Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.7 LAccepted-AOC | ₹15.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹15.7 LSame as L1Rejected-Finance | ₹15.7 LSame as L1 | L2 | Rejected-Finance L2 |
| 3 | L2₹15.7 LSame as L1Rejected-Finance | ₹15.7 LSame as L1 | L2 | Rejected-Finance L2 |
| 4 | L2₹15.7 LSame as L1Rejected-Finance LAXMANPURI COLONY NAWABGANJ DISTT BARABANKI | NAWABGANJ | BARABANKI | UTTAR PRADESH | ₹15.7 LSame as L1 | L2 | Rejected-Finance L2 |
| 5 | L2₹15.7 LSame as L1Rejected-Finance | ₹15.7 LSame as L1 | L2 | Rejected-Finance L2 |
Tender Value
₹18.5 L
EMD Value
₹55,529
Closing Date
24 Jun 2026, 3:00 pmClosed
CE
Ghaziabad Nagar Nigam
Work of construction of CC road and drain in the street of Anil Raghav, Thakur Saheb, Terls, Madan Lal, Anil Kumar, Jain Tailors, Rajjan and Rukmani in Ward-88 Bagh Bhatyari.
2026_DOLBU_1158410_27
125/Nirman/2026-27 Date 06.06.2026
Open Tender
Civil Works
Percentage
Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,416
₹55,529
17 Aug 2026
12 Jun 2026
24 Jun 2026
12 Jun 2026
24 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet). | 6.65 | Cum | 1,340 | ₹8,908.32 |
| - | Dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200feet). | 14.33 | Cum | 600 | ₹8,600.85 |
| - | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre leadas per direction of Engineer-in-Charge. | 482.27 | Sqm | 100.45 | ₹48,443.82 |
| - | Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M.in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 M. lift and 30 M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M. distance as directed by the Engineer incharge. excluding Royallity. Wherever applicable for small work or Abadi area. (Where machine con not reach/move) | 196.89 | cum | 285.1 | ₹56,134.05 |
| - | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of
the work. | 24.1 | Cum | 4,000 | ₹96,396 |
| - | M-150 class B/w in 1:4 Cement C'sand mortor in including supply of all meterial labour t&P etc required for proper completion of work | 68.06 | Cum | 5,170 | ₹3,51,864.51 |
| - | 12 mm thick plaster with cement and coarse sand of1.25 fineness modules in (1:4) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, tools & plant etc required for proper completion of the work. (AS PER PWD SOR 2022 PAGE NO 36 SI NO 13.11 NEW ITEM ) | 332.4 | Sqm | 200 | ₹66,480 |
| - | Cement Concrete with 2 cm.
gauge stone grit instead of 4 cm. gauge stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. | 10.19 | Cum | 7,050 | ₹71,864.88 |
| - | S/L of stone ballast 22.4 to 53 mm size with stacking for 10 measurment etc all complete as per the direction of engineer in-charge . AS PER PWD SOR 2020 RMR | 80.38 | Cum | 2,151.2 | ₹1,72,909.15 |
| - | Supply of screening material with stacking for measurment 11 etc all complete as per the direction of engineer in-charge AS PER PWD SOR 2020 RMR | 14.47 | Cum | 2,050.2 | ₹29,662.38 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_2173944.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .