Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹52.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹53.8 L+₹1.5 L (2.83%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹54.7 L+₹2.4 L (4.49%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹59.4 L+₹7.1 L (13.6%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹66.8 L+₹14.5 L (27.7%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹92.2 L
EMD Value
₹1.8 L
Closing Date
25 Sept 2026, 4:00 pmClosed
Office ofExecutive Engineer RNB Vailoo
Office ofExecutive Engineer RNB Vailoo
Upgradation of Bulbul Nowgam Wanihama Road
2026_PWDJK_324857_3
eNIT43DIVISIONVAILOO
Open Tender
Civil Works
Percentage
240 days
Vailoo
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,600
Yes
Centralized Pooling Account
₹1.8 L
Yes
1 Oct 2026
16 Sept 2026
26 Sept 2026
16 Sept 2026
25 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earthband disposal of surplus excavated earth as directed. (in all kinds of soils). | 280 | CUM | 225.18 | ₹63,050.12 |
| 2 | Providing & Laying of stone soling (dully hand packed)including watering dressing and ramming with all carriages loading un-loading and stacking etc complete . | 35 | CUM | 847.46 | ₹29,661.03 |
| 3 | Providing and Laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level in 1:4:8 mix. | 24.38 | CUM | 4,561.44 | ₹1,11,207.79 |
| 4 | Providing and Laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level in 1:2:4 mix. Using stone aggregate 20 mm nominal size. | 146.25 | CUM | 5,778.52 | ₹8,45,107.82 |
| 5 | Centring and shuttering in fdn incld. Strutting, proping etc & removal of form work for Founadtions, footings, bases of columns for mass concrete | 900 | SQM | 251.04 | ₹2,25,937.8 |
| 6 | P/L of 50 mm thick Cement Concrete Flooring in 1:2:4 mix. | 150 | SQM | 492.83 | ₹73,925.1 |
| 7 | P/L of 12 mm thick cement plaster in 1:6 mix | 450 | SQM | 233.38 | ₹1,05,019.2 |
| 8 | P/L Nallah Boulders Handpacked of specified grade and size including ramming spreading and compacting with power road roller 8-10 tonne capacity and all carriages & loading/unloading complete | 70.88 | CUM | 805.09 | ₹57,064.42 |
| 9 | Carriage of different items by machanical transport including loading/unloading. 40mm + 20mm nominal size aggregates from mirbazar for an average lead of 20 KMs. | 160.32 | cum | 359.39 | ₹57,617.73 |
| 10 | Carriage of different items by machanical transport including loading/unloading. Sand from source for an average lead of 20 Kms | 82.5 | CUM | 359.39 | ₹29,649.84 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
BOQ_1096214.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .