| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.4 CrAccepted-AOC | ₹35.4 Cr | L1 | Accepted-AOC L1 1st Lowest |
| 2 | L2₹37.2 CrRejected-Finance | ₹37.2 Cr | L2 | Rejected-Finance Second Lowest |
| 3 | L3₹43.9 CrRejected-Finance | ₹43.9 Cr | L3 | Rejected-Finance Third Lowest |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Solvency Certificate (IDT-2) Not-Submitted.
Registration Certificate. Not-Submitted. |
Tender Value
Refer Docs
EMD Value
₹88.1 L
Closing Date
9 Apr 2025, 3:00 pmClosed
SE KCC Pipri Sonbhadra
Office of SE KCC Pipri Sonbhadra 231221
Construction of balance EW of RKC from km 0.102 to km 24.025 from km.25.800 to Km26.700, BS At km.1.81 km.9.225 km.15.365 Box Culvert At km.6.1 km.14.800 PS At km. 12.200 km.13.450 HR for RPBC LPBC At Km.31.500 and Escape at km22.750of RKC
2025_UPIDC_1023949_1
04/SE/2024-25
Open Tender
Civil Works
270 days
Duddhi Sonbhadra
Please Refer Tender Document
2 documents required · 2 mandatory
₹2,360
₹88.1 L
5 Jun 2025
1 Apr 2025
9 Apr 2025
1 Apr 2025
9 Apr 2025
1 Apr 2025
Amount
Earth work in excavation in ordinary soil /old PATRA filling for the construction of canal including all lead,lift and T&P etc required for proper completion of work as per direction of Engineer-in-Charge.
Earth work in excavation in mixed soil with lime stone, sand stone or other soft rock by pick axes but not required blasting for the construction of canal above 10 cum discharges including all lead ,lift, labour and T & P etc required for proper completion of work as per direction of Engineer-in-Charge.
Excavating other rocks by blasting removing muck and stacking including all lift, lead upto 90 m, labour and T & P etc required for proper completion of work as per direction of Engineer-in-Charge.
Excavating other rocks by blasting removing muck and stacking including all lift, lead upto 210 m, labour and T & P etc required for proper completion of work as per direction of Engineer-in-Charge.
Earth work in filling by power transport for making embankment for the construction of canal section with lead upto 1.0 Km and lift including cost of soil, labour charges and T & P etc with vibro mechanical compaction to achieve min 95.0 % dry density along with proper dressing and watering to bring at O.M.C. required for proper completion of work .
Earth work in filling by power transport for making embankment for the construction of canal section with lead upto 2.0 Km and lift including cost of soil, labour charges and T & P etc with vibro mechanical compaction to achieve min 95.0 % dry density along with proper dressing and watering to bring at O.M.C. required for proper completion of work .
Earth filling with useful quantity of excvavated ordinary soil earth in making canal section including cost of mechanical compaction ,lead upto 210 m, lift, labour and T&P, royalty and taxes etc required for proper completion of work.
Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.
Providing and laying of 600 mm dia NP-3 hume pipe at crossing of SUKHARA minor at km 25.850 in R.K.C. with excavation, 90 cm width & 8 cm thick sand filling in bottom of pipe, RCC M-25 color joint 50 cm thick surrounding of pipe, 60 cm width 3 mtr length and 1.5 m height of RRM head wall in 1:3 cement and sand mortar in stone masonary with pointing at end and out of crossing of canal including cost of shuttering, 2.50 MT steel reinforcement in RCC . labour , T&P royalty and taxes etc for proper completion of work.
Providing and laying boulder in rock toe in canal filling including cost of boulder, labour, T&P etc required for proper completion of work.
Providing and laying coarse sand in rock toe in canal filling including cost of sand, labour, T&P etc required for proper completion of work.
Providing and laying of Dalla grit 4.75 mm to 20 mm in rock toe in canal filling including cost of stone ballast, labour, T&P etc required for proper completion of work.
Providing and laying stone ballast 25 to 75 mm in rock toe in canal filling including cost of stone ballast, labour, T&P etc required for proper completion of work as per direction of Engineer-in Charge.
Earth work in excavation in foundation in all types of soil mixed with charri, bajari, kankar, soft rock, hard rocks etc. including wet earth work with slush with all lead and lift including back filling and disposal of surplus excavated earth including labours, T&P, taxes etc. for proper completion of the work as per direction of Engineer-in Charge.
M-15 (1:2:4) cement concrete with OPC-43 grade cement, Kanhar river sand FM 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material, labour, T&P, lead & lift, with mechanical mixing and placing of concrete , royalty and all taxes etc. for proper completion of work.
Reinforced cement concrete in M-25 with OPC-43 grade cement, Kanhar river sand FM 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material, labour, T&P, lead & lift with mechanical mixing and placing of concrete, royalty and all taxes etc. but excluding cost of steel reinforcement for proper completion of work.
Centering and shuttering for RCC work including cost of labour, material, T&P, staging etc. required for proper completion of work.
Centering and shuttering for CC work including cost of labour, material, T&P, staging etc. required for proper completion of work.
Cutting, bending, placing and binding of steel reinforcement including cost of all material, labour, T&P, M.S. binding wire and all taxes etc for proper completion of work.
Providing and fixing of G.P. Sheet seal of 20 SWG 300 mm. wide including cost of all materials, labour, T&P, cutting, bending, brazing, crimping etc required for proper completion of work.
Providing and fixing of U type make from 22SWG 470mm. Wide copper seal including cost of all labour, material, T&P, cutting, brazing, crimping etc. for proper completion of work.
Providing and fixing of diamond seal with 2No ISA size 75x75x10 iron flat 150x25x6@200mm. c/c for fixing M.S. sheet of 16 SWG 510mm, 1.63 mm wide 40-80 grade sealing compound including cost of cutting, bending, brazing, crimping etc. required for proper completion of work.
Providing and fixing of PVC water stop seal 225 mm. wide including cost of all labour, material, T&P, cutting, brazing, crimping etc. for proper completion of work.
Providing and fixing of PVC water stop seal 300 mm. wide including cost of all labour, material, T&P, cutting, brazing, crimping etc. for proper completion of work.
Providing and fixing joint filler board 18mm thick in expansion joint including cost of all labour, material, T&P, required cutting, brazing and placing etc. for proper completion of work.
Laying corse sand in filter including cost of all materials, labours, T&P etc. required of all proper completion of work as per direction of Engineer-in-Charge.
Supplying and laying of local sand in back filling including cost of all materials, labours, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Supplying and laying hard stone dalla grit 4.75 mm to 10 mm size in filters and in gaps of C.C. block including cost of all material, labour , T&P lead etc. required for proper completion of work.
Supplying and laying hard stone dalla grit 10 mm to 20 mm size in filters and in gaps of C.C. block including cost of all material, labour , T&P lead etc required for proper completion of work.
Supplying and Laying hard stone dalla grit 20mm to 40 mm size in filter below C.C. block including cost of all materials, labours, T&P etc required for proper completion of work.
Providing and fixing Tarfelt in expansion joint including cost of all labour materials and T&P etc. required for proper completion of work.
Proviniding and fixing 100mm dia PVC pipe including cost of all material, labours, T&P, etc. required for proper completion of the work.
Providing and fixing of drainage G.I.Pipe 50 mm dia including cost of labour materials and T&P etc. required for proper completion of work
Random Rubble Masonery work in cement sand mortar (1:3) with opc 43 grade cement and coarse sand in wings wall and parapet wall including cost of all materials, labour, T&P etc required for proper completion of work.
Struck deep Pointing work for exposed surface of stone masonry in 1:2 CM with OPC-43 grade cement, coarse sand including cost of all material, labour and T&P etc required for proper completion of work.
Earth work in back filling in back of Abutment and wing wall including all lead, lift labours, T&P, royalty and all taxes etc. for proper completion of the work.
Earth work In making drain diversion work to facilitate proposed work on site properly with manual compaction including cost of all lead, lift, labour, T&P, taxes etc. for proper completion of the work.
Laying of Stone boulder for pitching in launching apron side pitching beyond L.A. bed and pitching at side slope of earth filling over box culvert including cost of all materials labours T&P , royalty and all taxes etc required for proper completion of the work.(weight not less than 40 kg)
Dewatering of Foundation by hiring diesel pump 5 HP/Electric motor of same capacity including operator cost, cost of dewatering equipment and its accessories, labour etc.
Providing & Fixing NP-3 1200 mm Ø HUME PIPE including cost of hume pipe, carriage, labour, T&P etc. required for proper completion of work.
Providind & fixing NP-3 1500 mm Ø HUME PIPE including cost of hume pipe, carraige, labour,T&P etc required for proper completion of work.
Fabrication of Steel Gate and Hosting Arrangement including cost of all materials, labour, T&P, etc. required for proper completion of work.
Poviding & Fixing of Angle Iron post (75xx75x10mm.) including cost of all material, labour and T&P etc. required for proper completion of work.
Providing and Fixing, Fabrication Erection Trash Rack including cost of all materials, labour, T&P, etc. required for proper completion of work.
M/S ARUN CONSTRUCTION (BID ID -5109365)
HES INFRA PRIVATE LIMTED (BID ID -5108082)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf