Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.3 LAccepted-AOC 0 SHANKERPURI COLONY SAHARANPUR BEHAT ROAD NEAR DEHAT KOTWALI SAHARANPUR UTTAR PRADESH 247001 | SAHARANPUR | UTTAR PRADESH | 247001 | 1 | Accepted-AOC Eligible L-1 bidder | |
| 2 | 2₹4.8 L+₹44,049.92 (10.2%)Rejected-Finance 100 33 1 R G S ROAD USHAGRAM ASANSOL SALANPUR PASCHIM WEST BURDWAN BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | PASCHIM BARDHMAN | WEST BENGAL | 713303 | 2 | Rejected-Finance quoted more than L-1 bidder | |
| 3 | 3₹4.9 L+₹56,294.12 (13.0%)Rejected-Finance DUTTA BAGAN SEN RALEIGH ROAD ASANSOL BARDHAMAN BARDHAMAN 713305 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713305 | 3 | Rejected-Finance quoted more than L-1 bidder |
Tender Value
₹4.2 L
EMD Value
₹5,300
Closing Date
29 Dec 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AE EnM
ECL sonepur bazari area
Compleate Rewinding of 410 KW, 6.6 KV, Marathon Make SI NO MH-6, 3 Phase, Sq cage induction motor of S.B. Project
2022_ECL_264825_1
GM/SBA/EnM/e-Tender/2022-23/ 599
Open Tender
Electrical and Maintenance Works
Item Rate
45 days
ECL sonepur bazari area
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,300
19 Feb 2023
17 Dec 2022
31 Dec 2022
19 Dec 2022
29 Dec 2022
19 Dec 2022
19 Dec 2022 - 22 Dec 2022
Amount
Item Description/ Heading
Material Cost
Material cost for supply of electrolyte copper conductor with Class-F insulation new coil.
Material cost for Supply of tape suitable for HT motor
Material cost for supply of nomex paper for starter core insulation
Material cost for supply of varnish suitable for HT motor
Material cost for supply of thinner suitable for HT motor
Material cost for Cost of HT XLPE Cable Core 70 sq mm
Labour Cost:-
labour cost for taking out of the coils from the stator slots & cleaning/ decarburizing of core slots.
labour cost for formation of coils with the converted DGC Copper conductor
labour cost for inter layer insulation of the coils to be done with Kafton tape
labour charges for insulation of overhung portion of the coils with GMP & GM tape
labour cost for moulding the coils with mica thermo & mica folium by taking.
labour cost for inserting of the coils into the core slots in chronological manner
labour cost for inserting of silicon base glass wedges
labour cost for charges for dynamic balancing
labour cost for testing charges of rewound stator
Transportation charges up and down
Less: Cost of scrap copper wire
P.F. Amount on Labour Cost
Total impact of GST for the purpose of CTC
ELECTRO POWER INDUSTRIES
JUBILEE ELECTROMECH WORKS
stage.html
html • 0.04 MB
techsummary_273915.pdf
PDF • 1.39 MB
finsummary_273915.pdf
PDF • 1.39 MB
wo599.pdf
PDF • 1.84 MB
finance_273915.pdf
PDF • 0.25 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .