Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-Finance | L1 | Accepted-Finance Accept | |
| 2 | L2₹6.5 L+₹37,973.35 (6.22%)Rejected-Finance | L2 | Rejected-Finance Reject | |
| 3 | L3₹6.7 L+₹61,715.36 (10.1%)Rejected-Finance | L3 | Rejected-Finance Reject |
Tender Value
₹6.9 L
EMD Value
₹6,942
Closing Date
12 Jun 2026, 5:30 pmClosed
SURESH KUMAR AHIRWAR
GWALIOR MUNICIPAL CORPORATION
Construction Of Drian at Village Kumarpura Maszid se Kuarpur Main Road tak . ward No. 63. Zone 23 File No. 93/25X3/6.
2026_UAD_510934_1
MPGMC/93/25x3/6/jan/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
JANKARYA DEPARTMAENT
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹6,942
6 Jul 2026
27 May 2026
15 Jun 2026
28 May 2026
12 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthworkinexcavationforfoundation,trenchesfor pipes/cablesordrainsetc.bymechanicalmeans/
manualmeans(exceeding30cmindepth.)including
rammingofbottom,dressingofsides,disposalofexcavated earthincludingofallliftandleadupto50m. Disposedearth to be levelled and neatly dressed.KINDS OF Soil | - | cum | - | - |
| 2 | 1.0 Transportation By Mechanical means including loading, unloading and stacking where ever necessary 1.1 Excavated Earth 3km or part thereof | - | cum | - | - |
| 3 | 4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centeringand shuttering All work up to plinth
level.4.1.6 Cement concrete grade M-10(NominalMix) with40mm maximum size of stone aggregate | - | cum | - | - |
| 4 | 5.11 Reinforc ement forR.C.C.work including straighten ing, cutting, bending ,placing in position and binding uptofloorlevelincludingcost of binding wire, wastage and over lap supto 12mm horizontal /inclined positionofre inforcement bars in slabandbeams, plinth, chajjas, lintels, upto4.5mverticallengthofre inforcementinwall colum ns(overlapsshall be providedasperr equirement of IS:13920;IS456&SP:34) etc. complete. 5.11.4Thermo-Mechanically Treated bars. (Fe 500 D or more) kilogram 58.00 FOR USHAPE distributon bars Walls +BASE Main bare | - | kg | - | - |
| 5 | 19.1Centeringandshutteringincludingstrutting,proppingstretchingetc.Complete for and removal of formworkby sheetplate or plywood 19.1.2 Walls (anythickness)including attachedpilasters,butteresses,plinth and string courses etc shuttering for : | - | sqm | - | - |
| 6 | 5.1 Providing and laying in position specifiedgrade of reinforcedcement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :5.2.1 Cementconcretegrade M20 (NominalMix) with 20mm maximum size of stone aggregate.FOR BASE FOR WALLS | - | CUM | - | - |
| 7 | 2.18Supplyingandfillinginplinthunderfloorsincluding,
watering, ramming consolidating and dressing complete.Moorum/Hard copra | - | CUM | - | - |
| 8 | Providingandlayingnon-pressureNP2class(lightduty)R.C.C.
pipeswithcollarsjointedwithstiffmixtureofcementmortarinthe
proportionof1:2(1cement:2finesand)includingtestingofjoints
etc. complete :22.6.1100 mm dia. R.C.C. pipe | - | RM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.66 MB
TenderDocument.pdf
Tender Documents • 2.87 MB
BOQ_615442.xls
BOQ • 0.24 MB
Estimete93.pdf
Additional Documents • 1.32 MB
Drawing93.pdf
Additional Documents • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .