in Wagons / Truck / trailer including lead up to 50 metres and lift up to 5 metres. | — | — | — | — | |
| 22 | In Wagon where mechanical handling is possible and traffic block is not required or in Truck/trailer. | MT | 36.00 | 116.63 | 4,198.68 |
| Loading, leading and unloading of 52Kg / 60Kg rail up to 13 metre length by Railway's Rail Dolly / Dip Lorry to the nominated location under traffic with line protection in case road carriage is not possible with different lead with a lift up to 5 metre during block period. | — | — | — | — | |
| 23 | For lead up to 500 metre. | MT | 36.00 | 348.78 | 12,556.08 |
| 24 | For lead beyond 500 metre and up to 1 Km. | MT | 36.00 | 449.41 | 16,178.76 |
| Unloading of rails of any section and length up to 13 metre, in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/trailer including lead up to 50 metre, lift up to 5 metre and stacking in prescribed manner. | — | — | — | — | |
| 25 | From Wagon where mechanical handling is possible a n d traffic block is not required or in Truck / trailer. | MT | 36.00 | 86.15 | 3,101.4 |
| Loading of 52kg / 60kg PSC normal line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in a neat manner to departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track with free lead up to 250 metre and lift up to 5 metre, if required with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. | — | — | — | — | |
| 26 | In Wagon where mechanical handling is possible and traffic block is not required or in Truck / trailer | MT | 291.70 | 90.85 | 26,500.95 |
| Loading, leading and unloading of PSC Sleepers of 52Kg / 60Kg by Railway's Rail Dolly/ Dip Lorry to the nominated location under traffic in case road carriage is not possible for different leads and lift up to 5 metres. | — | — | — | — | |
| 27 | For lead up to 500 metres | MT | 291.70 | 271.49 | 79,193.63 |
| 28 | For lead beyond 500 metre and up to 1 Km | MT | 291.70 | 401.94 | 1,17,245.9 |
| Loading, leading and unloading of all types of P.Way fittings and all other miscellaneous m a t e r i a l except Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading. | — | — | — | — | |
| 29 | Lead up to 5 Km | MT | 1.20 | 153.48 | 184.18 |
| 30 | Lead beyond 5 Km and up to 10 km | MT | 1.20 | 192.87 | 231.44 |
| 31 | Lead beyond 10 Km and up to 20 km | MT | 1.20 | 246.67 | 296 |
| 32 | Lead beyond 20 Km and up to 30 km | MT | 1.20 | 312.4 | 374.88 |
| 33 | Lead beyond 30 Km and up to 50 km | MT | 1.80 | 403.95 | 727.11 |
| 34 | Lead beyond 50 Km and up to 100 Km | MT | 1.80 | 603.88 | 1,086.98 |
| 35 | Lead beyond 100 Km and up to 150 Km | MT | 1.80 | 902.74 | 1,624.93 |
| 36 | Extra for every Km per MT beyond 150 Km over item no. 172047 | MT-Km | 809.60 | 3.05 | 2,469.28 |
| Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: 1. Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items. | — | — | — | — | |
| 37 | Lead up to 5 Km | MT | 32.77 | 49.56 | 1,624.08 |
| 38 | Lead beyond 5 Km and up to 10 km | MT | 32.77 | 88.96 | 2,915.22 |
| 39 | Lead beyond 10 Km and up to 20 km | MT | 32.77 | 142.75 | 4,677.92 |
| 40 | Lead beyond 20 Km and up to 30 km | MT | 32.77 | 208.48 | 6,831.89 |
| 41 | Lead beyond 30 Km and up to 50 km | MT | 49.15 | 300.03 | 14,746.47 |
| 42 | Lead beyond 50 Km and up to 100 Km | MT | 49.15 | 499.96 | 24,573.03 |
| 43 | Lead beyond 100 Km and up to 150 Km | MT | 49.15 | 798.82 | 39,262 |
| 44 | Extra for every Km per MT beyond 150 Km over item no. 172057 | MT-Km | 22119.75 | 3.05 | 67,465.24 |
| Unloading of 52kg / 60kg PSC line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track and lead up to 250 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. | — | — | — | — | |
| 45 | From Truck / Trailer | MT | 291.70 | 83.98 | 24,496.97 |
| Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site. | — | — | — | — | |
| 46 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 40.00 | 754.1 | 30,164 |
| 47 | Manufacturing and fixing buffer stop with Railway supplied rails, cutting, including bending of rails as per plan ,with all contractor's labour, materials, tools, plants etc. and all lead and lift including crossing of track where necessary and as directed by Engineer in charge at site. Note: Excavation, fixing rails in cement concrete, drilling of holes will be paid separately. | Each | 3.00 | 14,764.14 | 44,292.42 |
| Schedule total | ₹20,27,961.61 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ConstructionofnewACLocoTripShedatYPR1.pdf special condition of electrical
ATTACHMENT
GCCAPRIL2022_AllACS_upto11.pdf
ATTACHMENT
ACS-6.pdf
ATTACHMENT
ACS-5toGCC2022.pdf
ATTACHMENT
Instructionstobidders.pdf
ATTACHMENT
GCC2022ACS-3_20230426_1141401.pdf
ATTACHMENT
Advance Correction Slip No.2
ATTACHMENT
GCCACS11_compressed.pdf
ATTACHMENT
ACS7.pdf
ATTACHMENT
JPOCablecuts.pdf
ATTACHMENT
Standardtenderdoc-6.1.pdf
ATTACHMENT
Proforma-161718.pdf
ATTACHMENT
bidcapacityformat-1-2_1.pdf
ATTACHMENT
ACS-9dated.09.01.2025.pdf
ATTACHMENT
acs10.pdf
ATTACHMENT
GCCACS.pdf
ATTACHMENT
NEFTForm.pdf
ATTACHMENT
IRGCCApril2022.pdf
ATTACHMENT
ACS-2toGCC-2022_2022-CE-1-CT-GCC-2022-POLICY_13.12.20221.pdf
ATTACHMENT
Order-deptforpromotionofindustryandtrade.pdf
ATTACHMENT
ConstructionofnewACLocoTripShedatYPR1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .