Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Nominated₹52.0 LAccepted-AOC 147 UDHYOG VIHAR PH I GURGOAN HARYANA 122016 | GURUGRAM | HARYANA | 122016 | Nominated | Accepted-AOC Nominated bidder |
Tender Value
₹52 L
EMD Value
₹1.0 L
Closing Date
3 Nov 2022, 3:00 pmClosed
Chief Engineer GSS
DCSEM, DAE, V.S. Bhavan, Anushaktinagar, Mumbai-400094
Biennial comprehensive maintenance of M/s Johnson make elevators at Anushaktinagar, Mumbai andKharghar Dispensary in Navi Mumbai.
2022_DCSEM_718978_1
DCSE/CQD/QSC/GSS/22-23/NIT-30
Single
Electrical Works
Item Rate
730 days
Anushaktinagar Mumbai and Kharghar
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.0 L
29 Nov 2022
20 Oct 2022
4 Nov 2022
20 Oct 2022
3 Nov 2022
20 Oct 2022
20 Oct 2022 - 2 Nov 2022
Amount
Comprehensive maintenance of the following M/S Johnson Lifts Pvt. Ltd. make elevators viz. Passenger / Dumbwaiter elevators comprising of AC VVVF drive with microprocessor based controlled lifts installed at A’ Nagar as per tender specification & relevant Indian /International / Manufacturer's standards of Maintenance as applicable and as directed by Engineer-in-charge.
13 Passenger elevator (G+5 upper floors) at Niyamak Bhavan-B building ,Anushaktinagar M/C No. 1147-48
8 passenger elevator ( G+7 upper floor) at Mondavi(V-E) building,Western Sector, Anushaktinagar M/C No. 3131-32
10 passenger elevator(G+7 upper floor) at P.G Hostel ,Western Sector, Anushaktinagar( M/C No.3133-34)
8 passenger elevator (G+4 upper floor) Vaishak building(TIFR housing),New Manadala, Anushaktinagar (M/C No. LB 9605)
15 passengers bed cum passengers(B+G+3 upper floors)at Kharghar dispensary,Navi Mumbai (M/C no.L-E5172)
Dumbwaiter G+5 upper floor at AERB-II M/C No. 1149
DDumbwaiter G+7 upper floor at P.G. Hostel M/C No. 3135
Periodic testing of safety related features of elevator witnessed by DCSEM staff preparation of test reports counter signed by agency & DCSEM staff.
Testing of overload indication, alarm and trip system, strain gauges &/ overload limiting feature etc. at full load dead weight & its necessary adjustment for safe use of elevator all as per instruction of Engineer in charge. Note:-1st ,7th,13th &18th months of the contract
Testing measurement & preparation of reports witnessed and counter signed by agency & DCSEM staff of brake slippage at full load dead weight during & its necessary adjustment for safe use of elevator all as per instruction of Engineer in charge. Note:- This test shall be carried out 1st & 13th month of the contract.
Major repair / replacement / providing the following complete with all accessories, interconnections etc. all as required.
Replacement of pressure / exhaust fan in car by new one.
PVC flooring of approved make and colour of 2mm thick for 8 passenger lift including dismantling of existing flooring etc.
PVC flooring of approved make and colour of 2mm thick for 10 passenger lift including dismantling of existing flooring etc.
PVC flooring of approved make and colour of 2mm thick for 13 passenger lift including dismantling of existing flooring etc.
Comprehensive maintenance of ARD batteries of all 08nos. elevators.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .