| Sl No | Description | Qty | Unit | North East Plantations & Commercial Pvt Ltd L1 | RCN Constructions Pvt Ltd L2 |
|---|---|---|---|---|---|
| 1.00 | SITE CLEARANCE. 'Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to beused or auctioned up to lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm thickness. (I) By Manual Means:- A. In area of light Jungle | 5.6 | Hect | - | - |
| 2.00 | EARTHWORK. Construction of embankment with approved materials obtained from borrow pits with a lifts up to 1.5m, transporting to site, spreading grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000m as per technical specification Clause 301.5 (i) From Private Land | 8,999.4 | Cum | - | - |
| 3.00 | Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes. (a) Disposal of cut material with all lift and lead up to 1000m | 26,772.03 | Cum | - | - |
| 4.00 | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table (300-2) ( including compensation of earth.)(a), (Including cost of testing of materials at site and laboratory as directed by the deptt.) | 22,365 | Cum | - | - |
| 5.00 | BASE AND SUB-BASE COURSES Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density,complete as per cl. 401( with an initial lead of 5 Km.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) | 3,937.5 | Cum | - | - |
| 6.00 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming stone screening/binding materials to fill up the interstices of coarse aggregates, watering and compacting to the required density grading 3 as per Technical Specification Clause 405. A. By Manual Means (3) WBM Grading-2
Using Screening Type-B (11.2 mm for Gr. II ) | 1,968.75 | Cum | - | - |
| 7.00 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming stone screening/binding materials to fill up the interstices of coarse aggregates, watering and compacting to the required density grading 3 as per Technical Specification Clause 405. A. By Manual Means (3) WBM Grading-3
Using Screening Type-B (11.2 mm for Gr. III ) | 1,968.75 | Cum | - | - |
| 8.00 | BITUMINOUS COURSES. Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of specified quantity using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) B. Primer@ 1.00kg per sqm (ii) With bitumen emulsion CSS-1h | 26,250 | Sqm | - | - |
| 9.00 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.) (III) With Bitumen emulsion CRS-1 | 52,500 | Sqm | - | - |
| 10.00 | Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix and filler transporting the hot miox to work site,laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no. 507. complete in all respect. (including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.) | 1,311.94 | Cum | - | - |
Tender Value
₹9.2 Cr
EMD Value
₹18.4 L
Closing Date
5 Feb 2020, 2:00 pmClosed
Chief Engineer, PWD (Roads), Assam
O/o the Chief Engineer, PWD (Roads), Assam, Chandmari, Guwahati, 781003
SOPD_SIG_19_20_12 Improvement of DM road Chutianala to Upper Dillaji with provision of Slab culvert (Ch. 0.00m to 7000m) under Signature Project of SOPD-G (State Priority Scheme) for the year 2019-20, Diphu LAC
2020_PWD_15864_13
CE/DEV/TB/199/2019-20/01
Open Tender
Civil Works
270 days
Diphu
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
Empowered Officer, ASRB A/C No. 10566991479
₹18.4 L
Yes
O/o the Chief Engineer, PWD (Roads), Assam
22 Feb 2020
16 Jan 2020
5 Feb 2020
16 Jan 2020
5 Feb 2020
17 Jan 2020
16 Jan 2020 - 1 Feb 2020
17 Jan 2020
Amount
SITE CLEARANCE. 'Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to beused or auctioned up to lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm thickness. (I) By Manual Means:- A. In area of light Jungle
EARTHWORK. Construction of embankment with approved materials obtained from borrow pits with a lifts up to 1.5m, transporting to site, spreading grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000m as per technical specification Clause 301.5 (i) From Private Land
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes. (a) Disposal of cut material with all lift and lead up to 1000m
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table (300-2) ( including compensation of earth.)(a), (Including cost of testing of materials at site and laboratory as directed by the deptt.)
BASE AND SUB-BASE COURSES Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density,complete as per cl. 401( with an initial lead of 5 Km.)( Including cost of testing of materials at site and laboratory as directed by the deptt.)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming stone screening/binding materials to fill up the interstices of coarse aggregates, watering and compacting to the required density grading 3 as per Technical Specification Clause 405. A. By Manual Means (3) WBM Grading-2 Using Screening Type-B (11.2 mm for Gr. II )
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming stone screening/binding materials to fill up the interstices of coarse aggregates, watering and compacting to the required density grading 3 as per Technical Specification Clause 405. A. By Manual Means (3) WBM Grading-3 Using Screening Type-B (11.2 mm for Gr. III )
BITUMINOUS COURSES. Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of specified quantity using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) B. Primer@ 1.00kg per sqm (ii) With bitumen emulsion CSS-1h
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.) (III) With Bitumen emulsion CRS-1
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix and filler transporting the hot miox to work site,laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no. 507. complete in all respect. (including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.)
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.509. complete in all respect. ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant ) (Including cost of testing of materials at site and laboratory as directed by the deptt.)
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Plain cement concrete 1:3:6 nominalmix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Bedding for pipe (ii) Type B(First Class) Bedding Laying (First Class) bedding on well compacted sand moorum as per Clause 1105(ii) (i) Sand Filling
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. II. In 1:4 cement mortar
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and technical specifications
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. B. Sandy material. Back Filling behind abutment
Road Marker (Center Line ) : Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoSrt&H specifications
TRAFFIC SIGNS, MARKINGS AND ROAD APPURTENANCES & MISCELLANEOUS ITEMS. Road Marker (Edge Line) : Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoSrt&H specifications
Road Marker (Center Line) : Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoSrt&H specifications
Providing ‘Sparkle Solar Road Studs, manufactured by Tata B.P. Solar India Ltd. Of size (125mmx125mm), 90mm height (from bottom of shank to the top of stud) with detachable battery, m6LEDs-three on each side for Bi-directional studs/3 LEDs on one side for unidirectional studs, ultra bright LED in amber and red colour, weight per stud 700+25 gms, flash rate of 50-65 times per minute completely water resistant and weather proof with replacement warranty and free maintenance fro one year from the date of installation of stud on road-(installation should be made using adhesives and procedures recommended by manufacturer under the supervision of their competent technician).
Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand) 90cm equilateral traingle
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) 5th kilometre stone (precast)
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary Kilometer stone (Precast)
'Direction and place identification sign more than 0.9sqm size board. Providing and erecting direction and place identification retro-Reflectrorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 801.3 fixed over aluminium sheeting, 2mm thick with area exceeding 0.9sqm fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm, 2 nos. firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. . (All the Steel work must be Tata/Sail/or any other approved brand)
PLANTATION OF TREES. Planting of trees and their maintenance for three year (Planting of tree by road side(Avenue trees)in .60m dia holes, 1m deep dug in the ground, mixing the soil with decayedfarm yard/sludge manure, planting the saplinfgs backfilling the trenches, watering, the tree guatrd and maintaining the plant for three year.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.
Providing PCC M20 architectural coping on top of retaining/breast wall
RCN Constructions Pvt Ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.46 MB
Tendernotice_2.pdf
PDF • 4.50 MB
Tendernotice_3.pdf
PDF • 0.37 MB
BOQ_23992.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid