Assistant Engineer (works)
SHQ BSF Gopalpur
Annual Repair and Maintenance of BOP building at BOP Jamaldah and Nalingibari of 156 BN BSF under SHQ BSF Gopalpur
2026_BSF_925245_1
17A/BSF/ SHQ-GPR/ Engg/BM(MCEW)/ 2025-26
Open Tender
Civil Works - Buildings
Percentage
60 days
BOPs of 156 BN BSF
As per tender Documents
10 documents required · 10 mandatory
₹0
₹3,996
22 Sept 2026
8 Sept 2026
17 Sept 2026
8 Sept 2026
15 Sept 2026
8 Sept 2026
8 Sept 2026 - 15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil | 3.43 | cum | 177.5 | ₹608.83 |
| 2 | Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete | 7.2 | sqm | 392.15 | ₹2,823.48 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts | 4 | sqm | 961.3 | ₹3,845.2 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for :Shelves (Cast in situ) | 17.36 | sqm | 927.25 | ₹16,097.06 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo Mechanically Treated bars of grade Fe-500D or more. | 30.71 | kg | 107.85 | ₹3,312.07 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 416.45 | kg | 107.85 | ₹44,914.13 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) | 0.62 | cum | 6,189.65 | ₹3,837.58 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 1.42 | cum | 8,583.4 | ₹12,188.43 |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 1.29 | cum | 7,132.25 | ₹9,200.6 |
| 10 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in :cement mortar 1:4 (1 cement : 4 coarse sand) | 9.68 | sqm | 905.05 | ₹8,760.88 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
BOQ_972295.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .