| 1 | Air Cooled Ductable Split Airconditioner 11.0 Tr, Rate to be quoted after deducting Buyback items | Supply of Ceiling suspended Air Cooled Ductable Split air conditioner. The indoor unit shall be ceiling suspended type. The Indoor unit shall comprise of Fan, Cooling coil, Filter and Expansion device. The Outdoor unit shall comprise of Hermetic scroll Compressor, Air cooled condenser & Condenser fan. Compressor shall be cut-off automatically under part load conditions. The unit shall have microprocessor controls. The unit shall be factory assembled and only the refrigerant piping carried out at site. The operating refrigerant shall be R-410 A. Only Copper coils will be considered. Buy-Back of existing 4 nos x 11 TR packaged air-conditioners and 1 nox x 5.5 TR ductable split airconditioner on AS IS WHERE IS BASIS. Removal of the above units including the related accessories is in the scope of the vendor. The tenderer is advised to visit the site and ascertain themselves of the unit conditions For any disputes the decision of the Bank authorities will be treated as final. The buy back amount will be deducted to arrive at the total price schedule.- 11.0 TR Nominal Capacity Unit,Rate to be quoted after deducting Buyback items | 3 | Nos | m.premnath | 7 |
| 2 | Air Cooled Ductable Split Airconditioner 5.5 Tr, Rate to be quoted after deducting Buyback items | Supply of Ceiling suspended Air Cooled Ductable Split air conditioner. The indoor unit shall be ceiling suspended type. The Indoor unit shall comprise of Fan, Cooling coil, Filter and Expansion device. The Outdoor unit shall comprise of Hermetic scroll Compressor, Air cooled condenser & Condenser fan. Compressor shall be cut-off automatically under part load conditions. The unit shall have microprocessor controls. The unit shall be factory assembled and only the refrigerant piping carried out at site. The operating refrigerant shall be R-410 A. Only Copper coils will be considered. Buy-Back of existing 4 nos x 11 TR packaged air-conditioners and 1 nox x 5.5 TR ductable split airconditioner on AS IS WHERE IS BASIS. Removal of the above units including the related accessories is in the scope of the vendor. The tenderer is advised to visit the site and ascertain themselves of the unit conditions For any disputes the decision of the Bank authorities will be treated as final. The buy back amount will be deducted to arrive at the total price schedule - 5.5 TR Nominal Capacity Unit,Rate to be quoted after deducting Buyback items | 2 | Nos | m.premnath | 7 |
| 3 | Air Cooled Ductable Split Airconditioner 11.0 Tr Installation | Inland transportation to site, Lifting and placing at respective locations, Installation, Testing, Commissioning and Handing over the Air-Cooled Ductable Splits. Scaffolding as and when required is in the scope of the vendor only. Bank will not provide these facilities-11.0 TR Nominal Capacity Unit | 3 | Nos | m.premnath | 7 |
| 4 | Air Cooled Ductable Split Airconditioner 5.5 Tr Installation | Inland transportation to site, Lifting and placing at respective locations, Installation, Testing, Commissioning and Handing over the Air-Cooled Ductable Splits. Scaffolding as and when required is in the scope of the vendor only. Bank will not provide these facilities-5.5 TR Nominal Capacity Unit | 2 | Nos | m.premnath | 7 |
| 5 | | Supply, Installation and Testing of Refrigerant piping, fittings with suitable thick tubular nitrile rubber insulation and finished with FACTORY LAMINATED GLASS CLOTH. Complete piping workmanship to be carried out as per recommended practice. The piping to be vacuum tested and leak tested. Scope includes all refrigerant pipes shall be properly supported and anchored to the building structure using steel hangers, anchors, brackets and supports etc which shall be fixed to the building structure by means of inserts or expansion shields of adequate size and number 5/8 inches or 15.88 mm with 13 mm thick insulation | 30 | Rmt | m.premnath | 7 |
| 6 | | Supply, Installation and Testing of Refrigerant piping, fittings with suitable thick tubular nitrile rubber insulation and finished with FACTORY LAMINATED GLASS CLOTH .Complete piping workmanship to be carried out as per recommended practice. The piping to be vacuum tested and leak tested. Scope includes all refrigerant pipes shall be properly supported and anchored to the building structure using steel hangers, anchors, brackets and supports etc which shall be fixed to the building structure by means of inserts or expansion shields of adequate size and number 7/8 inch or 22.22 mm with 13 mm thick insulation | 75 | Rmt | m.premnath | 7 |
| 7 | | Supply, Installation and Testing of Refrigerant piping, fittings with suitable thick tubular nitrile rubber insulation and finished with FACTORY LAMINATED GLASS CLOTH .Complete piping workmanship to be carried out as per recommended practice. The piping to be vacuum tested and leak tested. Scope includes all refrigerant pipes shall be properly supported and anchored to the building structure using steel hangers, anchors, brackets and supports etc which shall be fixed to the building structure by means of inserts or expansion shields of adequate size and number 1 1/8 inches or 28.58 mm with 19 mm thick insulation | 45 | Rmt | m.premnath | 7 |
| 8 | | Nitrogen Pressure Testing at site. | 5 | Circuits | m.premnath | 7 |
| 9 | | Supply and First Charging of R-410 additional refrigerant gas | 1 | Lot | m.premnath | 7 |
| 10 | | Supply and installation of communication cable of suffiencient cores and 1.5 sqmm shielded cable including PVC conduit, between indoor unit to outdoor unit. Cabling shall be FRLS weather proof type as most of the cabling will have open exposure to atmosphere. The cabling shall be bundled properly and shall be neatly aligned with the Refrigerant piping. The cabling shall be well supported at specific intervals. | 75 | Rmt | m.premnath | 7 |