Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.2 LAdmitted-Finance | -32.10% | ₹6.2 L | L1 | Admitted-Finance |
| 2 | L2₹6.8 L+₹64,702.86 (10.5%)Admitted-Finance | -24.99% | ₹6.8 L+₹64,702.86 (10.5%) | L2 | Admitted-Finance |
| 3 | L3₹7.2 L+₹98,555.83 (15.9%)Admitted-Finance | -21.27% | ₹7.2 L+₹98,555.83 (15.9%) | L3 | Admitted-Finance |
| 4 | L4₹7.5 L+₹1.3 L (21.5%)Admitted-Finance | -17.51% | ₹7.5 L+₹1.3 L (21.5%) | L4 | Admitted-Finance |
| 5 | L5₹7.7 L+₹1.5 L (25.0%)Admitted-Finance | -15.15% | ₹7.7 L+₹1.5 L (25.0%) | L5 | Admitted-Finance |
Tender Value
₹9.1 L
EMD Value
₹18,200
Closing Date
17 Aug 2026, 6:00 pmClosed
Er. Raman Kumar (Xen PWD Chenani)
PWD OFFICE CHENANI
Refer to BOQ
2026_PWDJK_320154_1
e-NIT No. 47 of 2026-27 dated 08-08-2026
Open Tender
Civil Works
Percentage
30 days
Chenani
Refer to e-NIT/SBD
2 documents required · 2 mandatory
₹600
XEN PWD CHENANI
₹18,200
19 Aug 2026
8 Aug 2026
18 Aug 2026
8 Aug 2026
17 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 1 | cum | - | - |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres: ordinary rock. | 1 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | - | cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 1 | Cum | - | - |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | cum | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | - | sqm | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | - | sqm | - | - |
| 8 | Providing and fixing PV 4" dia pipes for weep holes all job complete. | - | mtr | - | - |
| 9 | Dumping of stones filling including supply of stone in horizontal on level. | - | cum | 1 | - |
| 10 | Disposal of Mulba obtained from excavation for all lifts and leads upto 1.0 km. | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_1063131.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .