| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 LAccepted-AOC FLAT NO 101 UGF FRONT LHS RZ B 49A KAILASHPURI PALAM COLONY NEW DELHI 110045 | SOUTH WEST | DELHI | 110045 | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹17.6 L+₹56,780 (3.34%)Rejected-AOC | L2 | Rejected-AOC Other than lowest Bidder | |
| 3 | L3₹24.6 L+₹7.5 L (44.3%)Rejected-AOC | L3 | Rejected-AOC Other than lowest Bidder | |
| 4 | L4₹25.6 L+₹8.6 L (50.5%)Rejected-AOC 0 NEAR SHIV MANDIR KALYANIPURA KRIPAL NAGAR AJMER RAJASTHAN 305001 UDYAM RJ 01 0091182 | AJMER | RAJASTHAN | 305001 | L4 | Rejected-AOC Other than lowest Bidder | |
| 5 | L5₹27.4 L+₹10.4 L (60.8%)Rejected-AOC | L5 | Rejected-AOC Other than lowest Bidder |
Tender Value
₹28.3 L
EMD Value
₹56,600
Closing Date
17 Dec 2020, 6:00 pmClosed
GE (S) Jaipur
Garrison Engineer (South) Military Engineer Services Kalyan Marg, Jaipur302006
MANNING AND OPERATIONS OF DG SET AT HOLIDAY HOME AND COMMAND OFFICER MESS AND MANNING AND OPERATION OF PASSENGER LIFT AT HOLIDAY HOME AND AMC OF LIFT UNDER GE (S) JAIPUR
2020_MES_399714_1
GE (S)J-39P/2020-21 8608/E8
Open Tender
Miscellaneous Works
Item Rate
335 days
Jaipur
Class D Cat d (v)
9 documents required · 9 mandatory
₹500
GE (S) Jaipur
₹56,600
Yes
30 Dec 2020
1 Dec 2020
19 Dec 2020
1 Dec 2020
17 Dec 2020
2 Dec 2020
Amount
Manning and operation of Electrically Operated Automatic Passenger Lift of Holiday Home including cleaning, providing trouble free uninterrupted service (number of shift and timing of shift for operation subject to change as per ground requirement and will be as directed by engineer in charge). Operation consists of three shift in a day as detailed below (each shift is having 8 hours of duration) on all working days including Sundays and holidays, complete all as specified and as directed by Engr-in-Charge. S.No. No.of shift Skilled Lift Operator Total Shift Per Day per shift (i). 3 1 3 Duration of Shift: 0600 Hrs to 1400 Hrs 1400 hrs to 2200 Hrs 2200 hrs to 0600 Hrs (335 X 3 = 1005 Shifts)
Manning and operation, including preventive maintenance and cleaning complete of DG Set 160KVA at Sapta Shakti Holiday Home of Make: Cummins and operate Water Supply installation at Holiday Home (number of shift and timing of shift for operation subject to change as per ground requirement and will be as directed by engineer in charge). Operation consists of three shift in a day as detailed below (each shift is having 8 hours of duration) on all working days including Sundays and holidays, complete all as specified and as directed by Engr-in-Charge. S.No. No.of shift Skilled Operator Total Shift Per Day FGM per shift (i). 3 1 3 Duration of Shift: 0600 Hrs to 1400 Hrs 1400 hrs to 2200 Hrs 2200 hrs to 0600 Hrs (335 X 3 = 1005 Shifts)
Manning and operation, including preventive maintenance and cleaning complete of DG Set 30KVA at Command Officers Mess of Make: Cummins and operate Water Supply installation at Command Officers Mess (number of shift and timing of shift for operation subject to change as per ground requirement and will be as directed by engineer in charge). Operation consists of three shift in a day as detailed below (each shift is having 8 hours of duration) on all working days including Sundays and holidays, complete all as specified and as directed by Engr-in-Charge. S.No. No.of shift Skilled Operator Total Shift Per Day FGM per shift (i). 3 1 3 Duration of Shift: 0600 Hrs to 1400 Hrs 1400 hrs to 2200 Hrs 2200 hrs to 0600 Hrs (335 X 3 = 1005 Shifts)
Note Applicable to Srl No. 1, 2 and 3 above:
Operational timing shall be as directed by Engineer in charge as on ground requirement. Operating operational timing and shifts may be changed as on requirement at any time by the Engr-in-Charge.
The contractor shall be responsible to keep the installations neat and clean every day including 10 mtrs all around the installation and of areas around passenger lift surrounding (Consumables items for cleaning like Cleaning agent, soap, duster, broom, mop etc including T&P required for minor wear/ tear/ minor repair etc shall be deemed to be included in the rates quoted by the contractor)
Proper log sheet for running of the DG Set shall be maintained complete all as specified.
Carryout weekly checkup of electrical panels installed and Intimate to Engr-in-Charge immediately for any defects /break down/repairs required complete all as specified and directed.
Carryout tightening of nuts & bolts of installation and connected items, replace where ever required, applying gland packing and greasing complete all as specified and directed.
Operator will be in Proper dressed during duty time i.e. overall combination of grey/navy blue colour, protective clothing, protective shoes , mask, gloves, required for maintenance and operation shall be arranged by the contractor within the overall cost quoted against the item .No extra amount shall be paid separately on this account complete all as specified and directed. If any operator is found without uniform the openalty @ Rs. 100/- per shift shall be imposed on the contractor
Safety devices as per latest IS shall be arranged by the contractor for his labour deployed in maintenance and operation work. Also necessary T&P required while working shall be arranged by the contractor at his own cost, no extra amount shall be paid by the Dept. on this account.
Register, Log sheet and other stationery items required for record of DG Set plant/ lift manning and operation details etc shall be provided by the contractor within the overall cost quoted against the item.
First aid box consisting of all reqd medicine as per norms to be provided by the contractor within the overall cost quoted against the item. A penalty of Rs.300/- per day will be deducted per installations if the requirement is not adhered to.
A penalty of Rs. 1000/- per shift will be deducted in the case of absence by any operator (FGM) in any shift fromany of the installation.
DHPP (N) shall be issued by the department free of cost for use for DG Set operation. However, the contractor shall arrange at his own resource for carrying of fuel from MT Storeyard to Holiday Home/ Command Officer Mess and others as specified above. The quoted rate shall be deemed to include this aspect and nothing shall be paid by the department in this regard.
The minimum wages as published by Govt of India and State authorities shall be applicable for payment to the operators. The higest rate shall be paid to the operators from the Minimum Fair Wages Order as circulated by Central and State Govt. in the respective category of labour and revised rates shall be paid to the operator as and when the rates are revised by the concerned authorities. Necessay proof of payment shall be made available to the Engr-in-Charge as and when demanded. In case any complaint is received from the operator regarding delay or non-payment of minimum wages by the contractor, the GE being principal emploer shall directly pay to the operator for the work done by him in the given month on account of contractors default and the same shall be deducted from contractors pament.
AMC of Elevator, Make: Kone Elevator India Pvt. Ltd. (08 passenger capacity) Model No 40184140. The maintenance shall be carriedout by Kone Elevator India Pvt. Ltd. Only, on all fortnightly/ quarterly setting and testing of lift operation at all the levels of building, from top floor to ground floor and from ground floor to top floor complete all as specified and as directed by Engr-in-Charge. Note Contractor will provide AMC agreemenrs by KONE Elevator India Pvt. Ltd. for a period of 11 Months and submit the same to the department without delay soon after acceptance of tender.
SHREE BHAGWATI ENTERPRISES
AMIT RISHABH BUILDERS PVT LTD
M/S JAGDAMBA ENTERPRISES
DIAMOND ELECTRICALS
M/s Yash Electrical and Maintenance
BRIJ MOHAN LAL AND CO.
Skyline Encon
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .