Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC | L1 | Accepted-AOC OK | |
| 2 | L2₹2.4 L+₹8,263 (3.50%)Rejected-Finance | L2 | Rejected-Finance Quoted higher rates |
Tender Value
₹2.0 L
EMD Value
₹1,960
Closing Date
2 Nov 2019, 5:00 pmClosed
EE (Civil) Jabalpur
Shed No. 9 Rampur Jabalpur
INTERNAL AND EXTERNAL CLEANING AND SWEEPING WORK OF TECHNICAL TRAINING CENTER BUILDING SHANINAGAR KATNI. (PERIOD 12 MONTHS)
2019_PKVVC_56612_1
TS13
Open Tender
Civil Works - Buildings
Item Rate
365 days
SE (Civil) Jabalpur
Please refer Tender documents.
4 documents required · 4 mandatory
₹560
Yes
Payable To
₹1,960
Yes
19 Jun 2020
7 Oct 2019
4 Nov 2019
7 Oct 2019
2 Nov 2019
18 Oct 2019
Amount
Dry sweeping of all kota stone floors staircases entrance, elevators terraces etc with soft brooms including collection of debries,dust and waste paper etc and disposing it at suitable locations as directed by engineer in charge i/c all lead and lift cost of all tools and tacles materials labour etc required for complete works as per instructions of eng-in-charge. (a) office areas i) Frequency - once in a day. ii) Qty for sweep per day - 410 sqm. iii) Total Frequency per year - 300. iv) Unit - 100 m2 per sweep v) Total Qty - 410 x 300 = 123000/100 = 1230
Dry sweeping of all kota stone floors staircases entrance, elevators terraces etc with soft brooms including collection of debries,dust and waste paper etc and disposing it at suitable locations as directed by engineer in charge i/c all lead and lift cost of all tools and tacles materials labour etc required for complete works as per instructions of eng-in-charge. (b) Entrance cooridors and staircase i) Frequency - twice in a day. ii) Qty for sweep per day - 90 x 2 = 180 sqm. iii) Total Frequency per year - 300. iv) Unit - 100 m2 per sweep v) Total Qty - 180 x 300 = 54000/100 = 540
Dry sweeping of all kota stone floors staircases entrance, elevators terraces etc with soft brooms including collection of debries,dust and waste paper etc and disposing it at suitable locations as directed by engineer in charge i/c all lead and lift cost of all tools and tacles materials labour etc required for complete works as per instructions of eng-in-charge. (c) Terrace i) Frequency - once in a month. ii) Qty for sweep per day - 200 sqm. iii) Total Frequency per year - 12. iv) Unit - 100 m2 per sweep v) Total Qty - 200 x 12 = 2400/100 = 24
Moping/Wetsweeping for all floors.enterence,coridors etc with phenyl water (by using phenyl of approved quality like product bengal chemical ltd)as per instructions of eng-in-charge with cotton threded mopper of approved quality i/c cost of all tools and tacles materials labour etc required for complete works as per instructions of eng-in-charge i) Frequency - once in a day. ii) Qty for sweep per day - 700 sqm. iii) Total Frequency per year - 300. iv) Unit - 100 m2 per sweep v) Total Qty - 700 x 300 = 210000/100 = 2100
Washing/cleaning of floors dado skirting i/c dodo skirting of kichens and toilets having height more then 30cm by approved washing powder/soap andfallowing dring with clean cloth and removing waste materials from dust bin and disposel at specified location decided by eng-in-charge cleaning of all materials labours, tools and tacles materials labour etc required for complete works as per instructions of eng-in-charge (a) General kitchen i) Frequency - once in a day. ii) Qty for sweep per day - 1 nos. iii) Total Frequency per year - 300. iv) Unit - each v) Total Qty - 1 x 300 = 300
Washing/cleaning of floors dado skirting i/c dodo skirting of kichens and toilets having height more then 30cm by approved washing powder/soap andfallowing dring with clean cloth and removing waste materials from dust bin and disposel at specified location decided by eng-in-charge cleaning of all materials labours, tools and tacles materials labour etc required for complete works as per instructions of eng-in-charge (b) General toilet i) Frequency - twice in a day. ii) Qty for sweep per day - 2x15 = 30 nos. iii) Total Frequency per year - 300. iv) Unit - each v) Total Qty - 30 x 300 = 9000
Washing/cleaning of floors dado skirting i/c dodo skirting of kichens and toilets having height more then 30cm by approved washing powder/soap andfallowing dring with clean cloth and removing waste materials from dust bin and disposel at specified location decided by eng-in-charge cleaning of all materials labours, tools and tacles materials labour etc required for complete works as per instructions of eng-in-charge (c) Attached toilet/bathroom i) Frequency - once in a day. ii) Qty for sweep per day - 7 nos. iii) Total Frequency per year - 300. iv) Unit - each v) Total Qty - 7 x 300 = 2100
Cleaning / removel of cobwebs from each and every rooms walls of block i/c toilets kichen terraces enterance staircases corridors etc from inside and outside complete at all floors at various elevations as per instructions of eng-in-charge (a) for building i) Frequency - once in a month. ii) Qty for sweep per day - 12 nos. iii) Total Frequency per year - 1. iv) Unit - per building v) Total Qty - 12 x 1 = 12
dusting both side of doors and windows i/c shutter,glass panels,grills etc i/c all material tools and tacles materials labour etc required for complete works as per instructions of eng-in-charge i) Frequency - once in a week. ii) Qty for sweep per day - 200 sqm. iii) Total Frequency per year - 50. iv) Unit - 100 m2 per cleaning v) Total Qty - 200 x 50 = 10000/100 = 100
cleaning of glass panels of windows(eigther side with cleaning chemicals,colin i/c all material tools and tacles materials labour etc required for complete works as per instructions of eng-in-charge. i) Frequency - once in a week. ii) Qty for sweep per day - 100 nos. iii) Total Frequency per year - 50. iv) Unit - 100 m2 per cleaning v) Total Qty - 100 x 50 = 5000/100 = 50
Disinfectin of toilets sink,kichen sink,washbasins equivelent fixtures in kichen and toilets with harpic or other sanitary cleaner cost of all tools and tacles materials labour etc required for complete works as per instructions of eng-in-charge. (a) Kitchen sink i) Frequency - once in a week. ii) Qty for sweep per day - 2 nos. iii) Total Frequency per year - 50. iv) Unit - each v) Total Qty - 2 x 50 = 100
Disinfectin of toilets sink,kichen sink,washbasins equivelent fixtures in kichen and toilets with harpic or other sanitary cleaner cost of all tools and tacles materials labour etc required for complete works as per instructions of eng-in-charge. (b) wash basin, urinals i) Frequency - once in a week. ii) Qty for sweep per day - 18 nos. iii) Total Frequency per year - 50. iv) Unit - each v) Total Qty - 18 x 50 = 900
Disinfectin of toilets sink,kichen sink,washbasins equivelent fixtures in kichen and toilets with harpic or other sanitary cleaner cost of all tools and tacles materials labour etc required for complete works as per instructions of eng-in-charge. (c ) WC seat i) Frequency - once in a week. ii) Qty for sweep per day - 9 nos. iii) Total Frequency per year - 50. iv) Unit - each v) Total Qty - 9 x 50 = 450
Providing air freshnercake(50 gms) each of approved make in toilets as per instructions of eng-in-charge. i) Frequency - once in a month. ii) Qty for sweep per day - 18 nos. iii) Total Frequency per year - 12. iv) Unit - each v) Total Qty - 18 x 12 = 216
Providing napthalins bolls in urinals pots/wash basin of toilets in sufficient quantity as per instructions of eng-in-charge. i) Frequency - twice in a month. ii) Qty for sweep per day - 18 nos. iii) Total Frequency per year - 24. iv) Unit - each v) Total Qty - 18 x 24 = 432
sweeping and cleaning of areas of front and back side of both building approach and roads,2wheelar and 4 wheeler parking area and all area inside compound wall. i) Frequency - once in a day. ii) Qty for sweep per day - 300 sqm. iii) Total Frequency per year - 3145. iv) Unit - 100 m2 per sweep v) Total Qty - 300 x 3145 = 943500/100 = 9435
Cleaning of all type of drains of any size and depth i/c removal of deposited spoil vegitation waste and other garbage brick bats hedge waste uprooting and removal of gazer grass and other plants collecting and disposal of the same as per direction of eng-in-charge. i) Frequency - once in a month. ii) Qty for sweep per day - 1 sqm. iii) Total Frequency per year - 12. iv) Unit - per job v) Total Qty - 1 x 12 = 12
Cleaning of sewer line,manholes i/c disposal of waste materials etc as per direction of eng-in-charge. i) Frequency - once in a month. ii) Qty for sweep per day - 1 sqm. iii) Total Frequency per year - 12. iv) Unit - per job v) Total Qty - 1 x 12 = 12
AMAN TRADERS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .