| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.9 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹29.8 L+₹1.4 L (4.86%)Rejected-AOC | L2 | Rejected-AOC Lowest bidder is M/s Rajesh Builders | |
| 3 | L3₹32.7 L+₹4.3 L (15.1%)Rejected-AOC | L3 | Rejected-AOC Lowest bidder is M/s Rajesh Builders | |
| 4 | Rejected-Technical WZ 409 0 B 1ST FLOOR PLOT NO 12 JANAK PARK HARI NAGAR NEW DELHI 110064 | NEW DELHI | WEST DELHI | DELHI | 110064 | - | Rejected-Technical No in WLR SWC |
Tender Value
₹35.3 L
EMD Value
₹70,600
Closing Date
2 Jun 2020, 6:00 pmClosed
Col Avik Saxena
CWE Bikaner
COMPREHENSIVE PREVENTIVE AND PERIODICAL MAINTENANCE OF AC PLANT AND ALLIED WORKS UNDER GE (A) SURATGARH
2020_MES_338893_2
CWE BKN Token No 01 OF 2020-2021
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
Suratgarh
he firms not enlisted with MES shall meet the enlistment criteria of D class MES contractors category ci
ie with regard to having satisfactorily completed requisite
7 documents required · 7 mandatory
₹500
Yes
GE (A) Suratgarh
₹70,600
Yes
14 Jul 2020
13 May 2020
4 Jun 2020
13 May 2020
2 Jun 2020
20 May 2020
13 May 2020 - 18 May 2020
Amount
Comprehensive preventive & periodical maintenance of Central Air Conditioning Plant including its associated equipments comprising of chiller unit, condenser unit, AHU, humidifiers, hot water generator, cooling tower, etc of capacity 3 x 270 TR of make - Carrier & Model - 19XR 2222267 JEH 52 installed at 184 Military Hospital including servicing of AC Plant by authorized company representative (Carrier Company Ltd) to check and inspect all air release valves, Gas pipe line, cleaning and setting of sensors, checking of control panels, checking of cooling and heating system, inspection of all type of filters for smooth & trouble free functioning of AC Plant complete all as specified and as directed. Note :- Servicing & maintenance of AC plant shall be carried out through authorized service agency of manufacturer (i.e Carrier Company representative). The contractor shall submit documentary proof/evidence in this regard before taking plants under servicing etc.
Comprehensive preventive & periodical maintenance of Central Air Conditioning Plant including its associated equipments comprising of chiller unit, condenser unit, AHU, humidifiers, hot water generator, cooling tower, etc of capacity 3 x 26 TR of make - Blue Star & Model - SWC-2S-026 AR2 installed at Dugout Signal including servicing of AC Plant by authorized company representative (Blue Star) to check and inspect all air release valves, Gas pipe line, cleaning and setting of sensors, checking of control panels, checking of cooling and heating system, inspection of all type of filters for smooth & trouble free functioning of AC Plant complete all as specified and as directed. Note :- Servicing & maintenance of AC plant shall be carried out through authorized service agency of manufacturer (i.e Blur Star Company representative). The contractor shall submit documentary proof/evidence in this regard before taking plants under servicing etc.
Comprehensive preventive & periodical maintenance of Central Air Conditioning Plant including its associated equipments comprising of chiller unit, condenser unit, AHU, humidifiers, hot water generator, cooling tower, etc of capacity 3 x 26 TR of make - Blue Star & Model - SWC-2S-026 AR2 installed at Dugout Ops Room including servicing of AC Plant by authorized company representative (Blue Star) to check and inspect all air release valves, Gas pipe line, cleaning and setting of sensors, checking of control panels, checking of cooling and heating system, inspection of all type of filters for smooth & trouble free functioning of AC Plant complete all as specified and as directed. Note :- Servicing & maintenance of AC plant shall be carried out through authorized service agency of manufacturer (i.e Blur Star Company representative). The contractor shall submit documentary proof/evidence in this regard before taking plants under servicing etc.
Comprehensive preventive & periodical maintenance of Central Air Conditioning Plant including its associated equipments comprising of chiller unit, condenser unit, AHU, humidifiers, hot water generator, cooling tower, etc of capacity 3 x 39 TR of make - Blue Star & Model - XWCS-3039 AR2 installed at 6006(I) EME Wksp including servicing of AC Plant by authorized company representative (Blue Star) to check and inspect all air release valves, Gas pipe line, cleaning and setting of sensors, checking of control panels, checking of cooling and heating system, inspection of all type of filters for smooth & trouble free functioning of AC Plant complete all as specified and as directed. Note :- Servicing & maintenance of AC plant shall be carried out through authorized service agency of manufacturer (i.e Blur Star Company representative). The contractor shall submit documentary proof/evidence in this regard before taking plants under servicing etc.
Comprehensive preventive & periodical maintenance of Central Air Conditioning Plant including its associated equipments comprising of chiller unit, condenser unit, AHU, humidifiers, hot water generator, cooling tower, etc of capacity 2 x 22 TR of make - Voltas & Model - WCD-S025DPMN-2X1 installed at 10 Corps Zonal Wksp including servicing of AC Plant by authorized company representative (Voltas) to check and inspect all air release valves, Gas pipe line, cleaning and setting of sensors, checking of control panels, checking of cooling and heating system, inspection of all type of filters for smooth & trouble free functioning of AC Plant complete all as specified and as directed. Note :- Servicing & maintenance of AC plant shall be carried out through authorized service agency of manufacturer (i.e Voltas Company representative). The contractor shall submit documentary proof/evidence in this regard before taking plants under servicing etc.
Notes aplicable to serial item No. 1 to 5 here-in-before :- (i) Comprehensive preventive & periodical maintenance of AC Plant includes ensuring optimal functioning of AC Plant in Summer, Monsoon and Winter season as per the period of contract including periodical checks i.e. quarterly maintenance (in every three months) requirement as per manufacturer's instructions. The job covers daily upkeep of AC Plant comprising of chiller unit i.e. condenser, chiller, etc. complete with electric motor including pan type humidifiers of different KW ratings, complete ducting, fan coil units, cooling tower, hot water generator and its piping network, chilled water piping, condenser piping, pump and motors of chilled water and condenser and cooling towers, water supply piping, instrument starter, connected control cabling/wiring including electrical panels with switchgear (except compressor unit) for smooth & efficient performance of AC plant to achieve desired inside conditions throughout the season all as specified & as directed. (ii) The job also includes cleaning of entire AC Plant installation and cost thereof shall deemed to be included in the unit rate quoted against this item. (iii) Contractor shall provide technically qualified person for attending the fault within 24 hours of intimation by rep of MES. If the AC plant is off load/break down for more than 24 hours, a penalty at the rate of Rs. 5000/- per day shall be levied and deducted from the contractor's payment. (iv) Contractor shall maintain temperature of AC Plant at 20±5 degree Celsius and RH 50 ± 5%. (v) During entire contract period any defective components or any other material which is not specified in Sch 'A' but required for repair/replacement to make plant/machinery fully functional, the cost of same shall be deemed included in quoted rates and nothing extra shall be paid to the contractor on this account. The transportation and other necessary equipments shall be arranged/brought by the contractor. Hence the bidder is advised to visit the site and assess the quantum of the work to be carried out in the contract and quote their rate accordingly. (vi) Make and model of part to be replaced shall be same as existing at site or as per OEM recommendation. (vii) Comprehensive /Periodic maintenance means ensuring optimal functioning of AC plant by synchronising all levels at no extra cost. (viii) All above points mentioned in notes for the period of three months shall be considered as one Job. (ix) Periodic maintenance shall take place at every three month or as directed by GE/CWE. (x) Each Job shall be measured and paid in three calendar months. (xi) All installations & surrounding area shall be kept neat and clean all the time by the contractor’s workmen and quoted rate shall deemed to include this provision.
Descaling copper tubes of condenser and chiller of the following unit by company representative using suitable chemical viscous compound as per manufacturer’s instructions, cleaning of copper tubes with brush, including circulation of chemical viscous compound by submersible pump and removing all foreign material settled inside condenser and chiller unit, with & including replacement of gasket, washers and other materials required for descaling, complete all as specified and as directed :-
AC Plant 3x270 TR
AC Plant 3x26 TR
AC Plant 3x39 TR
AC Plant 2x22 TR
M&L for servicing of AHU comprising of cleaning inside & outside by vacuum cleaner and chemical (ISI marked) as recommended by OEM, washing/cleaning of filters, oiling/greasing of moving parts of capacity as under :- Note : Existing AHU shall be serviced two times on requirement basis as directed during the contract period and each time servicing shall be measured as one Job. Thus the quantities of serial item No. 7.01 to 7.04 here-in-after is the double of existing AHUs.
3000 CFM to 5000 CFM
5001 CFM to 10000 CFM
10001 CFM to 15000 CFM
15001 CFM to 17000 CFM
Supply only true Pre filter with bag filter of size 610 x 610 x 50 mm with collection efficiency not less than 90% for particles of size down 10 micron, for replacement during maintenance / servicing of unit under relevant item of this Schedule, complete all as specified and as directed. Make : Athlete / Johnson / Thermadyne / Camfil
Supply only Refrigerant 'HFC-134a' for compressor of AC plant of capacity 270 TR for replacement under respective item complete all as specified and as directed.
Supply only compressor oil suitable for centrifugal compressor of AC plant of capacity 270 TR of make as recommended by OEM (i.e Carrier) for replacement under respective item complete all as specified and as directed.
M&L for repair and servicing of cooling tower by disconnecting & re-assembling all electrical connections and mechanical parts from cooling tower of capacity 270 TR AC Plant and cleaning, oiling, greasing, etc and replacement of faulty parts, complete all as specified & as directed. Note : Faulty parts required for replacement and given under this Schedule shall be paid separately as "Supply only".
Supply only PVC fills of size 600mm x 300mm x 150mm of thickness 0.25mm each flute size 12mm, double edge folded with same sheet including supporting arrangement for cooling tower complete all as specified and as directed.
Supply only PVC drift eliminator including connected accessories as per existing size and type for cooling tower of capacity 270 TR AC Plant complete all as specified and as directed.
Supply only rotating sprinkler including connected accessories as per existing size and type for cooling tower of capacity 270 TR AC Plant complete all as specified and as directed.
M&L for strip opening & re-assembling condenser and evaporator chiller unit of capacity 270 TR AC Plant and pumping down the Plant to preserve the existing refrigerant gas (R-134a) and leak testing of Plant by charging of Nitrogen gas in the entire plant and monitoring for 08 hours including leakages, rectification of leakage by brazing and replacement of necessary gaskets packing wherever required including copper tubes of suitable size, vacuumising the plant by vacuum pump etc complete all as specified and as directed. Note : Nitrogen gas shall be measured & paid for separately as ‘Supply only'.
Supply only Nitrogen gas for detecting the gas leakage under serial item No. 15 here-in-before complete all as specified and as directed.
S&F in replacement oil transducer for circuit of compressor of capacity 270 TR AC Plant of make - Carrier including connected accessories and testing complete all as specified and as directed.
S&F in replacement fully automatic single phase oil pump for chiller unit of capacity 270 TR AC Plant of make-Carrier including connected accessories and testing complete all as specified and as directed.
BLANK
S&F in replacement internal oil filter including motor cooling driers for chiller unit of capacity 270 TR AC Plant of make - Carrier complete all as specified and as directed.
BLANK
S&F in replacement high pressure switch for chiller unit of capacity 270 TR AC Plant of make - Carrier complete all as specified and as directed.
S&F in replacement immersion type temperature sensors PT-1000 in chillers / hot water generators / chilled water lines including making mounting arrangement complete as required for temperature range 0°C to 71°C suitable for chiller unit of capacity 270 TR AC Plant of make - Carrier complete all as specified and as directed.
S&F in replacement differential pressure sensor in chillers / hot water generators / chilled water lines including making mounting arrangement suitable for chiller unit of capacity 270 TR AC Plant of make - Carrier complete all as specified and as directed.
S&F in replacement SS type suction strainer filter for high-pressure suction lines of oil pumps suitable for chiller unit of capacity 270 TR AC Plant of make - Carrier complete all as specified and as directed.
S&F in replacement finned strip heaters of capacity 2.5 KW single phase 230 Volt made out of stainless steel for heating system of AC Plant 270 TR capacity complete all as specified and as directed.
S&F in replacement direct mounting bottom type 100mm HVAC bimetal chiller water thermometer for temperature range 0°C to 120°C complete all as specified and as directed.
S&F in replacement direct mounting bottom type pressure gauge 0-10 Kg/sqcm with psi 50mm dia complete all as specified and as directed.
M&L for repair of ICVC Card of 3x270 TR AC Plant and necessary programming for controller panel including replacement of defective components to make ICVC Card fully functional complete all as specified and as directed. Note : The cost of components, repair and programming shall deemed to be included in the quoted rates and no extra payment shall be paid to contractor on this account. Hence the tenderers are advised to visit the site and assess the quantum of work to be carried out in ICVC Card and quote their rate accordingly.
S&F in replacement Master control board (ISM Card) including connected accessories for chiller unit of capacity 270 TR AC Plant of make - Carrier complete all as specified and as directed.
S&F in replacement compressor protection module (CCN) card for chiller unit suitable for 270 TR AC Plant of make - Carrier including testing complete all as specified and as directed.
S&F in replacement microprocessor based chiller controller Carrier Comfort Network (ICVC) for operation of chiller unit in safe and efficient manner for chiller of make - Carrier suitable for AC Plant of capacity 3x270 TR including necessary programming and testing complete all as specified and as directed.
M&L for taking down defective electric motor, squirrel cage type of any make, from base plate after unscrewing nuts, bolts of foundation/ coupling 3 phase, 415/440 volts, 50 Hz, AC of capacity 3 HP, shifting the same to workshop, strip opening after un-screwing nuts, bolts/ screws etc, taking out rotor from stator, cutting and taking out burnt winding carefully from the stator, cleaning of slots, rewinding of stator with super enamelled copper winding wire of appropriate size matching with manufacturer's design including replacement of all insulating materials such as glass paper, leathered paper, PVC insulated copper conductor wire connection leads of appropriate size with sleeves of suitable size upto terminal connection box, varnishing, drying up, re-assembling, refixing and re-installation at site complete and testing on load complete all as specified and as directed. Notes : (i) Necessary T&P such as chain pulley block etc and transportation shall be contractor's responsibility. (ii) The work of repair/ replacement under this item shall be carried out within a period of 72 hours after intimation by the Engineer-in-Charge failing which a recovery @ 10% of contractor’s quoted rate for this item for delay of every 24 hours or part thereof after stipulated period of 72 hours shall be made from contractor’s payment. However, total recovery shall not be more than contractor’s quoted rate for this item.
All as per serial item No. 33 here-in-before but motor of capacity 5 HP.
All as per serial item No. 33 here-in-before but motor of capacity 7.5 HP.
All as per serial item No. 33 here-in-before but motor of capacity 10 HP.
All as per serial item No. 33 here-in-before but motor of capacity 30 HP.
M&L for taking down carefully centrifugal pump set of 30 HP capacity, discharge 67.5 LPS at 24 mtr head by disconnecting the pump from motor after unscrewing nuts/ bolts of coupling, foundation, inlet, delivery pipes and shifting of pump to workshop for repair/servicing, comprising strip opening of pump, replacement of defective parts, carrying out necessary lathe work, re-assembling and shifting from workshop to site, re-installation at location as directed by Engineer-in-Charge, testing on load, complete all as specified and as directed. Make of Pump : Kirloskar Note : Unserviceable parts required for replacement shall be measured & paid separately as "Supply only" under serial item No. 38.01 to 38.06 here-in-after.
Supply only SS pump shaft for 30 HP pump as per manufacturer's design complete all as specified and as directed.
Supply only bronze impeller complete with impeller key for 30 HP pump as per manufacturer's design complete all as specified and as directed.
Supply only stuffing box packing and greasing suitable for 30 HP motor pump as per manufacturer's design complete all as specified and as directed.
Supply only ball bearing (roller / thrust / any other type) DE/NDE suitable for 30 HP motor pump as per manufacturer's design complete all as specified and as directed.
Supply only bearing housing (DE & NDE) of CI grade FG 210 suitable for 30 HP motor pump as per manufacturer's design complete all as specified and as directed.
Supply only pump shaft sleeve made of gun metal suitable for 30 HP motor pump as per manufacturer's design complete all as specified and as directed.
M&L for taking down carefully centrifugal pump set of 7.5 HP capacity, discharge 18 LPS at 20 mtr head by disconnecting the pump from motor after unscrewing nuts/ bolts of coupling, foundation, inlet, delivery pipes and shifting of pump to workshop for repair/servicing, comprising strip opening of pump, replacement of defective parts, carrying out necessary lathe work, re-assembling and shifting from workshop to site, re-installation at location as directed by Engineer-in-Charge, testing on load, complete all as specified and as directed. Make of Pump : Kirloskar Note : Unserviceable parts required for replacement shall be measured & paid separately as "Supply only" under serial item No. 39.01 to 39.06 here-in-after.
Supply only SS pump shaft for 7.5 HP pump as per manufacturer's design complete all as specified and as directed.
Supply only bronze impeller complete with impeller key for 7.5 HP pump as per manufacturer's design complete all as specified and as directed.
Supply only stuffing box packing and greasing suitable for 7.5 HP motor pump as per manufacturer's design complete all as specified and as directed.
Supply only ball bearing (roller / thrust / any other type) DE/NDE suitable for 7.5 HP motor pump as per manufacturer's design complete all as specified and as directed.
Supply only bearing housing (DE & NDE) of CI grade FG 210 suitable for 7.5 HP motor pump as per manufacturer's design complete all as specified and as directed.
Supply only pump shaft sleeve made of gun metal suitable for 7.5 HP motor pump as per manufacturer's design complete all as specified and as directed.
S&F in replacement Fan Belt for AHU induction motor suitable for 3/5/7.5 HP motor of any size all as specified and as directed.
S&F in replacement fully automatic star delta starter suitable for 5 HP to 7.5 HP electric induction motor connection by using lugs/thimbles complete all as specified and as directed.
M&L in replacement Contactor, 3 Pole, AC3 rating, 40 Amp, AC operated, 415 Volt, 3 Phase complete all as specified and as directed. Make : Type ML-3 AC of L&T or equivalent in makes mentioned in Appendix 'B' here-in-after.
S&F in replacement Single Phasing Preventer, 415 Volts AC complete all as specified and as directed.
M&L in replacement Bakelite fuse grip 32 Amps complete all as specified and as directed. Make : L&T / ABB / Siemens / C&S / Havells / GE
S&F in replacement indicating lamps (Set of three) in existing LT Panel board of type integrated LED lamp for operating voltage 240 volt AC complete all as specified and as directed.
S&F in replacement digital Voltmeter 0-500 Volts range complete all as specified and as directed.
S&F in replacement digital Ammeter 0-200A range complete all as specified and as directed.
M&L for preparation of old painted surfaces of all MS pipes inside & outside the building of AC Plant including cooling towers of capacity 270 TR at MH and painting with two coats of synthetic enamel paint of approved tint complete all as specified and as directed.
M&L in replacement MS pipe flanged type 80 mm bore heavy grade (ISI marked) including drilling, cutting, bending & welding in required shape including nuts, bolts, washers, rubber gasket complete all as specified and as directed.
M&L in replacement MS pipe flanged type 65 mm bore heavy grade (ISI marked) including drilling, cutting, bending & welding in required shape including nuts, bolts, washers, rubber gasket complete all as specified and as directed.
M&L in replacement Gun metal, globe or gate valve, with iron wheel head, screwed both ends for iron pipe and fixed of size 25mm bore, ISI marked,complete all as specified and as directed.
M&L in replacement Gun metal, globe or gate valve, with iron wheel head, screwed both ends for iron pipe and fixed of size 20mm bore, ISI marked,complete all as specified and as directed.
M&L in replacement Cast Iron butterfly valve of size 150mm dia, gear operated, Stainless steel disc, EPDM rubber lining, Class PN-16, ISI marked, complete all as specified and as directed.
BHADU BUILDERS
NATIONAL ASSOCIATES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .